Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BPTSENSS LTD L1 |
|---|---|---|---|---|
| 10.00DSR Items | ||||
| 10.00 | DSR-2018 Item:2.8.1 | 0.38 | M3 | 209 ₹93.22 Lowest |
| 10.00 | 2.25(a) Excavating, supplying and fillin | 39.94 | M3 | 268 ₹12,630.63 Lowest |
| 10.00 | 4.1.2/Providing and laying in position c | 0.83 | M3 | 5,984 ₹5,874.85 Lowest |
| 10.00 | 4.1.8/Providing and laying in position c | 6.27 | M3 | 4,805 ₹35,561.61 Lowest |
| 10.00 | 5.9.1/Centering and shuttering including | 11 | M2 | 236 ₹3,062.72 Lowest |
| 10.00 | 5.22.6/Reinforcement for R.C.C. work inc | 29.48 | KG | 69 ₹2,400.59 Lowest |
| 10.00 | 6.34.1/Brick work with non modular fly a | 6.69 | M3 | 6,202 ₹48,989.1 Lowest |
| 10.00 | 10.16.2/Steel work in built up tubular ( | 1,220.07 | KG | 130.7 ₹1,88,166.98 Lowest |
| 10.00 | 12.50/Providing and fixing precoated gal | 37.44 | M2 | 520.8 ₹23,009.14 Lowest |
Tender Value
Refer Docs
Closing Date
8 Aug 2026, 11:00 amClosed
AGM (CnM)
Patratu Vidyut Utpadan Nigam PATRATU UTILITY BUILDING, PO JHARKHAND 829119
Construction and development of Shamshan Ghat for Balkudra MahlitolaVillagers
2026_PVUNL_110559_1
PVUNL/Patratu/9900330436
Single
Miscellaneous Works
Works
60 days
Patratu Vidyut Utpadan Nigam PATRATU UTILITY BUILD
1 document required · 1 mandatory
₹0
Exempted
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
31 Jul 2026 - 1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 10DSR Items | |||||
| 10.0001 | DSR-2018 Item:2.8.1 | - | M3 | - | - |
| 10.0002 | 2.25(a) Excavating, supplying and fillin | 1 | M3 | - | - |
| 10.0003 | 4.1.2/Providing and laying in position c | 1 | M3 | - | - |
| 10.0004 | 4.1.8/Providing and laying in position c | - | M3 | - | - |
| 10.0005 | 5.9.1/Centering and shuttering including | 1 | M2 | - | - |
| 10.0006 | 5.22.6/Reinforcement for R.C.C. work inc | - | KG | - | - |
| 10.0007 | 6.34.1/Brick work with non modular fly a | 1 | M3 | - | - |
| 10.0008 | 10.16.2/Steel work in built up tubular ( | 0.2 | KG | - | - |
| 10.0009 | 12.50/Providing and fixing precoated gal | - | M2 | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tender Docs-9900330436.pdf
Tender Documents • 2.47 MB
4.1 Safety Rule.pdf
Tender Documents • 2.84 MB
5.1 Annexure to SCC Debar Policy.pdf
Tender Documents • 4.64 MB
Sec VI-SOW and STC.pdf
Tender Documents • 2.10 MB
BOQ_113788.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .