| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 CrAccepted-AOC | ₹15.7 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹16.7 CrRejected-Finance | ₹16.7 Cr | L2 | Rejected-Finance Second Lowest not admitted |
| 3 | L3₹17.8 CrRejected-Finance | ₹17.8 Cr | L3 | Rejected-Finance Third lowest not admitted |
| 4 | L4₹18.3 CrRejected-Finance | ₹18.3 Cr | L4 | Rejected-Finance Fourth lowest not admitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Vide OrdernoHECE/238/2021/DR2 dated 02.11.21 |
Tender Value
₹18.9 Cr
EMD Value
₹5 L
Closing Date
6 Sept 2021, 6:00 pmClosed
Superintending Engineer,Harbour Engineering Depart
Office of the Superintending Engineer, Harbour Engineering North Circle, Puthiyanirath, Elathur. P .O., Kozhikode-673 303
Rebuild Kerala initiative (RKI) RIVER TRAINING WORKS AT SHIRIYA IN KASARAGOD DISTRICT
2021_HED_435430_1
PQ 03/HED/NC/2021-22
Open Tender
Civil Works - Others
360 days
SHIRIYA IN KASARAGOD DISTRICT
Please refer Tender documents.
11 documents required · 11 mandatory
₹15,000
Yes
₹5 L
Yes
28 Feb 2022
17 Aug 2021
9 Sept 2021
17 Aug 2021
6 Sept 2021
17 Aug 2021
Amount
Appendix A-Seaward Training wall
od1498/2021_2022 : Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place<br> and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. Kasaragode District
od1499/2021_2022 : Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br>Kasaragode District
od1500/2021_2022 : Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br><br>Kasargode District
od6674/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones 1T to 2 T category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour of rubble mount breakwater inclusive of cost of stones , hire of lorries and machineries , labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers , stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per the approved drawings with tolerence of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator,rehandling, placing and packing using mobile crane , inspecting the profile once in a week and cost of spalls/ quarrymuck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site. KASARAGOD DISTRICT<br>
od6675/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones 2T to 3T category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour of rubble mount breakwater inclusive of cost of stones , hire of lorries and machineries , labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers , stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per the approved drawings with tolerence of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator,rehandling, placing and packing using mobile crane , inspecting the profile once in a week and cost of spalls/ quarrymuck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site. KASARAGOD DISTRICT
od6650/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones 3T to 5 Tcategory stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour of rubble mount breakwater inclusive of cost of stones , hire of lorries and machineries , labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers , stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per the approved drawings with tolerence of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator,rehandling, placing and packing using mobile crane , inspecting the profile once in a week and cost of spalls/ quarrymuck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site. KASARAGOD DISTRICT
2 Appendix B- Construction of Approach Road
3.3 : Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
3 DAR Data
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4 Mord Data
od704/2021_2022 : Granular sub base/base/surface course with local materials (table 400.13) by mix in place method .Construction of granular sub base using quarry muck spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408.
3 Appendix C- River side potection works
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
3.6 : Excavation in Marshy Soil Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.6.
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
PKV INFRACTECH PVT LTD
C.L MOHAMMED HANEEF
T.M.CONSTRUCTIONS
Bidder Name
C.L MOHAMMED HANEEF
T.M.CONSTRUCTIONS
PKV INFRACTECH PVT LTD
pkmco constructions pvt ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid