| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC PALAKKAD KANJIKODE | PALAKKAD | KERALA | 672122 | ₹1.2 Cr | L1 | Accepted-AOC lowest |
| 2 | L2₹1.2 Cr+₹3.7 L (3.13%)Rejected-AOC KADUMKEERIYIL SHOPPING COMPLEX THAMARASSERY KOZHIKODE 673573 | KOZHIKODE | KOZHIKODE | KERALA | 673573 | ₹1.2 Cr+₹3.7 L (3.13%) | L2 | Rejected-AOC second lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical tender conditions not complied |
Tender Value
₹1.4 Cr
EMD Value
₹50,000
Closing Date
23 Feb 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Transmission Division,Palakkad, 678004
Construction of Control Room , Cable Trench , and Mac Road in the proposed site for the new unmanned 110/22 kV AI Substation at Wind Farm area , NIDA , Kanjikode
2026_KSEB_835093_1
EE/TDP/04/2025-26 dtd 09/02/2026
Open Tender
Civil Works - Buildings
Percentage
275 days
Kanjikode
Please refer tender condition
8 documents required · 8 mandatory
₹5,900
₹50,000
Transmission Division,Palakkad
8 Jul 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
23 Feb 2026
14 Feb 2026
13 Feb 2026 - 17 Feb 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-A Control Room | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil | 150 | m3 | 1 | ₹149.85 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil. Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m | 42 | m3 | 1 | ₹41.96 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 230 | m3 | - | - |
| 1.04 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. Ordinary rock | 25 | m3 | - | - |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift from 1.5 m to 3.0 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.. Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m | 140 | m3 | - | - |
| 1.06 | :Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift (1.50m to 3.00m), , including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | 34 | m3 | - | - |
| 1.07 | Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 35 | m3 | - | - |
| 1.08 | Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered): Depth exceeding 1.5 m but not exceeding 3 m | 100 | m2 | 1 | ₹99.9 |
| 1.09 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset having capacity of 4000Ltr/hr, etc complete | 50 | hr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
Tender.pdf
Tender Documents • 1.20 MB
BOQ_1405943.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .