Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹71.3 L+₹1.3 L (1.89%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L6 | |
| 4 | Rejected-Technical LAL BHAVAN CHANNAPETTA PO KOLLAM 691311 | KOLLAM | KERALA | 691311 | - | Rejected-Technical L7 | |
| 5 | Rejected-Technical | - | Rejected-Technical L9 |
| Sl No | Description | Qty | Unit | DAVID RAJ L5 | RAAI INFRATECH PRIVATE LIMITED L8 | SKC L3 | BLCCS LTD L9 | Sajith L4 | adilmohammed L1 | bencylal arajunan sathyabhama L7 | RAFEEK L2 | AJITH M S L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00A | ||||||||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 250 | sqm | 18 ₹4,500 | 20 ₹5,000 | 9 ₹2,250 | 9 ₹2,250 | 9 ₹2,250 | 7.97 ₹1,992.5 Lowest | 9 ₹2,250 | 10 ₹2,500 | 8.83 ₹2,207.5 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 164.74 | cum | 350 ₹57,657.25 | 285 ₹46,949.48 Lowest | 350 ₹57,657.25 | 349 ₹57,492.52 | 332 ₹54,692.02 | 309.36 ₹50,962.42 | 350 ₹57,657.25 | 330 ₹54,362.55 | 342.53 ₹56,426.68 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 37.17 | cum | 130 ₹4,832.1 | 109 ₹4,051.53 Lowest | 130 ₹4,832.1 | 127 ₹4,720.59 | 121 ₹4,497.57 | 112.68 ₹4,188.32 | 125 ₹4,646.25 | 130 ₹4,832.1 | 124.76 ₹4,637.33 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 25.89 | cum | 7,800 ₹2,01,942 | 6,401 ₹1,65,721.89 | 7,100 ₹1,83,819 | 7,721 ₹1,99,896.69 | 7,337 ₹1,89,954.93 | 6,822.29 ₹1,76,629.09 | 7,500 ₹1,94,175 | 725 ₹18,770.25 Lowest | 7,553.69 ₹1,95,565.03 |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 78.48 | cum | 720 ₹56,505.6 | 625 ₹49,050 Lowest | 700 ₹54,936 | 709 ₹55,642.32 | 675 ₹52,974 | 627.28 ₹49,228.93 | 700 ₹54,936 | 730 ₹57,290.4 | 694.52 ₹54,505.93 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 150 | cum | 310 ₹46,500 | 242 ₹36,300 Lowest | 300 ₹45,000 | 309 ₹46,350 | 295 ₹44,250 | 273.88 ₹41,082 | 300 ₹45,000 | 298 ₹44,700 | 303.25 ₹45,487.5 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.61 | cum | 8,300 ₹46,587.9 | 8,100 ₹45,465.3 | 8,000 ₹44,904 | 8,341 ₹46,818.03 | 7,926 ₹44,488.64 | 7,369.46 ₹41,364.78 Lowest | 8,500 ₹47,710.5 | 8,300 ₹46,587.9 | 8,159.53 ₹45,799.44 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.89 | cum | 9,100 ₹44,526.3 | 8,900 ₹43,547.7 | 8,500 ₹41,590.5 | 8,990 ₹43,988.07 | 8,543 ₹41,800.9 | 7,942.93 ₹38,864.76 Lowest | 9,200 ₹45,015.6 | 8,700 ₹42,569.1 | 8,794.49 ₹43,031.44 |
| 1.01 | OD110030/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work upto plinth level | 59.65 | cum | 10,500 ₹6,26,356.5 | 10,050 ₹5,99,512.65 | 9,500 ₹5,66,703.5 | 10,600 ₹6,32,321.8 | 10,072 ₹6,00,825.02 | 9,365.03 ₹5,58,652.13 Lowest | 10,000 ₹5,96,530 | 10,469 ₹6,24,507.26 | 10,369.04 ₹6,18,544.34 |
Tender Value
₹81.4 L
EMD Value
₹50,000
Closing Date
7 Oct 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division Kollam
GENERAL Construction of school building for S R V Government L P School Perumpuzha Kollam Construction Two Storied Building for S R V G P S Perumpuzha Kollam General Civil Work
2025_PWD_802034_1
PWD/BLDG/TR/411/2022
Open Tender
Civil Works - Buildings
Item Rate
540 days
perumpuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
30 Oct 2025
25 Sept 2025
9 Oct 2025
25 Sept 2025
7 Oct 2025
25 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1332426.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .