| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | ₹12.5 L | L1 | Accepted-AOC LowestBidderAccepted |
| 2 | L2₹14.5 L+₹1.9 L (15.5%)Rejected-Finance | ₹14.5 L+₹1.9 L (15.5%) | L2 | Rejected-Finance SecondLowestBidder |
Tender Value
₹14.6 L
EMD Value
₹29,177
Closing Date
12 Dec 2023, 4:00 pmClosed
Executive Engineer VIII
VIII,WRD Karaswada Bardez
Fifth Revised Estimate of the Interstate Tillari Irrigation ProjectCanal Network in Goa Providing and fixing Barbed wire fencing from ch.13.400 km to 15.200 km in Acquired Area of LBMC of TIP at Village Assonora in Bardez Taluka
2023_WRD_12668_1
WRD/WDVIII /Accts/F. 6-11 /2023-24/TN-26(1)
Open Tender
Civil Works - Canal
Item Rate
120 days
Assonora
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹29,177
21 Feb 2024
30 Nov 2023
14 Dec 2023
1 Dec 2023
12 Dec 2023
1 Dec 2023
Amount
Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).
Earth work excavation in foundation and trenches or darins inall types of strata comprising any of the materials such as soil, silt, sand & clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rockordinary rock or disintegrated rock, fissured, shattered, decomposed rock or whethered rock,hard rock and all the such other materials as described in detailed specifications either in full or in parts as the case may be, adopting any approved method or methods as may be convenient or permitted including chiseling, wedging (blasting prohibited) dressing to the required shape etc. in all conditions such as dry, moist, saturated, submerged and foul conditions etc. and as directed by the Engineer in-charge with all lead and all lifts complete as specified and directed.
Centering and shuttering including struttings, propping etc. and removal of formwork for :a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a) All works upto plinth level
Supplying at site 2.00 m long RCC standard struts
1.5 mtr. height fencing with 2.00 mtr. R.C.C. posts of standard 30 design placed at 3 mtr. apart embedded in cement concrete blocks, corner, end with 6 horizontal lines & every 10 th post to be strutted with 9 horizontal lines & two diagonals of barbed wire 9.33 kg/100 mtr. minimum between two posts, fitted and fixed with G.I. stapples on wooden plug tied to 6mm bar nib with binding wire (cost of posts, struts, earthwork and concrete to be paid separately)
CBK Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .