| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹11.2 L+₹26,400 (2.41%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹12.2 L+₹1.2 L (10.9%)Rejected-Finance 19 SAINIK COLONY BAIRAGARH BHOPAL MP 462 030 | BHOPAL | MADHYA PRADESH | 462030 | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹12.5 L+₹1.5 L (13.9%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | L5₹13.5 L+₹2.6 L (23.5%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN LOWEST |
Tender Value
₹16.9 L
EMD Value
₹33,800
Closing Date
27 May 2020, 6:00 pmClosed
GE BHOPAL
GE BHOPAL
SERVICES FOR RUNNING AND OPERATION OF KEY PERSONNEL PUMP HOUSE, NEW MH PUMP HOUSE AND FIRE PUMP HOUSE INCL FIRE FIGHTING SYSTEM AT BAIRAGARH UNDER GE BHOPAL
2020_MES_341613_1
8653/E8
Open Tender
Electrical Maintenance Service
Item Rate
335 days
BHOPAL
Class E
Category d v
6 documents required · 6 mandatory
₹500
Yes
GE BHOPAL
₹33,800
Yes
3 Jul 2020
29 Apr 2020
29 May 2020
29 Apr 2020
27 May 2020
15 May 2020
Amount
NOTES :- If the quoted amount is less than the estimated cost of the work i.e. Rs.16,88,000/-, then the lowest bidder will have to deposit a FDR in favour of 'GE BHOPAL' within 07 days of opening of financial bid for the difference in estimated cost i.e. Rs.16,88,000/- and quoted amount. In case the said FDR is not submitted within stipulated period as mentioned above, the contractor shall be banned for 6 months and his bid will be rejected. FDR shall be released only after satisfactorily completion of work.
Services for running & operation of Key personnel pump house:- including operation of surrounding borewells 07 bore wells round the clock , including Sunday & holiday comprising of following:- (a) Pumping & storage:- By operating 07 Nos bore wells 3 to 15 HP capcity for storage of water in 3 x 10000 ltr PVC tank at key person pump house. (b) Supply & Distribution : For supply 1 x 12.5 HP monoblock pump and 1 x bleaching dozer and its electrical control panel to supply water to Key personnel area, GE office, Supply depot and remaining time to by operating sluice valves as per schedule timings including checking of pressure at end point. Note:- Bleachig powder for bleaching dozer shall be supplied by Department. The following staff to be employed:-
FGM 01 in 02 shift i.e. each shift of 08 hrs, shift timings will be as directed by Engineer-in-charge. (02 FGM per day)
Services for runnig & operation of MH pump house (New Location) :- including operation of 01 borewell to fill up the sump and 2 x 20 HP Pump set to lift the water from UG Sump to O/H tank of cap 1.0 LG for further destribution on all days of month , including Sunday & Holiday complete all as directed as specified. The following staff to be employed.
FGM 01 in 02 shift i.e. each shift of 08 hrs, shift timings will be as directed by Engineer-in-charge. (02 FGM per day)
SERVICES FOR OPERATION OF FIRE PUMP HOUSE & FIRE FIGHTING SYSTEM AT NEW MH Bairagarh:- Services for running & operation of Fire pump house at new MH (having Main electric dirven pump of cap. 2850 LPM at 70 mtr head, 75 HP-01, Diesel Engine pump set of cap. 2850 LPM at 70 mtr head - 01, Jockey Pump of capacity 180 LPM at 70 mtr Head, 15 HP - 01 No) including Sunday & holiday complete all as specified and directed The following staff to be employed for the manning and operation of Fire Pump house:-
FGM 01 in 02 shift i.e. each shift of 08 hrs, shift timings will be as directed by Engineer-in-charge. (02 FGM per day)
NOTES (for serial item No. 2.00 TO 4.00) :- (i) Minimum wages as per Minimum Wages Act 1948 shall be paid to the tradesmen by the contractor. Proper wages paid record shall be maintained and submitted to Engineer-in-charge. Contractor shall supply log book, attendance register, payment register and operator shall be responsible to maintain the log book daily and submit to department duly completed along with attendance register and payment record register at the end of every month. All provisions as laid down in Contract Labour Act 1970 such as payment of minimum fair wages, working conditions, etc shall be complied with by the contractor. (ii) The contractor shall quote the rates for deputing man power and reliever arrangement as per labour commissioners rule requirement of labours as given in BoQ. Penal recovery at the rate of Rs 500/- per shift per trades man will be effected for the less number of tradesman employed on any working day. (iii) The staff employed by the contractor shall be responsible for carrying out cleaning of all panel boards, internal and external portions of pump house in a presentable condition for inspection at all time. If required, the contractor will employ more manpower to carry out the duties assigned above and no extra payment will be made on this account. Rates quoted by him will be deemed to be included, complete all as directed and specified by EIC. (iv) The contractor shall carry out routine check and maintain check sheet daily/ weekly/ monthly all as per manufacturers instructions/SOP and upkeep the installation, rectify normal troubleshootings and will submitt daily updated logsheet at the end of every month in the AGE E/M office. (v) Verification of antecedents of Contractors representatives/ trained personnel/labour deployed at site in connection with execution of work under the contract, as per security requirement of User Unit/installation shall be the responsibility of the contractor and all expenses in connection with verification of antecedents by Police Authority/security Agency shall be borne by the contractor. (vi) Qualification :- FGM :-The contractor shall provide the services of trained personnel i.e. ITI qualified (Disel Mechanic / Fitter/ Operator trade as per requirement of Engineer-in-charge) with at least 01 (one) year experience in the relevant field OR matriculate with atleast 03 (three) years experience in the relevant field and requiste certificates in this regard shall be submitted to Engineer-in-charge for their approval before commencement of work and get verification with orignal certificates.
NOTES (for serial item No.2.00 TO 4.00) (Contd/-):- (vii) Staff engaged for maintenance/operation of the installation will not leave the installation under any circumstances, if during surprise check by representative of Deptt, maintenance staff found absent then penalty of Rs 500/- per shift per trades man will be imposed on the contractor. (viii) Contractor will provide stationary for maintaining Daily log sheet of Pump house alongwith attendance sheet. (ix) All tradesmen will be in uniform with name plate/badge as approved by GE, cost of these is deemed to be included in the unit rate quoted by the contractor. (x) POL, Lubricants, etc if required shall be issued by the department under Schedule 'B' and it will be the contractor’s responsibility for filling oil / lubricant into fuel tank of DG sets,etc. Necessary intimation & collection will be the responsibility of contractor. Empty containers shall be returned by the contractor to the MES store yard. Non issue will not require amenment to CA. (xi) All tradesmen shall be individually life insured under group insurance scheme or any other scheme for minimum of Rs.1.00 Lakh. Insurance certifcate in this regard shall be submitted to Enginer-in-charge before commencement of work. (xii) The rate of petty sotres such as nuts & bolts, washers, coupling rubber star packing, gland rope, grease, etc are included in quoted rates. (xiii) The contractor shall provide T & P items to the employers like gland packing, wrenches of different sizes, screw driver set & torch lights, etc. (xiv) Contractor shall provide mobile phone (for keeping liason with the executive staff), rechargeable torch, rain coat (in rainy season), conveyance, etc with the operator/tradesman. The quoted rates are deemed to include for the same.
SHIV SHANKAR MISHRA
SUNIL ENTERPRISE
CREATIVE CONSTRUCTION
M/S MEWALAL UPADHYAY
Vinayak Trading House
M/s VIKAS TRADERS
POONAM ELECTRIC INDUSTRY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .