| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | ₹3.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.5 L+₹75,950 (20.2%)Rejected-Finance HIMACHAL PRADESH HP | ₹4.5 L+₹75,950 (20.2%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VIKAS KUMAR L2 | Amrit Pal Singh L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in drains, channels, etc., in earthwork, including dressing of sides and bed, and disposing of excavated earth up to a lead of 20 meters. The excavated earth is to be leveled and neatly dressed, complete in all respects, within all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge." | 43 | Cum | 450 ₹19,350 | 350 ₹15,050 Lowest |
| 2.00 | Providing and laying cement concrete in the ratio 1:4:8 (1 part cement, 4 parts sand, 8 parts graded stone aggregate of 40 mm nominal size) and curing, complete excluding the cost of formwork in foundation and plinth, including carriage of material, complete in all respects within all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge. | 10 | Cum | 7,000 ₹70,000 | 6,000 ₹60,000 Lowest |
| 3.00Providing and laying cement concrete work in the ratio 1:2:4 (1 part cement, 2 parts sand, 4 parts graded stone aggregate of 20 mm nominal size) and curing, complete excluding the cost of formwork and reinforcement for reinforced concrete work:- | |||||
| 3.10 | In foundations, footings, bases of columns, and the like, and mass concrete, complete in all respects, as per the directions and to the entire satisfaction of the Engineer-in-charge, within all leads and lifts | 12.75 | Cum | 9,000 ₹1,14,750 | 7,500 ₹95,625 Lowest |
| 3.20 | In walls (any thickness but not less than 0.10 meter thickness), including attached pilasters, buttresses, plinth and string courses, etc., from the top of the foundation up to the floor level, complete in all respects, as per the directions and to the entire satisfaction of the Engineer-in-charge, within all leads and lifts." | 13.5 | Cum | 8,500 ₹1,14,750 | 7,600 ₹1,02,600 Lowest |
| 4.00 | Providing formwork with steel plates 3.15 mm thick, welded with angle iron frames of 30 x 30 x 5 mm, so as to give a fair finish, including centering, shuttering, strutting, and propping, etc., with wooden battens and ballies. The height of propping and centering below the supporting floor to ceiling should not exceed 4 meters, and removal of the same for in-situ reinforced concrete and plain concrete in vertical surfaces, such as walls (any thickness), partitions, and the like, including attached pilasters, buttresses, plinth, and string courses, complete, including all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge | 120 | sqm | 350 ₹42,000 | 250 ₹30,000 Lowest |
| 4.10 | Providing and laying of mild steel/tor steel reinforcement for RCC work, including bending, binding, and placing in position, complete up to the floor level (tor steel), complete in all respects, within all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge. | 918.75 | Kg | 100 ₹91,875 | 80 ₹73,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,990
Closing Date
5 Mar 2026, 11:00 amClosed
EE
JSD DHARAMSHALA
Construction of RCC Lining of kuhl
2026_HPIPH_129393_1
NO. EE-JSD-EA-I-2026-16942-17041
Open Tender
Civil Works
Item Rate
120 days
DSALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹7,990
3 Jun 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
5 Mar 2026
26 Feb 2026
23 Feb 2026 - 26 Feb 2026
Excavation in drains, channels, etc., in earthwork, including dressing of sides and bed, and disposing of excavated earth up to a lead of 20 meters. The excavated earth is to be leveled and neatly dressed, complete in all respects, within all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge."
Providing and laying cement concrete in the ratio 1:4:8 (1 part cement, 4 parts sand, 8 parts graded stone aggregate of 40 mm nominal size) and curing, complete excluding the cost of formwork in foundation and plinth, including carriage of material, complete in all respects within all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge.
Providing and laying cement concrete work in the ratio 1:2:4 (1 part cement, 2 parts sand, 4 parts graded stone aggregate of 20 mm nominal size) and curing, complete excluding the cost of formwork and reinforcement for reinforced concrete work:-
In foundations, footings, bases of columns, and the like, and mass concrete, complete in all respects, as per the directions and to the entire satisfaction of the Engineer-in-charge, within all leads and lifts
In walls (any thickness but not less than 0.10 meter thickness), including attached pilasters, buttresses, plinth and string courses, etc., from the top of the foundation up to the floor level, complete in all respects, as per the directions and to the entire satisfaction of the Engineer-in-charge, within all leads and lifts."
Providing formwork with steel plates 3.15 mm thick, welded with angle iron frames of 30 x 30 x 5 mm, so as to give a fair finish, including centering, shuttering, strutting, and propping, etc., with wooden battens and ballies. The height of propping and centering below the supporting floor to ceiling should not exceed 4 meters, and removal of the same for in-situ reinforced concrete and plain concrete in vertical surfaces, such as walls (any thickness), partitions, and the like, including attached pilasters, buttresses, plinth, and string courses, complete, including all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge
Providing and laying of mild steel/tor steel reinforcement for RCC work, including bending, binding, and placing in position, complete up to the floor level (tor steel), complete in all respects, within all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_191293.xls
BOQ • 0.27 MB
form68.pdf
Tender Documents • 0.88 MB
terms.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .