Loading…
Loading…
Tender ID
Tender Value
₹51.4 L
EMD Value
₹52,000
Closing Date
11 Mar 2026, 6:00 pmClosed
Executive Engineer, Und Irrigation Division, Jamnagar
BIG CHECKDAM Construction of Zinavari Checkdam on Vartu river near village : Zinavari, Taluka : Jamjodhpur, Dist. : Jamnagar.
280088
16 of 2025-26
Open
Civil - All
Works
Jamnagar
4 documents required · 3 mandatory · 1 optional
₹2,400
Yes
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹52,000
Yes
24 Feb 2026
24 Feb 2026
24 Feb 2026
11 Mar 2026
24 Feb 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : BIG CHECKDAM
Construction of Zinavari Checkdam on Vartu river near village :
Zinavari, Taluka : Jamjodhpur, Dist. : Jamnagar.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Dismentaling C.C. foundation or flooring 180.00 Cum. 828.00
sorting & taking useful and unuseful
material in lead up to 200 mt. as directed
etc. completed.
2(a) Excavation in all sort of strata and 1618.95 Cum. 79.00
formations incl. depositing the unuseful
excavated stuff as and where directed
incl. sorting and stacking useful materials
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering.
(A) IN OVER BURDEN HARD MURRUM.
2(b) (B) IN SOFT ROCK 492.38 Cum. 176.00
3 Providing, cutting, bending, binding and 10.1066 M.T. 76574.00
fixing in position as per drawing TMT
BAR, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
16 to 18 BWG M.S.. Wire etc. complete
with all lead and lift. (B) Fe-500
4 Prov. & Laying in position cement concrete 1090.00 Cum. 3423.00
using cement , sand and crushed metal
coarse aggregate by mass and machine mix
for PCC/RCC including necessary
formworks compaction by vibrator, curing
as directed with all lead & lift etc
complete.(Excluding cost of steel) FOR
.BODY WALL, APRON, TRAINING WALL,
SIDE WALL, SPLAY WALL, KEY WALL, CUT
4/C) Controlled Concrete Grade M-15 &
5 Providing & fixing in position 100/110 10.40 Rmt. 358.00
mm dia PVC Pipe weep holes in the
retaining walls / side wall / abt. etc.
6 Providing and laying STONE LOANCHING 25.00 Cum. 765.00
APRON by using 50% stone which having
weighing not less than 40 Kg. or as
specified incl. hand packing and filling
the interstices by spouls etc. complete
with all lead and lift.
7 Providing and laying 15cm thick STONE 63.60 Sqmt. 166.00
SOLING below apron using stone
weighing not less than 20 Kg. or as
specified as per design and drawing incl.
hand packing etc. complete with all lead
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
8 Earthwork / Back filling with selected 600.00 Cum. 141.00
earth brought from out side borrow area
or from excavated useful material
including watering ramming, compaction
with pneumatic temping and all lead and
lift etc. complete.
9 Providing & laying graded filters of sand, 23.24 Sq.m. 530.00
gravel / metal and over size metal (100
to 150 mm) behind the retaining wall &
wing walls as directed as per approved
drawing with all lead and lifts etc.
10 Providing and laying dry rubble pitching 191.06 Sqmt. 723.00
with 20 cms gravel / metal and 20 cms
and layers as base of inverted graded
filter and without header stone but incl.
hand packing trimming & dressing of
slopes etc. complete.
(b) 45 cms thick stone pitching.
11 Providing and fixing in position white 1.00 No. 1350.00
plate of size 45 x 45 x 1.8 cms including
engraving. The letters as per drawing /
directed etc. complete.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 51,38,378=10 Estimated Amount Rs. 51,38,378=10
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice No.16 of 2025-26.pdf
1.pdf
1-price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .