Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC R O VILLAGE AND PO DIYAR TEHSIL BHUNTAR DISTT KULLU H P | L1 | Accepted-AOC L1 | |
| 2 | Not Admitted-Finance HIMACHAL PRADESH HP | UNA | HIMACHAL PRADESH | 177202 | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Finance GOVT CONT V P O LEDA TEHSIL BALH DISTT MANDI | MANDI | HIMACHAL PRADESH | 175001 | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Nikhil Sharma L1 |
|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work. | 30.45 | Cum | 450 ₹13,702.5 Lowest |
| 2.00 | Providing and laying cement concrete 1:6:12 (1cement :6 sand :12 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth.as per direction and to the entire satisfaction of Engineer in charge | 4.2 | Cum | 7,000 ₹29,400 Lowest |
| 3.00 | Random rubble masonary Polygonal rubble masonary (un-coursed brought to courses) with hard stone in foundation and plinth of approved quality i/c levelling up at P.L. with cement conc. 1:6:12 in cement mortar 1:6 (1cement,6 sand) in foundation and plinth.) with in all leads and lifts complete in all respect. | 99.56 | Cum | 7,500 ₹7,46,700 Lowest |
| 4.00 | Stone / Boulder filling behind breast wall also under floor etc all complete with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 20.25 | Cum | 2,500 ₹50,625 Lowest |
Tender Value
₹8.0 L
EMD Value
₹15,993
Closing Date
15 Sept 2025, 11:00 amClosed
EE Jal Shakti Division Larji
EE Jal Shakti Division Larji
(SH- C/o retaining wall with Random Rubble Masonary back side of pump house at Chutti Bihali)
2025_HPIPH_114128_5
NIT No.6683-6782 dt. 06/09/2025
Open Tender
Civil Works
Item Rate
60 days
Bajaura
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE Jal Shakti Division Larji
₹15,993
7 Oct 2025
6 Sept 2025
15 Sept 2025
6 Sept 2025
15 Sept 2025
6 Sept 2025
Amount
Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work.
Providing and laying cement concrete 1:6:12 (1cement :6 sand :12 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth.as per direction and to the entire satisfaction of Engineer in charge
Random rubble masonary Polygonal rubble masonary (un-coursed brought to courses) with hard stone in foundation and plinth of approved quality i/c levelling up at P.L. with cement conc. 1:6:12 in cement mortar 1:6 (1cement,6 sand) in foundation and plinth.) with in all leads and lifts complete in all respect.
Stone / Boulder filling behind breast wall also under floor etc all complete with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .