Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC 38 GURUPADA HALDER ROAD KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | L1 | Accepted-AOC Lowest Bidder ART DECORATORS | |
| 2 | L2₹8.2 L+₹3,333 (0.41%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹8.2 L+₹8,211 (1.01%)Rejected-Finance 91 A 1 B L SAHA ROAD KOLKATA 700053 | KOLKATA | KOLKATA | WEST BENGAL | 700053 | L3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | Rejected-Technical 70 1A CHANDI GHOSH ROAD KOLKATA 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹8.1 L
EMD Value
₹16,260
Closing Date
30 Jun 2026, 3:00 pmClosed
Executive Engineer Barasat Highway Division-I
Office of The Executive Engineer Barasat Highway Division-I, P.W. (Roads) Dte. Purta Bhavan, 3rd Floor, Room No. 305, 306, 307, 308, 309 Salt Lake, Kolkata-700091
Protecting unsafe structure (20.0m height) at different places on K.N.I. AVENUE under Baguihati Highway Sub-Divn. of Barasat Highway Division I in the district of North 24 Parganas.
2026_WBPWD_5015650_1
WBPWRD/EE/BHDI/eNIT05/26-27/01
Open Tender
CIVIL WORKS
Percentage
BAGUIHATI
Please refer Tender documents.
5 documents required · 5 mandatory
₹16,260
31 Aug 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
30 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strong bamboo posts,posts plates,rafters, ties etc. fitted and fixed complete with coir rope or nails as directed. (Embedded portion of posts shall also be paid for against this item cost of digging hole and repacking being paid for seperately) :
(b) 100 mm. dia bamboo | 308 | mt. | 66 | ₹20,328 |
| 2 | Fixing of bamboo posts by digging hole in all sorts of soil and subsequent thorough repacking the same with spoils including the cost of one coat of coal-tarring the embedded portion of the bamboo :
(c) Depth 750 mm. | 64 | each | 26 | ₹1,664 |
| 3 | Hire and labour charges for 100mm dia bamboo railing on 150mm dia Jhau/Eucalyptus or other approved timber posts each 2.0m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8m over pacca road without damaging the surface and tying strongly 3(three) rows of bamboo railing on each leg and 1(one) railing connecting all the top junctions including costof loading unloading, stacking & carriage of all materials and labour complete, clearing the siteas per direction of Engineer in charge after removing the barricade. | 219 | mt. | 185 | ₹40,515 |
| 4 | Strong bamboo frame work (for thatched roofing) with 75mm. dia full bamboo rafters spaced at 350mm.centre sand tied with transverse bracings at 380mm. spacing(each bracing consisting of a pairof quarter bamboo,one at top and the other at the bottom of the rafters) fitted and fixed in position complete. | 732.77 | sqm | 240 | ₹1,75,864.8 |
| 5 | Renewing with part old and part new materials bamboo frame works (of thatched roof ) consisting of 75mm.dia, full bamboo rafters spaced at 350 mm. centres and tiedwith tranverse bracing at 380mm. spacing (each bracing consisting of pairof quarter bamboo,one at top and the other at bottom of the rafters) fitted and fixed in position.
(a) With half old and half new materials | 1,099.16 | sqm | 171 | ₹1,87,956.36 |
| 6 | Hire and labour charges for coloured and twisted cloth rope fencing as per design approved byEngineer-in-chargeone line with100mm dia Eucalyptus or bamboo posts 0.60m above G.Land 300mm below G.L1.50m apart fittedand fixed complete in cluding painting with white zinc painting (2 coat) complete.Payment of Painting to be made separately. | 804 | mt. | 20 | ₹16,080 |
| 7 | Fitting and fixing old pieces of asbestos,G.C.I.or C.I.sheets or plain sheets including closing old holes with washer sand sheet-boltsandnuts, etc. and including fixing the same to supporting frame with necessary hook-bolts,washers, putty etc. (excludingcostofsheets). (Payment to be made on area of finished work.)
(ii) With all new fittings including the cost thereof.
(b) In wall | 547.5 | sqm | 87 | ₹47,632.5 |
| 8 | Hire and labour charges for staging with sal bullah for super structure of bridge (Major and Minor) including stripping off and removing clearing on ompletion of work as per design and drawing approved by the Engineer-in-charge. | 525.6 | cum | 156 | ₹81,993.6 |
| 9 | Extra for Staging beyond 4 m [mode of measurement: Area of unsupported horizontal projection (where staging be yond 4m is practically unavoidable) x mean height of staging] above initial 4 m. | 706 | cum | 156 | ₹1,10,136 |
| 10 | SUB TOTAL | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
WBF.pdf
Tender Documents • 1.16 MB
OID.pdf
Additional Documents • 0.17 MB
BOQ_5084561.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .