Loading…
Loading…
Tender Value
₹79.4 L
EMD Value
₹1.6 L
Closing Date
6 Aug 2026, 5:00 pm
Superintending Engineer, Presidency Circle I, PRD
Joint Administrative Building, 6th Floor, HC- 7, Sector III, Salt Lake, Kolkata 700 106
L023 Media Bazar to Bheri Under-Bongaon Block ( Length 1.060 Km )
2026_WBSRD_148346_2
10/SRDA/N-1/2026-27/01
Open Tender
Civil Works - Roads
365 days
NORTH24PARGANAS
AS PER SBD AND NIT
6 documents required · 6 mandatory
₹5,000
₹1.6 L
KOLKATA
14 Jul 2026
14 Jul 2026
7 Aug 2026
14 Jul 2026
6 Aug 2026
14 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost for Construction of PAVEMENT WORKS | 1 | Nos. | 48,45,829.64 | ₹48,45,829.64 |
| 2 | Cost for Construction of ROAD SAFETY WORKS | 1 | Nos. | 4,14,609.32 | ₹4,14,609.32 |
| 3 | Cost for Construction of ROAD FURNITURE WORKS | 1 | Nos. | 71,028.22 | ₹71,028.22 |
| 4 | Cost for Construction of CROSS DRAINAGE WORKS | 1 | Nos. | 83,836.33 | ₹83,836.33 |
| 5 | Cost for Construction of DRAINAGE | 1 | Nos. | 1,44,246.63 | ₹1,44,246.63 |
| 6 | Cost for Construction of PROTECTIVE WORKS | 1 | Nos. | 5,25,699.4 | ₹5,25,699.4 |
| 7 | Add @ 18% GST on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 8 | Add @ 1% Labour Welfare CESS on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 9 | 1st Year Routine Maintenance | 1 | Nos. | 20,949.02 | ₹20,949.02 |
| 10 | 2nd Year Routine Maintenance | 1 | Nos. | 65,755.16 | ₹65,755.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 1.47 MB
Tendernotice_3.pdf
PDF • 0.31 MB
CHECKLIST.xls
Tender Documents • 0.05 MB
SOQWB01527.pdf
Tender Documents • 6.21 MB
BOQ_233645.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid