Loading…
Loading…
Tender ID
Tender Value
₹10.0 L
EMD Value
₹9,996
Closing Date
2 Mar 2026, 6:00 pmClosed
DY.CITY ENGINEER (SOUTH ZONE)
New Construction / Reparing of drainage line, machine hole, chamber at samarat nagar, chandra prabha society, aalok bunglow, rajesheri society area and diff. area of isanpur ward
278651
tender notice no 18/2025-26 tn no : 859
Open
Civil Works - Others
Works
Ahmedabad
5 documents required · 5 mandatory
₹900
Yes
municipal commissioner
₹9,996
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
5 Estimated Cost put to tender Rs.9,99,645.87
6 Earnest Money Deposit Rs.9,996/- (Demand Draft or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad /) To be submitted as
prescribed in 9.0 below. Demand Draft or Bank Guarantee shall
be from Nationalized Bank / Sheduled Bank and valid for
days.(As per AMC finance dept.circular No-5 Dt.5/5/07 & F.D.
Circular No. 29 Dt.7/08/2010) & attched ANNEXURE - 1 finance
dept.circular No-22 Dt.11/8/11& circular No-8 Dt.04/05/12
circular No-03 Dt.13-05-14 & Finance circular No-56 Dt.19-09-16
& Circular No.18 Dt:23/5/2017 & Circular No.18 Dt:29/5/2018 &
Circular No.12 Dt:22/7/2019 & Circular No.26 Dt:25/11/2019 &
Circular No.21 Dt:19/6/2020. & Circular No.40 Dt:6/11/2020.
7 Security Deposit 5 % Of the Tender amount in Form Bank Guarantee / Demand
8 Tender fees Rs.900.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along
Tender Fees with Tender as described in the invitation of tender and
submitted to Assistant Manager(South zone) , South zone office,
Rambaug, Maninagar Ahmedabad
Online submission shall be on Dt. 02/03/2026 up to 18.00 hours
Tenders issue date
10 only. The tenders received after this date and time will not be
entertained under any circumstances.
Last date of receiving Physical tender documents with EMD and Tender fee without
11 Tenders. price bid can be submitted up to Dt. 03/03/2026 up to
Dt. 03/03/2026 up to 17.00 hours. at Asst. Manager, Admin
Date of Opening Department, Shymaprasad Mukherji bhawan, Near Maninagar
Fire Brigade, Maninagar, Ahmedabad Municipal Corporation,
Price bid e-form as well as Price bid should be submitted online
only and unloaded to n-procure web site mentioned on NIT and
only Technical bid should be submitted physically in sealed
Mode of sending the Tender
13 envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Duplicate ( One Original & One Duplicate) duly sign &
seal by contractor as per schedule given on NIT.Tenders received
without EMD and without uploading price bid to n procure web
site shall be considered as Non-Responsive and shall be rejected
All general condition of contract of Form B1 condition of contract
14 Terms, Condition, &
shall be applicable and latest AMC circulars and policy should be
Defect & Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be
noticed before the period mentioned hereunder from the
certified date of completion, The within 15 days of receipt of the
notice. In the case of failure on the part of the contractor, the
Engineer-in-charge may rectify or remove or re-execute the work
at the risk & cost of the contractor. The Engineer-in-charge shall
be entitled to appropriate the whole or any part of the amount of
security deposit towards the expenses, if any, Incurred by him in
rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount
put to tender), the period shall be 3 months from the certified
date of completion. (b) for all works costing more than Rs.
and upto Rs. 1 crore (amount put tender), the period shall be
months from the certified date of completion or one monsoon,
whichever is later. (c) for major projects costing more than Rs.
crore, the period shall be 12 months from the certified date of
completion which should include one monsoon. (d) For building
works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon
period, the 30th September may be treated as the last date.
16 Liquidity Damages 0.1% per day delay of remaining work after the completion date
but not more than 10% of cost of remaining works.
17 E.P.F Act ykkdu As per Account department circular no-37 Dt.09/08/2018
18 GST ykkdu Rates Quoted by the contractor to be inclusive of all applicable
taxes (Excluding GST). Prevailing GST will be paid extra.
Contractor shall deploy labours and materials at immediate basis
in case of any emergency work when conveyed by the staff via
19 Special Note any way of communication. Failing the same shall permit the staff
to allot the same work to another contractor and shall impose the
penalty to the approved contractor.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add.C.E. (South Zone)
ybœtJtœ Bgwrlrmvj ftuvtuohuNl
ce çjtuf, vnujtu bt¤, mhœth vxuj CJl,
œtKtveX, ybœtJtœ
Email: [email protected]
mkœCo: ltKtk Ft<tlt mh¾gwjh lk.48 <t.29/01/2012, 58 <t.16/03/2012 ,
yt&e <btb Ft<tltk Jzt yr^fthe ©e ytu / yuftWxLx ©e <&t cej fjtfo ©e lu sKtJJtbtk ytJu
Au fu , me¾gtuhexe zevtuÍex <ubs yluoMxble zevtuÍex MjefthJt ctc<u htßg mhfth ©e îtht bkswh &guj
cukftule gtœebtk ltKtk rJCtdlt S.yth.lk. FD / MSM / e-file /4 /2024/ 4020/2859 D.M.O. Date:
01/05/2025 bwsc mw^thtu fhe lJe gtœe cnth vtzJtbtk ytJuj Au.
htßg mhfth ©e lt ltKtk rJCtdlt S.yth.lk. FD / MSM / e-file / 4 / 2023/4020 /
D.M.O. Date: 01/05/2025 îtht me¾gtuhexe zevtuÍex <ubs yluoMx ble le zevtuÍex btxu bkswh &guj
cukftu le gtœe ykdu zu.Bgw.frbNlh ©e (ltKtk) le b¤uj bkswhe X.lk.39 <t.12.05.2025 bwsclt
mœhnw vrhvºt «rmæ^ > <theF ctœ &e <t.31.03.2026 mw^e y&Jt htßg mhfth ©e îtht yt
ctc<u yLg S.yth. «rmæ^ fhJtbtk ytJu ðgtk mw^e yuluûth - 1 btk sKtJuj cukftu le cukf duhkxe
me¾gtuhexe zevtuÍex <&t E.yub.ze. MJYvbtk MJefthJtbtk ytJNu.
ybœtJtœ Bgwrlrmvj ftuvtuohuNl lt <btb Ft<tytu îtht bu¤JJtbtk / MJefthJtbtk ytJ<e
cukf duhkxe le ytu&uLxemexe le yr^f]< aftmKe fhelu / fhtJelu sYhegt< bwsclt fkx[tuj v{tumesh
muxyv fhJtlt hnuNu <ubs mhfth ©e lt S.yth. yLJgu zu.Bgw.frbNlh ©e (VtgltLm) le b¤uj
bkswhe bwsc btºt ybœtJtœ Nnuh le <&t ybœtJtœ rmJtglt yLg Nnuhle ntug ylu <u cukf duhkxe
ybœtJtœ ÂM&< mkckr^< cukfle NtFt îtht yr^f]< fhtguj ntug <tu leau sKtJuj ckuftu le
NtFtytule cukf duhkxe MJefthJtbtk ytJNu. ltKtk Ft<t îtht Wvhtu¾< mkœCobtk sKtJuj vrhvºttu le
yLg <btb Nh<tu g&tJ< hnuNu.
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period
up to March- 31, 2026. The validity cut-off date in the GR is with respect to the date
of issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
2. A U Small Finance Bank
4. Barclays Bank
5.City Union Bank
7.DBS Bank India Limited
9.Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
16.IDFC First Bank
17. Jammu & Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Nutan nagrik Sahakari Bank Limited
3. Rajkot Nagarik Sahakari Bank Limited
4. Saraswat Co-operative Bank
5. SBPP Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. The Gujarat State Co-Operative Bank
9. The Mehsana Urban Co-operative Bank Limited
10. The Surat District Co-operative Bank
11. The Surat Peoples Co-operative Bank
12. The Kalupur Commerical Co-operative Bank Limited
13. The Panchmahal District Co-operative Bank
14. The Baroda District Co-operative Bank
15. Baroda Gujarat Gramin Bank
16. Saurashtra Gramin Bank
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).This is a Two bid System Tender.The Bidder should quote the price bid in tender form before schedule time
Tender Document Vol. 1 , tender fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope
(marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand
Delivery in duplicate.Seprate envolup to be submitted by the bidder clearly marked as “Technical Bid”
and “Financial/Price bid” Price bid shall Remain Only the Price bid,Whenever all othe Documents to be
submitted Under The envolup of “ Technical Bid” This envelope shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, South Zone,
2nd Floor, South Zone Office,
Opp. Fire Station, Maninagar,
Ahmedabad-380008,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for
the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g) All the Bid Document essentially needs to be properly binded/steppled
2. Assessment of Submission
2.1The Employer will open the technical bid of physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures then
announce the names of bidders in the presence of bidders or their representatives who choose to attend
on the date and time mentioned in the NIT In the event of specified date of bid opening being declared
as a holiday for the Employer, the Tender will be opened at the appointed time and location on the next
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the
opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of
EMD furnished with each bid, is valid registration and such other details, as the Employer may consider
appropriate. As per the checklist.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for
Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-responsive
and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD
will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be
rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied by
the requisite certificates, undertaking and other relevant information specified in the bid documents and
is substantially responsive to the requirement of the bidding documents and provides any clarification
for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance
with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria then
bidder bid will be considered for opening of price bid.(Following clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that
such bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General
Terms and Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This
letter shall name the sum which the Employer will pay the Contractor in consideration of the execution,
completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per As per City Engineer
Circular (WRM) no. 6 2011/12 DT: 24/06/2011 after receiving letter of Indent. Time limit of work will
commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his bid.
Such request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison
or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on
its own responsibility all information that may be necessary for preparing the bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury, loss
of or damage to property and any other loss, damage, costs and expenses incurred as a result of the
1. I/We hereby declared that I/We am/are not partner(s) blacklisted or connected with firm blacklisted in any
states, CPWD / MES / Railways or any Government, Semi-Government or Private body.
2. The I / We also hereby certifies that our firm M/s ________________________________has neither
abandon any work in India nor rescinded any contract awarded to us during last five years prior to the date
3. At present I/We am/are registered as approved contractor (s), firms in any state, CPWD / MES / Railways.
4. We, the partners/owners of this firm, hereby give an undertaking that we are jointly and severally
responsible to meet all the liabilities ever and above the business of this firm and make good the above
financial loss sustained by the Ahmedabad Municipal Corporation as a result of our abandoning the works
entrusted to us.
5. I /We hereby certify that all the statements made in the required attachments are true and correct.
6. The I / We undersigned hereby authorise(s) and request(s) any bank, person, firm or corporation to furnish
pertinent information deemed necessary and requested by the Department to verify this statement or
regarding my (our) competence and general reputation.
7. I /We hereby declare that I / We understand and agree that further qualifying information may be
requested, and I / We also agree to furnish any such information at the request of the AMC within the
prescribed time.
8. I / We further declare that my / our near relatives are not working in AMC as an Addl. C.E., Dy. C.E., A.C.E.,
A.E., and T.S. as on today.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in
the table given in the IFB.
1.2 The Works consist of:- Providing and Fixing Interlocking Rubber Mould Paver Block and Stone Paving
Work and Repairing of Paver block and Stone Paving Work at Kundaliya vas raval vas, Ganeshnagar
,Chamundanagar Area, Isanpur gam Area and ramwadi Area,Krantinagar Chhapara and Different places In
Isanpur Ward In South Zone.
2. Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E2" class and or equivalent.
If contractor is not registered with AMC in the relevant class, on award of contract he shall be
required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required
to provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be provided for
all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signature Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons
are attributable to the non-performance of the contractor, consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or
false representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply
with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which
are not substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished by
the bidder may be in another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of interpretation of the bid, the
English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and
the responses thereto shall be made in writing or by fax. A bidder may refuse the request without
forfeiting his bidder agreeing to the request will not be required or permitted to modify his bid but will
be required to extend the validity of his Bid Security for the period of the extension, and in compliance
with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the
person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest
entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer
will declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract
by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in
corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by which
they improperly and unlawfully enrich themselves and/or those close to them, or induce others to
do so, by misusing the position in which they are placed, and it includes the offering, giving,
receiving, or soliciting of anything of value to influence the action of any such official in the
procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road
i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers,
traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic
signs to be provided so that it should be visible at night. During night working hours safety in charge
personnel shall be provided with florescent jackets. This shall be Provided at no extra cost by the bidder
under attaché with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company,
follow up and getting the supply, filling the necessary test reports to the power supply company. All
official fees including security deposits and other expenses shall be of initially paid by the contractor.
AMC may support to get the temporary connection and may at its diseretien get the same converted
to permanent connection at the same of AMC if desired do,and contractor shall as no extra cost
support the same. In this case AMC my be as the remaining cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon
any agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty
shall give the Municipal Commissioner the right to cancel the contract or to take any other measure
as the Municipal Commissioner may deem fit. The warranty does not apply to commissions payable
by the contractor to establish commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or
to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under
this Contract against the contractor the same may be deducted by the Municipal Corporation from any
sum then due or which at any time thereafter may become due to the contractor under this contract
and failing that under any other contract with the Municipal Corporation or from any sum due to the
contractor with the Municipal Corporation (which may be available with Municipal Corporation), or
from his retention money, or he shall pay the claim on demand. The Municipal Corporation reserves
the right to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected not withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of any
work done by the Contractor or alleged to have been done by him under the contract, it shall be
recovered by the Municipal Corporation from the contractor by way of all the means prescribed above
or if any under payment is discovered by the Municipal Corporation, any amount due to the contractor
under this contract or under payment may be adjusted against any amount then due or which may at
any time thereafter become due before payment is made to the contractor from him to the Municipal
Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of any
payment then due or thereafter to become due an amount sufficient to completely indemnify the
owner against such lien or claim or if such lien or claim be valid the owner may be or become due and
payable to the contractor. If any lien or claims remaining, unsettled after all payments are made, the
contractor shall refund or pay to the owner all money that the latter may be compelled to pay in
discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form
the part of the contract documents. The full consideration shall be given to such addendum or
corrigendum before submission of tender duly filled in by the contractor. Therefore, the
contractors shall have to kindly refer the tender for such addendum or corrigendum published by
AMC through its website www.ahmedabadcity.gov.in 48 hours prior to the deadline of submission
of the tender. Tenderers shall verify the number of addendum issued and enclose the same with
the tender documents , failing which the tenders shall be liable for rejection and no any complaint
in respect to this shall be entertained under any circumstances.
Seal and Signature of the Bidder Add.C.E. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer
will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid
for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly as
Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the
bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 10 (ten) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the form
of a Bank Guarantee / DD for an amount equivalent to 5% (Five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a
policy is framed by Audit department of AMC to charge 4% interest for the balance period and
discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along
with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - As Per City Eng. Circular no-3 Date:-03/09/2016
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in the
rates and prices and the total bid price submitted by the bidder and the evaluation and comparison of
bids by the Employer shall be made accordingly.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be
deducted against works welfare cess.
Seal and Signature of the Bidder Add.C.E. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Months (Excluding Monsoon) after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per
design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought
by him on site. This account shall be regularly maintained and kept open for inspection by Municipal Staff.
Watering of all the items shall be as per instructions otherwise no payment shall be made to contractors.
Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C.
works if required shall have to be made by the contractor.The contractor shall be remain responsible for
Workmen’s compensation if any accident. The contractor shall arrange for barricading at night and
arrangement of Pagi at night to direct the traffic. He shall be responsible for any damage to public. If any
incident happen, during the execution of work. In case of dispute for unseen or overlooked items the
decision of the Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final finishing of the
work as directed. All the rejected materials shall be removed from site within 24 hours by contractor at
this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his
own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for extra
rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders
for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during
the period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of
his tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to
any right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form
B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets
of Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
CONTRACTOR'S SIGNATURE Add.C.E. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT / WATER RESOURCES DEPARTMENT
may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of Gujarat State
Road and Building Department / Water Resources Department shall be applicable. Binding on the
contractors unless specifically mentioned about it
Hereunder in clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of Gujarat
“wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State Public
Works Department/Public Works Department/ Government “ wherever written.
04. Please read “ City Engineer" instead of “Superintending Engineer “ or Executive Engineer wherever
05. “Ahmedabad Municipal Corporation “ herein called as“AMC “
06. “Governor for the state of Gujarat “ shall be read as “Municipal Commissioner / Ahmedabad Municipal
07. The contents / details / information mentioned in the relevant point under the heading
Seal and Signature of the Bidder Add.C.E. (South Zone)
Technical conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration
with any other state Govt. or institutions. Copy of registration should be attached with tender
document. Tenderer who was not registred in AMC must be get registred in panel of approved
AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved"
by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards shall
be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness
shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsœver on account of any
such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed
from the site of work within 24 hours.
12. All work shall be carried out in a manner applying the best technique.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works & all precautionary measures during execution
shall have to be kept in sufficient numbers and in good working condition at the site of the work.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory
evidence that such special mode of construction and completion of work to the required
strength and quality. Acceptance of the same by the Engineer in charge shall not however,
absolve the contractor from the responsibility of any adverse effect and concordance of
adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time to
16. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the
work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's
Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to
which work is awarded for execution.
21. The time limit shall be reckoned after 15 days from the date of issue of the written work order to
the contractor. No time extension will be granted under any circumstances.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by
Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement , steel or labour shall be
27. Contractor is requested to see the site physically before tendering. He is also requested to quote
the rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for
the construction of the works and provide a satisfactory supply of potable water for drinking,
washing, sanitation and cleaning down. The contractor will be responsible for all the costs where
applicable of connection, meter installation, water consumed, water required for testing
purposes, disconnection and the laying, maintenances and ultimate removal of any distribution
system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor
must make his own arrangements with the Corporation and Electricity Supply Authorities and
with other contractors to connect and to take a supply from such services, paying all costs in
connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during
the work. No compensation shall be paid for idle labor staff, machineries and for use of diesel
operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance
certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to contractual
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect
will be rejected. Municipal Commissioner reserves the right to increase/decrease the scope of
work. No any claim to that effect shall be entertained. The Municipal Commissioner also
reserves the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement within 15 days from the date if
issue of work order.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of starting
of work will be consider after approval of Dy.M.C. (South zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the item or the scope
40. The payment shall be made as per the A.M.C policy for the work done by the contractor.
41. Conditional tenderes will not be accepted.
Seal and Signature of the Bidder Add.C.E. (South Zone)
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che
NfNu.dJobuLxlt btLg ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft< ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb
fhJt mûtb ntug <ublu s ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk
vwÁk fhJt sYhe mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl
Ve,heLgwyj Ve <&t yvd{uzuNl Ve ylu btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo,
mkkath ylu JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu
rcÕzekkd(fu su ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt
ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb
vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt (12 btm)(atubtmt rmJtg) le hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz (120 rœJm) (As Per City Eng.Circular no-3 Date:-03/09/2016) )
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh<
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu
lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt
jFtK fu ytkkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh
ybtLg dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol
btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt
rJd<tubtkk bwfuj Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne
l fhu y&Jt xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe
hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu
J¤<hltu nff œtJtu fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o
ftb ytve s œuJtlwk Au <uJtu &R NfNu lrn.
9: rJmkkdr< ylu rnmtc stud: nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK
Cwjawf leault rlgbtu ylwmth mhCh fhJtbtkk ytJNu.
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj
hfb btLg htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk
Cwj sKtg <tu yufb œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu
yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt
<theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t <u œhrbgtl ftble 3% juFu zevtuÍex Che
fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk
ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI)
ytvJtbtk ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex
btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: mœh ftbltk xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt ftbdehe vqKo l &tg <tu
FhuFh ctfe ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtbtk ytJNu. (mexe
Rsluh(Rsluh Ft<w) mhfgwjh lk.3 <t. 03/09/2016 bwsc.)
11 y: awfJKe xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk
bswhe, vtjF, ÃjtLx, œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t
sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t
J^thtle ftuR awfJKe ykkdult <ublt ftuR œtJt ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu
y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e
ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe
<btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb
fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu
ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t
Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t
ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc
ftuLx[[tfxhlt cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ (1) z[turkRd
(2)xuLzh Vtubolwk CtJvºtf
ce) z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
3. xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b
dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-
atsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu
<ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt
ftuR btKmlt òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule
sJtcœthe vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle
hnuNu.CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu
Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk k W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt sJtcœth hnuNu
ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk.
Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt
hnuNu.<&t sYh sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc
bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth
<u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx/vtujemlt ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk
ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs
dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe
J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt
CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf
ctuzo,ÃjtMxef vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo
sJtcœthe ftuLx[tfxhle hnuNu.
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe
ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe
yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl
Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog
ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo
ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
30 mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug
<tu <u mbgdt¤tu ctœ fhe ftble mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK
ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw.lemevtj ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t
ylu muÕm xuût lu jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je
2) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
mh¾gwjh lkch 3, <theF 3/9/16
Bgwrlrmvj ftuvtuohuNlbtk Rsluh rJCtd îtht htuz, vtKe, rcÕzekd, z[ulus, jtRx rJduhult ònuh sl<tle mrwJ^tlt
rmrJj ftbtu fhJtbtk ytJu Au. mkcr^< ftbtubtk swœt swœt Ítul <&t «tusufx îtht yufmwºt<t s¤JtR hnu <u nu<w &e
y.Bgw.ftu.îtht JF<tu JF< fhJtbtk ytJuj swœt swœt mhfgwjhtubtk leau bwscltu mw^thtu Bgwrlrmvj frbNlh©ele
b¤uj bkswhe ylwmth fhJtbtk ytJu Au.
1. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t xuLzhbtk ftble sYhe Nh<tu mt&u Vtubo ce-1 le
jtdw vz<e <btb Nh<tu bwscle ftbdehe fhJtle hnuNu vhk<w vulÕxe btxu ltKtkFt<wk vrhvºt lk.-18,
<t.-04/07/2012 lt bwœt lk.1-R btk mwaÔgt bwscltu yuxjufu leau bwscltu fjtuÍ xuLzhtubtk htFJtltu
rlg< mbgbgtoœtbtk ftb vwht l &tg <tu vuLtÕxe Jmwj juJt ctc<:-
(1) nJu vAelt <btb xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt FhuFh ctfe
ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtle Nh< nJu vAelt ftbtbtk
htFJtle hnuNu <&t ntjbtk atj<t ftbtubtk <&t su ftblt Vtglj cej cluj l ntug <uJt ftbbtk vK bw¤
bkswh &guj mbgbgtoœt / Extended Time Limit ctœ &guj ftble vulÕxe Jmwj fhJt ykdu bq¤
bkswh &guj mbgbgtoœt / Liquidated Damages ctœlt FhuFh ctfe ftble hfblt 10% juFu
Liquidated Damages (vulÕxe) Jmwj fhJtlwk sYh sKtg <tu yt bwscltu rlKog juJtle m•tt
Bgw.frbNlh©elu ytvJtbtk ytJuj Au.
(2) xuLzhbtk Milestone recovery (Time yt^the<) le Nh< htFJtbtk ytJuj ntug Au sultu ybj Ft<tyu
fhJtltu ntug Au. vhk<w, ftbdehelt ybjefhK œhrbgtl y.Bgw.ftu.lt fthKtumh ftbbtk rJjkc &guj ntug
sule òK Bgw.frbNlh©elu fhuj ntug <&tmûtb m•ttyu bwœT< J^ fhuj ntug <u JF<u mbd{ ftb
Extended Time Limit btk vwKo &guj ntug <tu Milestone recovery (Time yt^trh<) le fvt<
fhJtle hnuNu lne su bwsclu Nh< nJu vAelt ftbbtk htFJtle hnuNu. Yt bwscltu ybj ntjbtk atjw
ftbbtk <&t su ftblwk Vtglj cej cluj l ntug <uJt ftbbtk fhJtlwk sYh sKtg <tu yt ykdu
Bgw.frbNlh©ele sYhe bkswhe bu¤JJtle hnuNu.
2. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t rmrJj ftbtult xuLzhbtk (1) stu xuLzh mekdj-cez
vræ^r<&e bkdtJuj ntug ylu xuLzhle hfb 50 jtF&e ytuAe ntug <tu xuLzhle Jujezexe vehegz 90 rœJm
yLtu xuLzhle hfb 50 jtF&e J^w ntug <tu xuflefj cez FtuÕgt <theF &e xuLzhle Jujezexe vehegz
rœJm <&t (2) stu xuLzh xw-cez vræ^r<&e bkdtJuj ntug <tu œhuf rfMmtbtk xuflefj cez FtuÕgt <theF &e
xuLzhle Jujezexe vehegz 120 rœJm Au.
3. su ftuLx[t¾xhtu ze, R-1 ylu R-2btk ytJ<tk ntug <uytulu Yt.1.00 fhtuz mw^elt ftbtu btxu ltKtk Ft<tlt
mh¾gwjh lkch 43, <theF 17/10/2012 btk mwaÔgt bwscltu ybj fhJtltu hnuNu.
CONTRACTOR'SSIGNATURE Add.C.E. (South Zone)
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the terms
and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad
specified up to his first written demand, without demur without delay and without the necessity of a
previous of judicial or administrative procedures and without the necessity to prove to the Bank the defects
or short comings or debits of the contractor any sum within the limit of Rs.....................................................
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the (Date to
be specified will not he less than 180 days from the stipulated date of receiving the tender) we shall be
discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of the
Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E. (South Zone) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TECHNICAL SPECIFACATION
Item No. Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with shoring
and struting if required as per required gradient and line including safety provisions using
site rails and stacking excavated stuff including up to all required lead cleaning the site etc.
complete for all lifts and strata as specified. In all sorts of soil and soft murrum.
Road way excavation shall consists of excavation in all sorts of soil incl. removal and
satisfactory disposal of all excavated materials and necessary for the construction of
roadway, side ditches and water ways, in accordance with the requirements of those
specifications and in the lines, and cross sections shown on the drawings of indicated by the
Engineer. This work shall include the hauling and stacking of or hauling to sites of also the
disposal of unsuitable cut materials in specified manner the training and finishing of the road
Construction operations :
After the site has been cleared, the limits of excavation shall be set out true tolines,
curves slopes grades and sections as shown on the drawings or as directed by the Engineer.
The contractor shall provide all labour survey instruments and materials, such as strings,
pegs, nails, bamboos, stones, lime mortar, concrete etc. required in connection with the
setting out of works and establishment of bench marks. The contractor shall be responsible
for the maintenance of bench marks and other marks and stacks as long as they required for
work in the opinion of the Engineer.
Excavation – General :
All excavation shall be carried out in conformity with the directions laid here in
under and in a manner approved by the available from excavation aresatisfactorily utilized
as decided upon before hand.The earthen shoulders of the road shall be excavated to match
the profile or the chamber of the asphalt road. The excavation shall conform to the lines,
grades side sloes and levels shown on the drawings or as directed by the Engineer. The
contractor shall not excavate outside the slopes or below the established grades or loosen
material outside the limits of excavation.Subject to the permitted tollerance any excess
depth excavated below the specified levels on the roadway shall be made good at the cost of
the contractor with suitable material of similar characteristics to that removed and
compacted to the requirements. All debris and loose material on the slopes of cuttings shall
be removed. No back filling shall be allowed to obtain required slopes excepting that when
boulders or as directed by the Engineer. While doing so, care shall be taken to see the no
portion of the existing payment, pavement
designated to the retained, is loosened or dis-loosened or disturbed.
Dispose of Excavated Material :-
If there be any stone in the excavated materials, suitable for rubble packing, road
metal or for building or any other Municipal purposes, it shall be separated and stated
above, and without extra charges.
Preservation of Property :
The contractor shall take all reasonable precautions for the protection and
preservations of any or all existing road side trees, drains, sewers or other subsurface drains,
pipes, conduits and any other structure under or above ground. the excavation for the road
work will be paid on the basis of sectional measurements irrespective of the work.
The mode of measurnment shall be on Cmt basis.
Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal of
surplus stuff as directed within a radius of 3 km.(GWSSB SOR 2022-23) SECTION : 1 & 2.B -
LABOUR It.No.14, Pg.No.40
The mode of measurnment shall be on cmt basis.
Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge,
excavated rock ,fly ash,aggregate of any kind etc. comp.up to 5.0 Km. and 10.00 Km. lead
All the surplus earth etc. shall be carried away immediately from the site of work to
a place within average 5 km & up to 10 km distance as directed and shall be dressed as
ordered by the Engineer, so as not tocause any in convenience to the public or traffic. Failing
which in view of public as safety and trafficconvenience the Corporation shall carry out the
work by any other agency at the contractor's risk and cost. If theinstructions are not
complied within 7 days from the date of order to cart the surplus materials and clear site,
thesaid work shall be carried out by the Municipal Corporation at the risk and cost of the
contractor and so claim ordispute entertained in this respect.
Payment shall be done in cmt. basis.
Providing and supplying Lowering, laying and jointing ISI marked only standard
length Stonewate pipes in standard lengths of following class and diameter with cement
joints in C.M.1:1 proportion in proper position , grade and alignment at all level as directed
by Engineer-in- charge including conveyance from stone to site of work, Jointing material
etc.comp. including all taxes,insurance, transportiton, fright charges, octroi,inspection
charges, loading, unloading, conveyance to departmental stores, stacking etc. complete.
The mode of measurnment shall be on Rmt basis.
Providing and supplying ISI Standard RCC pipes (of sulphate resisting Cement )in
standard lengths of following class and diameter suitable for rubber ring joints (socket and
spigot) including all taxes,insurance, transportation,treight charges,octroi,inspection
charges, loading,unloading, conveyance to departmental stores, stacking etc. complete .
Class NP3 Test pressure 0.7 Kg/Sq.Cm
The mode of measurnment shall be on cmt basis.
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in
proper position , grade and alignment at all level as directed by Engineer-in- charge including
conveyance from stone to site of work, labour giving hydraulic testing as per ISI code. (GWSSB
SOR 2022-23) SECTION : 1 & 2.B - LABOUR It.No.11 b-6,10,11,13 Pg.No.39
The RCC pipes shall be procured as per ISS for B class type specifications using best
materials, first classworkmanship as per IS 458/1971.The proportion of concrete shall be one
part of cement to 2 parts sand and 4 parts of black trap agg.mix of suitablesize to as to
produce unifrom concrete through out thickness of the pipes.Reinfprcement in from of bars
straight and class wise shall be provided as per IS 458 clasifications.RCC spunpipe collars for
the pipes shall be made in the same manner. The internal dia meter of the collar shall
besufficiently large to allow a perfect joint around the outside of the pipes with cement
mortar and other plasticmaterials.Pipes shall be laid are fully into trenches and shall be made
to rest evenly on specially prepared formation or onconcrete bed and for the purpose to extra
rate shall be given making extra excavation for bed and in the sides of the trenches.All joints
shall be thoroughly fitted using spun yarn of approved quality for the groove in the lenght. For
eachjoint yarn shall be dipped in hot asphalt.The joint shall be properly cleaned and moistered
and the coller shall bekept in position by means of wedges.Semidry cement mortar of pro.1:1
shall be forced into joints and chucked completely by means of special cutting tools until the
whole space is full. The mortar shall be sprayed around thecollar joints so as to completely
encase the joints.After the joints have throughly set.The Engineer or his Assistant may inspect
the joints, and if the has any doubt as to their soundness be may required the contractors to
cut open and clear away the cement of any joint that he may select and to make good the
same at their expenses provided that, unless some defect be found, they shall be required to
open more than one joints in 18mt(60')of pipe, through if defected be found the Engineer
direct them to open as many joints as following day and the cement may has sufficient time to
set well before being covered up.Trenches shall not be filled until alignment and levels are
examinied by the Engineer or his sub ordinates and the permission for refilling is granted.
As per Item and instructed by engineer incharge.
The mode of measurnment shall be on Rmt basis.
a. Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10)
for foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc..completed.
Constructing Slab Type Chamber Of Following Size Including Excavation, Refilling, Bbcc
(1:5:10), For Foundation, C.C.Channel (1:2:4) Finished, 15 Mm Thick Cement Plaster
Inside & Outside In Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe
Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc 1:1.5:3,
Including Centering & Reinforcement But Excluding The Cost Of Chamber Seat Cover
Etc.Completed. (A) 0.60 X 0.45 Mt. Size Inside Clear, Depth From 0.0 To 0.90meter For Pipe
Dia <=150mm. and (B) 0.75 X 0.75 Mt. Size (Inside Clear) Depth From 0.0 To 1.20 Meter For
Pipe Dia <=230 Mm
The mode of measurnment shall be on cmt basis.
Item No. : Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10), Cc Channel (1:2:4) Finished, 15 Mm Thick Cement
Plaster Inside & Outside (Only For Shaft) In Cm 1:3, Finishing With Cement Slurry, P/F
Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm
1:5, Rcc Slab In Cc1:1.5:3, Including Centering & Reinforcement But Excluding The Cost
Of Machinehole Seat Cover Etc..Completed.
Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
Refilling, Brick Bats Cement Concrete (1:5:10), Cc Channel (1:2:4) Finished, 15 Mm Thick
Cement Plaster Inside & Outside (Only For Shaft) In Cm 1:3, Finishing With Cement Slurry,
P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In
Cm 1:5, Rcc Slab In Cc1:1.5:3, Including Centering & Reinforcement But Excluding The
Cost Of Machinehole Seat Cover Etc..Completed. Of Size 0.75 X 1.00 Meter (Inside Clear)
& Depth 1 To 2 Meter and Of Size 0.75 X 1.00 Meter (Inside Clear) & Depth 2 To
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt
for constructing slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit of DM
should be reduced in this item)
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt for
constructing slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit of DM should
be reduced in this item)
Constructing Slab Type M.H. Chamber of following size incl. excavation, refilling brick bats
cement concrete (1:5:10) for foundation C.C. channel (1:2:4) finished, 15 mm. th.cement
plaster inside & outside (Only For Shaft) in C.M.1:3 finishing with cement slurry, P/F 4 mm
dia M.S Steel HDPE coated steps 35 cm c/c at 35 cm staggered Masonry in C.M. 1:5, R.C.C
slab in C.C. 1 : 1.5 : 3 including centering and reinforcement but excluding cost
ofmachinehole seat cover etc. complete Of size 1.00 x 1.40 mt. (inside clear) and Depth
from 0.00 to 2.00 mt. For pipe dia<= 800 mm dia(App.Rate) (A) 1.00 to 2.00 meter depth,
(Drainage SOR 2009-10, M.H.Chamber, Item No.131, Page No. 33) (B) 2.00 to 3.00 meter
depth, (Drainage SOR 2009-10, M.H.Chamber, Item No.132 Page No. 33)
The sewet trench shall be excavated to the alignment and gradient shown on the
plan and section. In all storts soil including oil masonary asphalt roads and wet. excavation .
The sewer excavation shall be commenced at the down stream end of the sewer and be
continued upto the gradient as directed. The trench shall not open more than 60 meters in
advace of the completed sewer only when directed by the Engineer in charge looking to the
progress of the work in obtaining the formation of the bottom of the trenches the usual
methods of suing sight rails and bonning roads shall be adopted during the whole of the
process. The center line of uniform height shall be carried clearly on each rail. The depth of
the excavation and invert of the sewer shall be checked by means of bonning road of
appropriate length and also straight edge.The bed of the trench be shall well remmed before
starting laying of sewer ines and cement concrete and masonary work.Where trenches are
deep in bad grounds the sides shall be supported by suitable imbering of shorting
worklooking to the nature of soil near big or important structures, the sides of the trenches
shall be closely and securely timbered. If any settlement of the building is anticipated the
timbering shall be left in the ground. The various materials excavated shall be separately
stacked so that in refilling the may be relaid on the same order as before and least possible
damage shall be done carpet on the public roads and private properties. Surface covering
consisting of asphalt carpet shall be kept on one side and preserved for reinstatement. The
excavated earth shall not heaped near the trenchers so as to caused unnecessary
obstruction along the pulling inspection, trenches etc. shall be tunneled under only as
necessary. The side of the trenches shall be nearly vertical and plumb & red lightshall be
placed at each end at intervals as instructed and further protested by rope fence. Necessary
caution boardsshall also be erected and diaced as directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not
placed nearer than 3 metersfrom the outer edge of the excavated trench. The utmost shall
have to be taken in refilling the trenches so that no damage may be done no sewer no lump
shall be allowed to be put around the sewer. The remming of the filling shall be done and
well watered. The surplus earth shall be removed directed within 30 meters lead. The
measurement of the work shall be exact length and width of the trench as specified or as per
City Engineer instruction and depth shall be measured vertical as per section upto invert or
the pipe lind The City Engineer reserves the right of extra excavation on either side if
considers necessary for the safely of the work.The bottom and sides of the trench shall be
dressed in level and plumb in all directions before any concrete in India. In case the
excavation is done deeper than required no filling shall be allowed to bring the formation to
proper level but contractor shall have to lay cement or lime be concrete of filling or other
acceptable materials as directed by C.E. at contractor won cost so as to come to proper
information, in case bas formation are met with the work shall have be done as per
instruction of C.E. necessary arrangements for watering trenches must be provided be
contractor and without proper watering trenches will not be allowed to be tilled to further.
Contractor shall have to make arrangement for acees to invert of the sewer and for
inspection of the ware as ordered by the Engineer. If is required to shired or after the
alignment section of diameter of the pip the contractor shall carry or altered the alignment
section or diameter of the pipe the contractor shall carry out the altered work at the rates
quoted by him for the original work for items and contractor shall not claim any expenses
due to the changes made.In case no work shall be done at night or on Sundays & other
holidays and during the recess time exceptin and other holiday the case of bad grounds such
as running sand where the work must be executed various daynight without intruption when
so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not
in the opinion of Engineer required to be charged in location shall be supported and
protected from injury by the contractor. The contractor shall be liable to pay all damages to
water pipe, drains electric and telephone cables and to private property during the
execution of this contract and the same will be recovered from the running bills or
thedeposit of work whenever it becomes necessary in the opinion of the Engineer in charge
location of any existing sewers drains etc. not otherwise from in these specification the
contractor shall do the work of making such change and the work shall be paid for as extra
work. All places of public utility etc. shall be kept accessible for use. No extra payment shall
be made for land sides and side slopes done without prior approval of the Engineer in
charge. Wherever natural soil commends winder excavation the mentioned above the same
shall be given after approved C.E. The rate for excavation for easy jointing and caulking
nothing extra shall be paid for this. Refilling of trenches shall be done only after the grade of
line and hydraulic test practicable of the lines are checked and approved of and order given
by the Engineer in charge. The refilling shall be accompanied by through watering the layers
of 0.50 metrs. Further refilling shall be done there after and process should be repeated till
trenches are completely refilled. Temping and ramming with rammers shall have to be done
at all place of important work where ordered by Engineer in charge. After the trench is give
the trenches shall have to be refilled within 4 days with complete watering. If the contractor
fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so
recovered from the contactor either in cost or from his payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size.
These shall be free from earth and shall be got app. use. Sand shall be clear coarse, sharp
and free from earth and other impurities.Mixing shall be done on brick or stone platform or
of brickbats to mortar shall be measured in heaps by brick height irregular measure. If
ordered by C.E. Concrete shall be laid in layers of 15 cms. and well consolidated maintained
by the contractor for before commencing the brick work. over boxes, concrete shall be well
watered. The mix shall be done in prop. of 1 : 5 :10.
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13,
water shall confirmM-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement,
part of sand and 10 parts of coarse agg. by volume. and the work shall be carried out as per
inst. of Engineer in charge and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n
PWD Hand book NO. 2.These shall be well burnt and free from all defects and shall be got
approved by the Engineer in charge before the work is started. Cement to be used for
mortar shall comply with PWD Hand book specifications, cement mortar in the brick work
shall be 1 part of cement, 5 parts of sand. Every brick well sacked in water is required to be
laid I full & closed joints of cement mortar the thickness of which shall not exceed 1.25 cms.
If on removal of centering any open joint shall be found, these shall be pointed immediately.
Special care shall taken to make the face of brick work smooth brick work shall be toothed or
shall racked back in coarse.All intrades of curves shall be worked from temple strictly made
to dimensions as per 1974-75 latest plan and section approved by C.E.Brick work in general
shall be of first class workmanship & shall be executed according to the plan working proper
dimention & as directed by the Office in charge from time to time. Brick should be
thoroughly wetted in water before use. All brick work to be cleaned & wetted before laying
cement mortar shall be prepared in special iron pals. And mixed bag of 1.25 cft. or 1 cft. as
measured as the case may be. All materials shall be stacked in
one side so as not to obstruct traffic in any way. The masonry should be constructed
in proper workmanship like manner with jointing plumb etc. to confirm with the general
specification No. 45 PWD Hand Book. The face work should be nearly finished. The shall be
kept watered for a week at least three days after the date of completion.
Providing and laying cement concrete 1:2:4
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
In general, plain and reinforced concrete work for machineholes shall be carried out in
accordance withlatest version of IS 456 unless otherwise specified in this specification. The
slab of machinehole shall be cast withshutters lined with plywood and shall be smooth
finished. For avoiding surface cracks due to variation in atmospheric temperature and
exposure to direct sunlight, RCC slab of machineholes after casting shall be kept wet. M
grade of concrete used for construction of RCC machineholes shall have minimum cement
content of 360 kg/cum of concrete. Bar bending schedule forreinforcement shall be
prepared by contractor and got approved from owner/ engineer before proceeding with
thework. Minimum cover to the reinforcement shall be 40 mm. The rate includes cost of all
labour, materials, tools and plant etc. required for satisfactory completion of this item as
described above.& the drawing as per A.M.C Dr. S.O.R shall be final. The rate shall be for a
unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and dimensions
shows as on thedrawings or as directed.Steel shall be clean and free from rust and loose mill
scale at the time of fixing in position andsubsequent concreting.Reinforcing steel shall
conform accurately to the dimensions given in the bar bending schedules shown on relevant
drawings. Bars shall be bent cold to specified shape and dimensions or as directed using a
proper bar bender, operated by hand or power to attain proper radius of bends. Bars shall
not be bent or straightened in amanner that will injure the material. Bars bent during
transport or handling shall be straightened before being used on the work. They shall not be
heated to facilitate bending. Unless otherwise specified, a ‘U’ type hook at the end of each
bar shall invariably be provided to main reinforcement. The radius of the bend shall not be
less than twice the diameter of the round bar and the length of straight part of the bar
beyond the end of the curve shall be at least four times the diameter of the round bar. In
case of bars which are not round and in case of deformed bars, thediameter shall be taken
as the diameter of circle having an equivalent effective area. The hooks shall be suitably
encased to prevent any splitting of the concrete. All the reinforcement bars shall be
accurately placed in exact position shown on the drawing and shall be securely held in
position during, metal hangers, supporting wires or other approved devices at sufficiently
close intervals,. Bars shall not be allowed to sag between supports nor displaced during
concreting or any other operations of the work. All devices used for positioning shall be of
noncorrodible material. Wooden and metal supports shall no extend to the surface of
concrete, except where shown on drawings. Placing of broken stone orbrick and wooden
blocks shall not be allowed. Pieces of broken stone or brick and wooden blocks shall not be
used. Layers of bars shall be separated by spacer bars, precast mortar blocks or other
approved devices.reinforcement after being placed in position shall be maintained in a clean
condition until completely embedded inconcrete. Special care shall be exercised to prevent
any displacement of reinforcement in concrete already placed.AMC- DRAINAGE/SWD PIPE
LINE TENDER Page 28To prevent reinforcement from corrosion, concrete cover shall be
provided as indicated on drawings. All the bars producing from concrete and to which other
bars are to be spliced and which are likely to be exposed for a period exceeding 10 days shall
be protected by a thick coast of neat cement grout.Bars crossing each other where required
shall be secured by binding wires (annealed) of size not lessthan 1 mm in such manner that
they do not slip over each other at the time of fixing and concreting.As far as possible, bars
of full length shall be used. In case this is not possible, overlapping of bars shallbe done
directed. When practicable, overlapping bars shall not touch each other, but be kept apart
by 25 mm or1.25 mm times the maximum size of the coarse aggregate whichever is greater
by concrete between them. Where not feasible, overlapping bars shall be bound with
annealed wires not less than 1 mm thick twisted tight. The overlaps shall be staggered for
different bears and located at points along the span where neither shear nor bending
movement is maximum. Whenever indicated on the drawings or desired by the Engineer- in-
charge, bars shall be joined by coup lings which shall have a cross-section sufficient to
transpit the full stresses of bars. The ends of the bars that are joined by coupling shall be
upset for sufficient length so that the effective cross section at the base of threads is not less
than norma l cross-section of the bar. Threads shall be standard threads. Steel for coupling
shall conform to I.S. 226When permitted or specified on the drawings, joints of
reinforcement bars shall be butt-welded so as totransmit their full stresses. Welded joints
shall preferably be located at points when steel will not be subject to more than 75 percent
of the maximum permissible stresses and welds so staggered that at any one section not
more than 20 percent of the rods are welded. Only electric are welding using a process
which excludes air from the molten metal and conforms to any or all other special provisions
for the work shall be accepted. Suitable means shall be provided for holding bars securely in
position during welding. It shall be ensured that no voids are left in welding and when
welding is done in two or three stages, previous surface shall be cleaned properly. Ends of
the bars shall be cleaned of all loose scale, rust, grease, paint and other foreign matter
before welding. Only competent welders shall be employed on the work. the M.S. electrodes
used for welding shall conform to I.S. 814. Welded pieces of reinforcement shall be tested.
Specimen shall be taken from the actual site and their number and frequency of test shall be
R.C.C. Bedding :
Cement concrete for the bottom portion of machinehole shall consist of one part of
cement two parts of sand four parts of black trap metal of other approved material of 0.6 to
2.5 cms size from well graded as per instruction. The rate includes all necessary materials
mixing lifting placing ramming watering etc. the exposed faces to be neatly finished smooth
with cement as per instructions. The concrete work to kept constantly watered for at least
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement
& 3 parts of sand in uniform thickness with surfaces trely in plums. The work in general shall
comply with general specifications for plaster No. 64 in PWD hand book. The plaster surfaces
to be kept damp at least for a fortnight. All internal sides of the machineholes including soffit
of the arch shall be provided with cement plaster.
FRC machinehole cover with seat to be set in cement mortar with cement concrete of 1 : 2 :
4 prop. alround. FRC cover shall be marked with year mar AMC. etc. & arrow showing the direction
of flow.Foot steps shall be of the best quality PVC as specified above true to dimensions. The rate
includes mixing the same in position as directed PVC foot steps of approved design and quality shall
have to be fixed if so ordered by C.E. without extra charges. PVC steps shall be fixed at interval of
cm. vertically & 22 cm. horizontally starting from the invert of the line.
Mode Measurment
The mode of measurement shall be on Nos.
Extra rate over item of Constructing Slab Type M.H. Chamber of following size for constructing M.H.
Chamber, per 1.00 Decimetre of additional depth or part thereof. etc. complete. Of size 1.00 x
mt. (inside clear) and Depth from 4.00 to 5.00 meter depth,
Extra rate over item of Constructing Slab Type M.H. Chamber of following size for
constructing M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof. etc. complete.
Of size 1.00 x 1.40 mt. (inside clear) and Depth from 4.00 to 5.00 meter depth,
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 1.40 mt for
constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt for (MH above
3.0 mt depth) below Ground Level (Max. 5 unit of DM should be reduced in this item)
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 1.40 mt for
constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt for (MH above
3.0 mt depth) below Ground Level (Max. 5 unit of DM should be reduced in this item)
Dismantling of existing Arch type machinehole up to Arch and then Const. Slab type
machinehole of following size incl. excavation, refilling and & finished 15 mm thick cement plaster
inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in
masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as directed
by engineer in charge. Rate includes carting of debris and excavated soil (A) 1.00 x 0.75 mt (inside
clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)
From 0 to 2 mt depth (Slab at Ground level).(B)1.00 x 0.75 mt (inside clear) RCC Slab of thickness
C.M& reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)(C)1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
Ground level)(D)1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From
G.L.)(E)1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at
C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
Dismantling of existing Arch type machinehole up to Arch and then Const. Slab type
machinehole of following size incl. excavation, refilling and & finished 15 mm thick cement plaster
inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in
masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as directed
by engineer in charge. Rate includes carting of debris and excavated soil (A) 1.00 x 0.75 mt (inside
clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)
From 0 to 2 mt depth (Slab at Ground level).(B)1.00 x 0.75 mt (inside clear) RCC Slab of thickness
C.M& reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)(C)1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
Ground level)(D)1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From
G.L.)(E)1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at
C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete. a. 150 mm to 300 mm dia. b. 400 mm to 600 mm dia.
Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete. a. 150 mm to 300 mm dia. b. 400 mm to 600 mm dia.
Cutting the pipes of following dia coming in the new M.H.in running sewer including cutting
bars, including removing debris /silt from the M.H. and carting at a suitable distance etc..complete
as directed. No payment for M.H. work will be made until pipe is not cut completely in all respect.
150 mm to 300 mm dia. and 400 mm to 600 mm dia.
Cutting the pipes of following dia coming in the new M.H.in running sewer including cutting
bars, including removing debris /silt from the M.H. and carting at a suitable distance etc..complete
as directed. No payment for M.H. work will be made until pipe is not cut completely in all respect.
150 mm to 300 mm dia. and 400 mm to 600 mm dia.
Repairing damaged M.H. and rasing M.H. up to road levelincl. removing damaged brick
work and repairing by brickmasonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.steps
and existing MH sheet cover, removing the debris from MH and carting the same as
As per Item and instructed by engineer incharge.
Payment shall be done in No. basis
Providing Kachcha or pakka dummy in the following dia pipesand removing the same after
the connecting of the work as per instruction 100 mm to 300 mm dia. and 350 mm to
Providing Kachcha or pakka dummy in the following dia. Pipes in such a way that there is no
seepage of water through it & and removing the same after the completing of the work as
directed by Engg. In charge of work. 150 mm to 300 mm. The M/s shall be on No. basis
Supplying, labour for break down repairing work for activities like excavation, disliting,
debris from trench back filling etc. comp. as directed by Eng.in charge. Mazdoor at day
/Night and Makadam/ supervision at day / Night
Supplying, labour for excavation of all types of soil at any depth including excavation
ofasphalt pavement of any thickness, demolition of brick work in CM of any proportion
includingstacking of serviceable materials and disposal of unserviceable material etc. comp.
as directed.no labourer shall be of age 18 years or below. contractor is required not to
supply any childlobour.Supervisor or mukkadam shall be supplied as per the in struction of
Engg in charge.
M/s. shall be on No. basis.
Providing and operation dewatering Pump including fuel charges & operator Charges etc.
as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be
allowed for non working condition of machinery )
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed
for non working condition of machinery )
Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and laying work)
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge
rate includes all nece. shifting, fuel and operating charges and stacking of useful & non-
useful materials separately up to store. (No payment should be allowed for non working
condition of machinery and for pipe line excavation and laying work)
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
by using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work) ( Based on Previously approved rate by C E sir )
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H. work.
Allowed only for break down work) ( Based on Previously approved rate by C E sir )
Item No. Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver
Item No. Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with
mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the
catch pit in the proportion of CM (1:3) with out jali etc. comp. as directed. (As per R.A. Based
on Building SOR 2015-16)
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with
mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the
catch pit in the proportion of CM (1:3) with out jali etc. comp. as directed. (As per R.A. Based
on Building SOR 2015-16)
Item No. Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(A) F.R.C. Extra Heavy Duty (EHD-35) Machinehole Covers & Frames Cover : 728mm ø &
mm thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø
plain round bar for lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø
clear opening, outer size- 888x888x175 mm. On the upper periphery of frame 25 x
mm wide MS flat should be well embed in concrete to protect the edges of frame. FRC
E.H.D.-35 machinehole cover & frame described as above
(B) FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and
frame size 560 mm clear opening size 890 x 890 x 120 mm.
(C) FRC medium duty cover size 670 mm dia & 70 mm thick 10 M.T. load design and frame
size 560 mm clear opening outer size 780 x 780 x 120 mm
(D) FRC medium duty Chamber seat cover (FRC) cover 706 x 556 x 50 mm rectangular cover
frame size 600 x 450 mm clear opening outer size 816 x 666 x 100 mm (MD-10)
(E) FRC light duty Chamber seat cover (FRC) cover with rectangular frame (LD-2.5)
As per Item and instructed by engineer incharge.
Payment shall be done in No. basis
Set F.R.C. Strom Water Grating Grating(Jali): 740 x 740 x 90mm square jali, 10:00 MT load
design, 90x2mm MS flat allround, Frame: 600 x 600mm clear opening, outer size- 900 x
x 165 mm. On the upper periphery of frame 25 x 3mm wide MS flat should be well
embded in concrete to protect the edges of frame (Based on Central Store Rate)
Set F.R.C. Strom Water Grating Grating(Jali): 740 x 740 x 90mm square jali, 10:00 MT load
design, 90x2mm MS flat allround, Frame: 600 x 600mm clear opening, outer size- 900 x
x 165 mm. On the upper periphery of frame 25 x 3mm wide MS flat should be well embded
in concrete to protect the edges of frame (Based on Central Store Rate)
CONTRACTOR'S SIGNATURE Add.C.E. (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
859 DRAINAGE TECHNICAL BID.pdf
859 drainage price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .