Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 202 TIRUPATI INDUSTRIAL ESTATE 202 TIRUPATI INDUSTRIAL ESTATE SUBHASH NAGAR BHANDUP WEST BHANDUP WEST MUMBAI CITY MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Admitted-Finance |
| 2 | Admitted-Finance 11 RK INDUSTRY HOUSE 11 R K INDUSTRY WALBHAT ROAD WALBHOT ROAD GOREGAON EAST MUMBAI MAHARASHTRA 400063 | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | Admitted-Finance |
| 3 | Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
23 Dec 2020, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
REMOVAL OF AK 100 AND INSTALLATION OF SRGM ONBOARD INS MUMBAI
2020_NAVY_399954_1
DYT/WPM/20-21/ PL-IN/INSTALLATION SRGM-INS MBI/123
Open Tender
Miscellaneous Services
Item Rate
540 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
NAVAL DOCKYARD MUMBAI
3 Apr 2021
2 Dec 2020
24 Dec 2020
2 Dec 2020
23 Dec 2020
11 Dec 2020
11 Dec 2020
180 days
Amount
Service - Degutting and removal of following equipment from AK 100 Equipment Room (i) DB (P)(P)1-(D)(Dimension 738*484*177mm) (ii) DB (P)(P)-2(D) (Dimension 734*484*177mm ), (iii) HCOS Qty-02(Dimension 530*280*177mm), (iv) Rectifier (Dimension 634*380*282mm ), (v) Filter Unit(Dimension 500*380*mm), (vi) JB (P)c-1(D) (Dimension 520*430*152mm ) (vii) JB (P)c-2(D)(Dimension 515*425*152) (viii) Start Station (Dimension 737*730*484mm), (ix) (C)a-2 Board(Dimension 200*180*180mm) (x) (C)A-3 Board(Dimension 300*180*200mm)
Service - Degutting and removal of following equipment from AK 100 Equipment Room (i) Amplidyne (Dimension 345*280*965mm) (ii) Converter(Dimension 345*345*415mm), (iii) (C)A-1 Board(Dimension 345*177*200mm)
Service - Degutting and removal of Amplidyne Training(Dimension 2500*1900*830mm ) from AK 100 Equipment Room
Service - Degutting and removal of following equipment from AK 100 UTS (i) G(D)-2 Pump (Dimension 400*800*400mm), (ii) Hoist Pump (Dimension 400*800*500mm ) (iii) Hoist Motor(Dimension 2000mm Dia ) (iv) Feddway Branch Pipe(Dimension 3500mm long),
Service - Degutting and removal of following part of Feed Mechanism(Dimension 5552mm Dia) from AK 100 UTS (i) Hoist (ii) Feed motor (iii) Elevation chain (iv) Conveyer (v) Elevator Tube (vi) Feed rack
Service - Degutting and removal of following equipment from AK 100 Intermediate Section (i) Feedway Branch Pipr Cover(Dimension 3500mm Dia ), (ii) Amplifier Unit (Dimension 345*345*345mm),
Service - AK 100 ,T91E C/P – Degutting and removal of existing Dev 105(D)(Dimension 900*900*2000mm
Service- AK 100 GM – Degutting and removal of existing AK-100 GM(Dimension 7380mm Dia)
Services - Removal of in way electrical equipment like starter, junction boxescontrol panel and light fittings etc.
Services - Removal of in way equipment like ducting, air pipe tool rack, fire box, pre-wetting system etc.
Service - Removal of all cables of AK 100 handling room and D(Y) unit in T 91 E Control Post. Length - 2500 mtrs. All cables are to be removed from ship and are to be unshipped/ taken to Yard.
Material - Blanking of E 214 Hoist
Service - Blanking of E 214 Hoist
Material - A new foundation is required to be manufactured. Further a raised platform is required to be constructed to augment the height of the existing intermediate compartment of AK-100 Gun mount so as to house the SRGM Revolving Feed Mechanism and other sub-units. Fabrication of the following :- (i) Main Gun deck of elevated height as per the WLDS. (ii) Structural modification of Barbette and Handling room as per the WLDs. (iii) Loading platform made of anti skid grating as per WLDs.
Service - A new foundation is required to be manufactured. Further a raised platform is required to be constructed to augment the height of the existing intermediate compartment of AK-100 Gun mount so as to house the SRGM Revolving Feed Mechanism and other sub-units. Fabrication of the following :- (i) Main Gun deck of elevated height as per the WLDS. (ii) Structural modification of Barbette and Handling room as per the WLDs. (iii) Loading platform made of anti skid grating as per WLDs.
Material - Surface preparation, Machining and deck strengthening for fitment of base plate and foundation of SRGM. Modify the gun deck and deck. Prepare and install pre fabricated Barbette with Gun Rings as per tolerances and procedures enumerated as per the installation manual. Drilling of holes, aligning and installation of SRGM on the gun ring Installation of Gun seating base with machining of pedestal and tolerance for seating pedestal is +0.2mm. Holes of seating base are to be drilled at sight to suite the base of the gun.
Service - Surface preparation, Machining and deck strengthening for fitment of base plate and foundation of SRGM. Modify the gun deck and deck. Prepare and install pre fabricated Barbette with Gun Rings as per tolerances and procedures enumerated as per the installation manual. Drilling of holes, aligning and installation of SRGM on the gun ring Installation of Gun seating base with machining of pedestal and tolerance for seating pedestal is +0.2mm. Holes of seating base are to be drilled at sight to suite the base of the gun.
Material - Fabrication of platform and bracket for fitment of following:- (i) COTS Console (ii) Barrel Cooling Control Panel (iii) Local Stablization unit (iv) Convertor - 06 in nos. (v) Distribution boxes-08 in nos. (vi) System Control Unit (SCU) Material - Installation of the following in Equipment Room:- (i) EIJB-III, (ii) 01- External System Interface(ESI), (iii) LC, (iv) 03- Switch Fuse Unit(SFU), (v) HTR, ACOS (vi) 01-Convertor, (vii) 01-Starter
Service - Fabrication of platform and bracket for fitment of following:- (i) COTS Console (ii) Barrel Cooling Control Panel (iii) Local Stablization unit (iv) Convertor - 06 in nos. (v) Distribution boxes-08 in nos. (vi) System Control Unit (SCU) Service - Installation of the following in Equipment Room:- (viii) EIJB-III, (ix) 01- External System Interface(ESI), (x) LC, (xi) 03- Switch Fuse Unit(SFU), (xii) HTR, ACOS (xiii) 01-Convertor, (xiv) 01-Starter
Material - Preparation of non water tight compartment with minor bulkhead partition and a door in gun handling room for housing COT console panel.
Service - Preparation of non water tight compartment with minor bulkhead partition and a door in gun handling room for housing COT console panel.
Material - Piercing of Deck/ Bulkhead at 05 different places for passing of cables and there after gland packing after completion of cabling.
Service - Piercing of Deck/ Bulkhead at 05 different places for passing of cables and there after gland packing after completion of cabling.
Material - Manufacture and fitment of cable securing bands along existing/ new cable trays and cable gland sealings.
Service - Manufacture and fitment of cable securing bands along existing/ new cable trays and cable gland sealings.
Service - Laying of Cable of approximately 5000 mtrs. Cable Laying- System cables for data and power supply are to be laid and associated channel plates are to be manufactured and installed as per cable schedule provided in BP. Power Supply from Switchboard Power supply cable is to be laid down as per the layout provided in BP
Material - Modification of Sea and Fresh water line for SRGM cooling system from control unit panel installed in Gun bay. All flanges couplings etc will be in scope of supply of vendor.
Service - Modification of Sea and Fresh water line for SRGM cooling system from control unit panel installed in Gun bay.
Material - Fabrication and fitment of SRGM 76mm ammunition rack magazine which has capacity of 1222 shells.
Service - Fabrication and fitment of SRGM 76mm ammunition racking magazine 3 which has capacity of 1222 shells. SRGM Rack is a honey comb structure. Manufacturing is to be done as per WLDs.
Service - Installation of ALH as per WLDs
Material - Air trunking to be modified to provide AC in COT panel console compartment. The barbette of SRGM is proposed to be fitted in the existing Intermediate Compartment (IC) of AK-100. The existing air conditioning arrangement in intermediate compartment is not suitable. In order to augment the air conditioning in the IC extend the existing 03/05 AC trunkings in the UTC (just below IC) to the Intermediate Compartment (IC).
Service - Air trunking to be modified to provide AC in COT panel console compartment. The barbette of SRGM is proposed to be fitted in the existing Intermediate Compartment (IC) of AK-100. The existing air conditioning arrangement in intermediate compartment is not suitable. In order to augment the air conditioning in the IC extend the existing 03/05 AC trunkings in the UTC (just below IC) to the Intermediate Compartment (IC).
Material - Shifting Door of Equipment room as per WLDs.
Service -Shifting Door of Equipment room as per WLDs.
Service for -Removal of microtech tiling
Service for -Removal of lagging for fabrication job
Services :Manufacturing and fitment of cable tallies and device tallies Aluminium (punched) as per WLDs.
Material - Manufacturing and fitment of clamps for mounting of channel trays, ventilation trunking and bulkhead mount devices as required.
Service - Manufacturing and fitment of clamps for mounting of channel trays, ventilation trunking and bulkhead mount devices as required.
Service - Provisioning of all tool, slings, vehicles any other item required for undertaking above mentioned job.
Material – Manufacturing and machining of flanges of sprinkling system
Service – Manufacturing and machining of flanges of sprinkling system
Service – Manufacturing of locking mechanism for SRGM Magazine
Material – Manufacturing of locking mechanism for SRGM Magazine
Service – Drilling and Tapping of 04 holes in shell carrier for each lock
Service –Alignment and fitment of locking mechanism in SRGM Magazine
COXMAN MARINE SERVICES PVT LTD.
ULTRA MARINE
FLASH FORGE PRIVATE LIMITED
YEOMAN MARINE SERVICES PVT. LTD.
H and H Precision Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .