Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance B 18 MOHALLA SHARDA NAGAR LAKHIMPUR KHERI | LAKHIMPUR KHERI | LAKHIMPUR KHERI | UTTAR PRADESH | L1 | Admitted-Finance | |
| 2 | L2₹2.3 Cr+₹6.6 L (2.97%)Admitted-Finance UTTAR PRADESH UP | L2 | Admitted-Finance | |
| 3 | L3₹2.4 Cr+₹12.3 L (5.51%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.5 Cr+₹27.4 L (12.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹2.5 Cr+₹28.0 L (12.5%)Admitted-Finance 01 MAUHRI MAURI KEDARPUR DHAMPUR BIJNOR BIJNOR UTTAR PRADESH 246761 | ALIGARH | UTTAR PRADESH | 246761 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Vishal Construction L7 | M/S RADHIKA CONSTRUCTION COMPANY L4 | M/S Singh Construction L5 | M/S SUSHIL KUMAR SINGH THEKEDAR L1 | M/s MAHAKAAL ASSOCIATES L3 | M/s Raja Ram Shukla Contractor L6 | M/S NIRMALA RAI CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, packing and laying 40-60 kg. stone boulder in mechanically woven galvanised steel wire with polymer coated wire crate of size (3.00x2.00x0.45)m in launching apron including cost of labour material, and T&P etc for proper completion of work. But excluding Cost of GST. | 1,746 | cum | 6,500 ₹1,13,49,000 | 6,800 ₹1,18,72,800 | 6,500 ₹1,13,49,000 | 5,700 ₹99,52,200 Lowest | 5,991.86 ₹1,04,61,787.56 | 7,100 ₹1,23,96,600 | 6,000 ₹1,04,76,000 |
| 2.00 | Supply & Laying 40-60 kg. stone boulder in mechanically woven galvanised steel wire with polymer coated wire crate of size (3.00x2.00x0.30)m on Slope and top Berm including all cost of labour material, and T&P etc. But excluding Cost of GST. | 994.86 | cum | 7,200 ₹71,62,992 | 6,800 ₹67,65,048 | 6,960 ₹69,24,225.6 | 5,800 ₹57,70,188 Lowest | 6,399.98 ₹63,67,084.1 | 7,101 ₹70,64,500.86 | 6,500 ₹64,66,590 |
| 3.00 | Supply & Laying Geo textile (sheet) made of 240 GSM woyen multifitament polypropylene yarn, on Slope and top Berm including preparation of surface, cost of all material, labour & T&P etc required for proper completion of work,. But excluding Cost of GST. | 3,316.18 | Sqm | 130 ₹4,31,103.4 | 104 ₹3,44,882.72 | 100 ₹3,31,618 | 90 ₹2,98,456.2 Lowest | 111.13 ₹3,68,527.08 | 112 ₹3,71,412.16 | 126 ₹4,17,838.68 |
| 4.00 | Supplying and Laying of 50mm thick local sand over the Geo textile (sheet) to avoid rupture of fabric by stone boulder to be laid, including cost of all material, labour & T&P etc required for proper completion of work. But excluding Cost of GST. | 165.81 | cum | 1,260 ₹2,08,920.6 | 500 ₹82,905 | 1,100 ₹1,82,391 | 900 ₹1,49,229 | 1,069.97 ₹1,77,411.73 | 514 ₹85,226.34 | 350 ₹58,033.5 Lowest |
| 5.00 | Supplying and laying new E.C. bags filled with R.B.M. tying & sewing with machine and placing in nylon crate for making platform for laying boulder in launching apron including cost of all materials, labour T&P etc. But excluding Cost of GST. | 31,625 | Nos | 32 ₹10,12,000 | 16 ₹5,06,000 Lowest | 25 ₹7,90,625 | 23 ₹7,27,375 | 28.27 ₹8,94,038.75 | 20 ₹6,32,500 | 35.6 ₹11,25,850 |
| 6.00 | Earth work in making slope including all lead and lift,manual compaction , dressing , labour, T&P etc. But excluding Cost of GST. | 4,713.17 | cum | 100 ₹4,71,317 | 50 ₹2,35,658.5 Lowest | 60 ₹2,82,790.2 | 69 ₹3,25,208.73 | 86.53 ₹4,07,830.6 | 51 ₹2,40,371.67 | 50 ₹2,35,658.5 Lowest |
| 7.00 | Supply, packing and laying 40-60 kg. loose stone boulder in launching apron including cost of labour material, and T&P etc for proper completion of work. But excluding Cost of GST. | 1,053 | cum | 5,400 ₹56,86,200 | 5,000 ₹52,65,000 | 5,000 ₹52,65,000 | 4,850 ₹51,07,050 | 4,637.4 ₹48,83,182.2 | 5,050 ₹53,17,650 | 4,000 ₹42,12,000 Lowest |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
6 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of Superintending Engineer Irrigation Construction Circle Bahraich
Boulder Pitching on Slope for Protection work of Tail of Silt Ejector Channel Situated on Left Bank of Ghaghra River in District Bahraich (Lot-08)
2026_UPIDC_1201572_8
11/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
Bahraich
Plz Refer Tender Document
2 documents required · 2 mandatory
₹2,354
₹5.6 L
Yes
23 Nov 2026
28 Oct 2026
6 Nov 2026
30 Oct 2026
6 Nov 2026
30 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, packing and laying 40-60 kg. stone boulder in mechanically woven galvanised steel wire with polymer coated wire crate of size (3.00x2.00x0.45)m in launching apron including cost of labour material, and T&P etc for proper completion of work. But excluding Cost of GST. | 1,746 | cum | - | - |
| 2 | Supply & Laying 40-60 kg. stone boulder in mechanically woven galvanised steel wire with polymer coated wire crate of size (3.00x2.00x0.30)m on Slope and top Berm including all cost of labour material, and T&P etc. But excluding Cost of GST. | 994.86 | cum | - | - |
| 3 | Supply & Laying Geo textile (sheet) made of 240 GSM woyen multifitament polypropylene yarn, on Slope and top Berm including preparation of surface, cost of all material, labour & T&P etc required for proper completion of work,. But excluding Cost of GST. | 3,316.18 | Sqm | - | - |
| 4 | Supplying and Laying of 50mm thick local sand over the Geo textile (sheet) to avoid rupture of fabric by stone boulder to be laid, including cost of all material, labour & T&P etc required for proper completion of work. But excluding Cost of GST. | 165.81 | cum | - | - |
| 5 | Supplying and laying new E.C. bags filled with R.B.M. tying & sewing with machine and placing in nylon crate for making platform for laying boulder in launching apron including cost of all materials, labour T&P etc. But excluding Cost of GST. | 31,625 | Nos | - | - |
| 6 | Earth work in making slope including all lead and lift,manual compaction , dressing , labour, T&P etc. But excluding Cost of GST. | 4,713.17 | cum | - | - |
| 7 | Supply, packing and laying 40-60 kg. loose stone boulder in launching apron including cost of labour material, and T&P etc for proper completion of work. But excluding Cost of GST. | 1,053 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BID_SiltEjector_Lot_8.pdf
Tender Documents • 2.03 MB
BOQ_2274023.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .