| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.7 CrAdmitted-Finance | +16.86% | ₹14.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.9 CrAdmitted-Finance | +27.00% | ₹15.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹12.5 Cr
EMD Value
₹25.1 L
Closing Date
6 Aug 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
Civil Work
2026_UITKo_581155_1
NIT 13/2026-27 (1)
Open Tender
Civil Works
Percentage
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
7500 Secrectry KDA, 2500 MD RISL
₹25.1 L
Yes
19 Aug 2026
3 Aug 2026
7 Aug 2026
3 Aug 2026
6 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 by mechanical means | 2,031 | Cum | 100 | ₹2,03,100 |
| 2 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.Reinforced Cement Concrete | 123.3 | Cum | 478 | ₹58,937.4 |
| 3 | Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRTH Specification Clause 301.3.5 | 11,080.76 | Cum | 44 | ₹4,87,553.44 |
| 4 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305.:In hard soil-Depth upto 3 metre | 6,224 | Cum | 252 | ₹15,68,448 |
| 5 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300- 1 and 300-2 as per MoRTH Specification Clause 305.3 | 857.5 | Cum | 40 | ₹34,300 |
| 6 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 4,219.25 | Cum | 59 | ₹2,48,935.75 |
| 7 | Granular Sub-Base with Close Graded Material (Table:- 400-1)
Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means: For Grading-II Material | 1,687.7 | Cum | 859 | ₹14,49,734.3 |
| 8 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406:By Mechanical Means with all lead | 2,109.63 | Cum | 1,147 | ₹24,19,745.61 |
| 9 | Prime Coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 8,438.5 | Sqm | 31 | ₹2,61,593.5 |
| 10 | Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 8,438.5 | Sqm | 9.6 | ₹81,009.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Post_Qualification_1.pdf
Tender Documents • 31.63 MB
BOQ_1032687.xls
BOQ • 0.37 MB
Drawing.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].