| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹2.8 L+₹50,844 (22.6%)Rejected-Finance | L2 | Rejected-Finance Being L2 |
Tender Value
Refer Docs
Closing Date
3 Aug 2021, 6:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW DIVISION RAJOURI
Culvert Near MS Tarkassi Pyt. Tarkassi Block Budhal Old Under B2V3
2021_RDPR_131518_94
e-NIT No. 33 REW RAJOURI OF 2021 Dated 23-07-2021
Open Tender
Civil Works
Item Rate
30 days
Block Budhal Old
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
CD-Account No. 0020010200000890
Exempted
16 Aug 2021
23 Jul 2021
4 Aug 2021
23 Jul 2021
3 Aug 2021
23 Jul 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 70% AKS and 30% OR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% Stone
Cement Concrete 80%
Stone 20%
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Hard drawn steel wire fabric
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Form Work of Ordinary timber planks
Edges of Slab, Abutment, Wing Wall
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 40% Stone
Cement Concrete 60%
Stone 40%
Consumption of Material
Carriage of Sand/ Bajree 13Km by MT and 1Km by HL/AT
Carriage of Stone 0.5Km by HL/AT
ANJUM SHAHEEN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .