Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹19.9 LAccepted-Finance CANARA BANK RAJARBAG UMC UDAIPUR GOMATI TRIPURA PIN 799120 | GOMATI | TRIPURA | 799120 | ₹19.9 L | L-1 | Accepted-Finance Accepted as L-1 |
| 2 | L-2₹20.3 L+₹44,413 (2.23%)Accepted-Finance OLD OFFICE TILLA P O SABROOM SOUTH TRIPURA TRIPURA | SABROOM | SOUTH TRIPURA | TRIPURA | 799145 | ₹20.3 L+₹44,413 (2.23%) | L-2 | Accepted-Finance Accepted as L-2 |
Tender Value
₹24.3 L
EMD Value
₹48,538
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive Engineer, ARDD
Engineering Cell, Directorate of ARDD
Establishment of Animal Feed Analytical Laboratory at SDIL Abhoynagar, Agartala West Tripura/ Construction of Animal Feed Analytical Laboratory
2026_ARDD_75609_1
1(20/EE/)E-C/ARD/Works/Ten/24
Open Tender
Civil Works - Building
Item Rate
180 days
SDIL Abhoynagar, Agartala
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
₹48,538
Yes
21 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
11 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Colum for 1st floor | 5.67 | cum | 12,925.6 | ₹73,288.15 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 35.8 | cum | 13,204.3 | ₹4,72,713.94 |
| 3.1 | Centering shuttering including struttings, propping etc . And removal of form work for : i) Column, pillars, Piers, Abutments, Post and Struts with shuttering ply. | 75.64 | sqm | 625.5 | ₹47,312.82 |
| 3.2 | Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply. | 150.79 | sqm | 499.4 | ₹75,304.53 |
| 3.3 | Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply. | 146.64 | sqm | 729.5 | ₹1,06,973.88 |
| 4 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 4,619.85 | Kg | 103.9 | ₹4,80,002.42 |
| 5 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 183.6 | sqm | 1,533.5 | ₹2,81,550.6 |
| 6 | 12 mm cement plaster of mixCement mortar 1:4 (1 cement : 4 fine sand) | 199.8 | sqm | 224.2 | ₹44,795.16 |
| 7 | 15 mm cement plaster on the rough side of single or half brick wall of mix:Cement mortar 1:4 (1 cement : 4 fine sand) | 350.14 | sqm | 260.6 | ₹91,246.48 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 6.84 | cum | 11,355.7 | ₹77,672.99 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.48 MB
DNIT.pdf
Tender Documents • 1.86 MB
BOQ_76973.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .