Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.8 L+₹17,442.91 (6.70%)Rejected-Finance | ₹2.8 L+₹17,442.91 (6.70%) | L2 | Rejected-Finance High Quoted Rate |
| 3 | L3₹2.9 L+₹27,249.20 (10.5%)Rejected-Finance | ₹2.9 L+₹27,249.20 (10.5%) | L3 | Rejected-Finance High quoted rate |
| Sl No | Description | Qty | Unit | vino L3 | JOHNSON K T L1 | P. ALAVI L2 |
|---|---|---|---|---|---|---|
| 1.00Earth work excavation | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1,215.6 | cum | 217 ₹2,63,785.2 | 185 ₹2,24,886 Lowest | 197.35 ₹2,39,898.66 |
| 2.00Appendix B - Tree Cutting | ||||||
| 2.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 25 | each | 309 ₹7,725 | 270 ₹6,750 Lowest | 289.45 ₹7,236.25 |
| 2.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 25 | each | 320 ₹8,000 Lowest | 485 ₹12,125 | 518.05 ₹12,951.25 |
| 2.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 25 | each | 320 ₹8,000 Lowest | 660 ₹16,500 | 704.71 ₹17,617.75 |
Tender Value
₹3.4 L
EMD Value
₹8,458
Closing Date
30 May 2026, 4:00 pmClosed
Assistant Executive Engineer
O/o MINOR IRRIGATION SUB DIVISION MANANTHAVADY
GENERAL-Monsoon Preparedness 2026-Removal of silt and obstructions from Cherupuzha at downstream side of Palakuli check dam and cutting of branches of tree at Palakuli junction in Mananthavady Municipality
2026_Irrig_852390_1
IRR/IA/TR/2629/2026_5_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
Palakuli
Please refer Tender documents.
10 documents required · 10 mandatory
₹750
Yes
₹8,458
Yes
16 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
30 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 2Appendix B - Tree Cutting | |||||
| 2.001 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 2.002 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 2.003 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1440283.xls
BOQ • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .