Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
24 Nov 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Constt of culvert from land of irshad khan and others at Baba wayil bala Halqa Babawayil Block Ganderbal DDC 92 2nd Call
2025_RDPR_295454_14
E NIT 121/2025-26 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW GANDERBAL
₹3,000
24 Nov 2025
17 Nov 2025
25 Nov 2025
17 Nov 2025
24 Nov 2025
17 Nov 2025
Earthwork in excavation by mechanical means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils
Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete
Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:4:8mix (1cement: 4coarse sand: 8 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job
Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job
Centring and shuttering including propping, strutting and removal of form work for foundations, footings, bases of columns for mass concrete
Centring and shuttering including propping, strutting and removal of form work for foundations, footings, bases of columns for mass concrete
Reinforced cement concrete work in suspended floor, landings, , shelves, chajjas, lintels, bands, stairs cases & spiral stair cases upto floor five level excluding the cost of centering shuttering, finishing & reinforcement with 1:1.5:3 ( 1 cement: 1.5 coarse sand:3 graded stone aggregate (20mm N/S)
Reinforced cement concrete work in suspended floor, landings, , shelves, chajjas, lintels, bands, stairs cases & spiral stair cases upto floor five level excluding the cost of centering shuttering, finishing & reinforcement with 1:2:4 ( 1 cement: 2 coarse sand:4 graded stone aggregate (20mm N/S)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto and above plinth level Mild steel and medium tensile steel bars
12mm thick cement sand plaster in 1:6 mix
Carriage of materials aggregate/sand by means of mechanical transport for an average lead of 15km
Provision for signboard and photographsand back filling behind abutment
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_956427.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .