Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 LAccepted-AOC | 1 | Accepted-AOC AOC Work Order has been issued in favour of M/s. Upasana Enterprise | |
| 2 | 2₹7.8 L+₹85,982.75 (12.5%)Rejected-AOC | 2 | Rejected-AOC EMD may be released if paid Online. | |
| 3 | 3₹8.0 L+₹1.1 L (15.6%)Rejected-Finance 1260 GANGAPUR GROUND FLOOR MANDIRTALA DUTTAPUKUR NORTH 24 PARGANAS WEST BENGAL 743248 | 24 PARAGANAS NORTH | WEST BENGAL | 743248 | 3 | Rejected-Finance L3 Bidder | |
| 4 | 4₹8.3 L+₹1.4 L (20.9%)Rejected-Finance | 4 | Rejected-Finance L4 Bidder | |
| 5 | 5₹8.4 L+₹1.5 L (21.7%)Rejected-Finance | 5 | Rejected-Finance L5 Bidder |
Tender Value
₹9.3 L
EMD Value
₹18,651
Closing Date
17 Dec 2021, 6:55 pmClosed
MANAGING DIRECTOR
West Bengal Livestock Development Corporation Ltd. Bldg. No. 2, LB-2, Sector- III, Salt Lake City, Kolkata - 700106
, JatiyakaliSupply and Electrical Installation work of Training Centre at Broiler Breeding Farm, Fulbari, Jalpaiguri, PIN-734015
2021_ARD_354128_1
WBARD/WBLDC/NIT-327e/2021-22 Dated 02/12/2021
Open Tender
Miscellaneous Works
Percentage
45 days
Broiler Breeding Farm, Fulbari
Please refer NIT No. WBARD/WBLDC/NIT-327e/2021-22 Dated 02/12/2021 for further details.
7 documents required · 7 mandatory
₹0
₹18,651
Yes
H.Q., Salt Lake City, Kolkata - 700106.
9 Feb 2022
2 Dec 2021
20 Dec 2021
2 Dec 2021
17 Dec 2021
2 Dec 2021
2 Dec 2021 - 17 Dec 2021
9 Dec 2021
eProcurement System of Government of West Bengal Created By: Amar Kumar Paul Created Date/Time: 22-Dec-2021 04:54 PM Tender Title: Supply and Electrical Installation work of Training Centre at Broiler Breeding Farm, Jatiyakali, Fulbari, Jalpaiguri, PIN-734015 Tender ID: 2021_ARD_354128_1
Tender Inviting Authority : MANAGING DIRECTOR, WEST BENGAL LIVESTOCK DEVELOPMENT CORPORATION LIMITED
Name of Work : Supply & Electrical Installation work of Training Centre at Broiler Breeding Farm, Jatiyakali, Fulbari, Jalpaiguri, PIN-734015
NIT No : WBARD/WBLDC/NIT-327e/2021-22 Dated 02/12/2021
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M S B M K ENTERPRISE(GSTN-19AFFPK7028E1ZH) 932567.820 -16.790 775989.680 Seven Lakh Seventy Five Thousand Nine Hundred and Eighty Nine
2.00 m/s SHISHU KUMAR SARKAR(GSTN-19ARWPS5733K1ZQ) 932567.820 -9.990 839404.300 Eight Lakh Thirty Nine Thousand Four Hundred and Four
3.00 S D ENTERPRISE(GSTN-19ACLFS2035A1ZD) 932567.820 -14.440 797905.030 Seven Lakh Ninty Seven Thousand Nine Hundred and Five
4.00 RAHUL ELECTRICALS(GSTN-19AAEFR1306A1ZT) 932567.820 -10.510 834554.940 Eight Lakh Thirty Four Thousand Five Hundred and Fifty Four
5.00 G.G. ENTERPRISE(GSTN-19BUTPG0291B1ZM) 932567.820 -1.000 923242.140 Nine Lakh Twenty Three Thousand Two Hundred and Fourty Two
6.00 M S AMIT ELECTRICAL WORKS(GSTN-NA) 932567.820 -1.500 918579.300 Nine Lakh Eighteen Thousand Five Hundred and Seventy Nine
7.00 upasana enterprise(GSTN-NA) 932567.820 -26.010 690006.930 Six Lakh Ninty Thousand Six
Lowest Amount Quoted BY: upasana enterprise(690006.930)
BOQ Summary Details Tender Title: Supply and Electrical Installation work of Training Centre at Broiler Breeding Farm, Jatiyakali, Fulbari, Jalpaiguri, PIN-734015 Tender ID: 2021_ARD_354128_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 upasana enterprise 690006.930 L1
2 M S B M K ENTERPRISE 775989.680 L2
3 S D ENTERPRISE 797905.030 L3
4 RAHUL ELECTRICALS 834554.940 L4
5 m/s SHISHU KUMAR SARKAR 839404.300 L5
6 M S AMIT ELECTRICAL WORKS 918579.300 L6
7 G.G. ENTERPRISE 923242.140 L7
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .