| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.9 CrAdmitted-Finance | ₹3.9 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.P.ENTERPRISE L2 | PACIFIC ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.00 | Detail survey of construction site along with the design,drawing and detailing of the following:
i) G.A Drawing
ii) Detail Design & Drawing of sheet piles
iii)Detail Design & Drawing of Embankment
iv) Vetting of final design & drawing from IIEST/JU/IIT/NIT
(All drawing should be submitted both in hard and soft copies along with PDF & Auto Cad files) | 1 | LS | 25,00,000 ₹25 L | 5,00,000 ₹5 L |
| 2.00 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within GRSE premises | 43 | Cum | 4,500 ₹1.9 L | 3,000 ₹1.3 L |
| 3.00 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within GRSE premises including stacking of steel bars | 5 | Cum | 6,500 ₹32,500 | 2,200 ₹11,000 |
| 4.00 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within GRSE premises | 10 | Cum | 4,500 ₹45,000 | 2,500 ₹25,000 |
| 5.00 | Labour for lowering and stacking after dismantling in parts R.S. joists, channels, angles, tees, plates etc.complete as directed. | 50 | Qntl | 50,000 ₹25 L | 2,500 ₹1.3 L |
| 6.00 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal/Corporation Rules for such disposal, loading into truck and cleaning the site in all respect | 100 | Cum | 1,500 ₹1.5 L | 1,250 ₹1.3 L |
| 7.00 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within GRSE premises | 250 | Sqm | 1,500 ₹3.8 L | 25 ₹6,250 |
| 8.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil including removing, spreading or stacking the spoils within GRSE Premises | 350 | Cum | 2,200 ₹7.7 L | 300 ₹1.1 L |
| 9.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming Compacting upto 96 % compaction etc. layer by layer complete,With earth obtained from excavation of foundation | 200 | Cum | 4,500 ₹9 L | 220 ₹44,000 |
| 10.00 | Levelling and Compacting original ground (Sub Grade) by power tandem vibratory roller of capacity min. 80Kn to 100 Kn including filling in depression occour during rolling to obtain the desired dry density | 50 | Cum | 4,500 ₹2.3 L | 500 ₹25,000 |
Tender Value
Refer Docs
EMD Value
₹6 L
Closing Date
13 Nov 2025, 12:00 pmClosed
Mr. Krishnakanta Chatterjee, Sr. Manager(Contract)
Mr. Krishnakanta Chatterjee, Sr. Manager(Contract)
PERMANENT PROTECTION WORK OF EASTERN SIDE EMBANKMENT OF SLIPWAY-2 and DD-3 AT RBD UNIT
2025_GRSE_98316_1
SCC/KKC/OT(Web)/HARDSTAND SLIPWAY-2 DD-3/158/ET-3307
Open Tender
Miscellaneous Services
90 days
As per tender document
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
GARDEN REACH SHIPBUILDERS and ENGINEERS LIMITED
₹6 L
Yes
GRSE Main Unit, YM Department
19 Dec 2025
16 Oct 2025
14 Nov 2025
16 Oct 2025
13 Nov 2025
28 Oct 2025
27 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.79 MB
GRSEInstructionsToBidderForOnlineBidSubmission.pdf
Additional Documents • 0.22 MB
MATRIXs3307.xls
Tender Documents • 0.55 MB
SOTR17A.pdf
Tender Documents • 0.45 MB
BOQ_107880.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid