Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC | ₹21.1 L | L1 | Accepted-AOC AOC IS AWARDED DUE TO L1 |
| 2 | L2₹21.8 LRejected-Finance ANAND NAGAR DHANORA ROAD BEED TA JI BEED | BEED | BEED | MAHARASHTRA | 431122 | ₹21.8 L | L2 | Rejected-Finance REJECTED DUE TO L2 |
| 3 | L3₹23.9 LRejected-Finance | ₹23.9 L | L3 | Rejected-Finance REJECTED DUE TO L3 |
| 4 | L4₹24.2 LRejected-Finance | ₹24.2 L | L4 | Rejected-Finance REJECTED DUE TO L4 |
| Sl No | Description | Qty | Unit | MEHFOOZ HASAN CONTRACTIOR L3 | M/S SUBHASH CHAND CONTRACTOR L4 | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L1 | M/S RAJKAMAL CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Scraping old painted surface including disposal of all scrapped material by mechanical means including all cost of material, labour, T&P etc. as per directed by engineer in charge for proper completion of work. | 358.97 | SQM | 4.51 ₹1,618.95 | 4.6 ₹1,651.26 | 500 ₹1.8 L | 4.14 ₹1,486.14 |
| 2.00 | Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge. | 143.8 | Cum | 61 ₹8,771.80 | 65 ₹9,347 | 120 ₹17,256 | 58 ₹8,340.40 |
| 3.00 | Providing & Laying of C.C M-10 A20(1:3:6) with A-40 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 14.88 | Cum | 5,488 ₹81,661.44 | 5,489 ₹81,676.32 | 5,500 ₹81,840 | 4,940 ₹73,507.20 |
| 4.00 | Providing & Laying of C.C M-15 A20(1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 71.38 | Cum | 5,992 ₹4.3 L | 5,993 ₹4.3 L | 5,500 ₹3.9 L | 5,394 ₹3.9 L |
| 5.00 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 8.4 | Cum | 5,475 ₹45,990 | 5,479 ₹46,023.60 | 5,800 ₹48,720 | 4,931 ₹41,420.40 |
| 6.00 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 190.52 | SQM | 416 ₹79,256.32 | 417 ₹79,446.84 | 400 ₹76,208 | 375 ₹71,445 |
| 7.00 | Centering & Shuttering of line plywood or steel shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 103.31 | SQM | 681 ₹70,354.11 | 685 ₹70,767.35 | 450 ₹46,489.50 | 616 ₹63,638.96 |
| 8.00 | Providing & Laying of C.C M-25 A20 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 67.17 | Cum | 7,901 ₹5.3 L | 7,904 ₹5.3 L | 7,000 ₹4.7 L | 7,114 ₹4.8 L |
| 9.00 | P / Fixing 20mm expenssion joint with angle iron on both side and 6 mm thick steal plate over angle iron welded contineously including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 26.92 | Rmtr | 1,665 ₹44,821.80 | 1,668 ₹44,902.56 | 4,500 ₹1.2 L | 1,501 ₹40,406.92 |
| 10.00 | Providing & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 6.12 | Rmtr | 861 ₹5,269.32 | 865 ₹5,293.80 | 180 ₹1,101.60 | 778 ₹4,761.36 |
Tender Value
₹24.2 L
EMD Value
₹49,000
Closing Date
27 Oct 2025, 2:00 pmClosed
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
CONSTRUCTION OF DRB AT KM 5.570 OF DHANAURI MINOR UNDER MGC STAGE II IN DIST AMROHA.
2025_UPIDC_1082127_2
04/EE/2025-26
Open Tender
Civil Works - Others
120 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹49,000
16 Dec 2025
13 Oct 2025
27 Oct 2025
13 Oct 2025
27 Oct 2025
13 Oct 2025
Amount
Scraping old painted surface including disposal of all scrapped material by mechanical means including all cost of material, labour, T&P etc. as per directed by engineer in charge for proper completion of work.
Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge.
Providing & Laying of C.C M-10 A20(1:3:6) with A-40 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of C.C M-15 A20(1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work
Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Centering & Shuttering of line plywood or steel shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying of C.C M-25 A20 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
P / Fixing 20mm expenssion joint with angle iron on both side and 6 mm thick steal plate over angle iron welded contineously including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing Nomitox board in expension joints including cost of all labour and T&P etc. required for proper complition of work.
Steel reinforcement work in RCC up to 10 mm dia including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Steel reinforcement work in RCC above 10 mm dia including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of local sand in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing 110 mm dia PVC pipe for utility service including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing 75 mm dia PVC drainage spout pipe 600 mm long including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing sign caution board in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing year plate in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing B.M plate in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing wheel guard in position including cost of all mterial, labour and T&P for proper complition of work.
Earth work in filling in making canal section, approaches and diverson including all lead lift, compaction dressing as requied for proper completion of work including all cost of labour, material and T&P etc. as Directed By Engineer in Charge.
Supply & Laying of dry bricks with straigth overburnt Brick laid on edge i/c Joints filled with local earth including cost of all material, labour and T&P required for proper complition of work.
Supplying & laying of RBM on approaches and diverson including all lead lift, compaction, dressing as required for proper completion of work including all cost labour, material and T&P etc. completeor as Directed By Engineer in Charge.
M/S RAJKAMAL CONSTRUCTION COMPANY (BID ID -5625009)
MEHFOOZ HASAN CONTRACTIOR (BID ID -5631140)
M/S SUBHASH CHAND CONTRACTOR (BID ID -5631158)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.66 MB
BOQ_1981526.xls
BOQ • 0.23 MB
lot2.pdf
Tender Documents • 2.50 MB
Download all tender documents and submit your bid