| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹45.3 L+₹1.4 L (3.16%)Rejected-AOC PUTHUSSERY HOUSE CHEVAYUR POST KOZHIKODE 673017 | KOZHIKODE | KOZHIKODE | KERALA | 673017 | L2 | Rejected-AOC L2 | |
| 3 | L3₹45.8 L+₹1.9 L (4.38%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹48.1 L+₹4.2 L (9.52%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹49.0 L+₹5.1 L (11.5%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹56.1 L
EMD Value
₹50,000
Closing Date
4 Apr 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer Harbour Engineering Division Kozhikode Puthiyanirath, Elathur P.O Kozhikode 673303
UCR KOZHIKODE DIST.-CONSTRUCTION OF FOOTPATH CUM DRAIN IN DIVISION 38 OF YATHEEMQHANA MADRASA ROAD IN KOZHIKODE CORPORATION
2022_HED_484473_1
HED/EE/26/2021-22e-T/s
Open Tender
Civil Works - Roads
Item Rate
180 days
Karuvanthuruthi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹50,000
Yes
3 Aug 2022
26 Mar 2022
8 Apr 2022
26 Mar 2022
4 Apr 2022
26 Mar 2022
26 Mar 2022 - 30 Mar 2022
60 days
Amount
DETAILED ESTIMATE
3.4 : Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20 (i)Nominal mix (1:2:4)
2.3.B.4 : Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. B. Lead upto 1000 m (iv)Girth above 1800 mm to 2700 mm
APPENDIX B
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
APPENDIX C
55.23 : Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
DEVADAS S
CHARKALA KUNJUTY KABEER
NALINAKSHAN.P.I
sajid pakkada
biju p v
TECTONICS ENGINEERING PROJECTS
NOVEL CONSTRUCTIONS
Bidder Name
NOVEL CONSTRUCTIONS
NALINAKSHAN.P.I
DEVADAS S
SALIH N M
sajid pakkada
TECTONICS ENGINEERING PROJECTS
biju p v
CHARKALA KUNJUTY KABEER
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_696339.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .