Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹3.0 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.0 Cr+₹4,000 (0.01%)Rejected-Finance G1 12 INDEXEL ENGINEERING ROAD NO 4 I P I A KOTA KOTA RAJASTHAN 324005 | KOTA | RAJASTHAN | 324005 | ₹3.0 Cr+₹4,000 (0.01%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹3.1 Cr+₹14.1 L (4.77%)Rejected-Finance 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | ₹3.1 Cr+₹14.1 L (4.77%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹3.2 Cr+₹24.1 L (8.16%)Rejected-Finance | ₹3.2 Cr+₹24.1 L (8.16%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹7.1 Cr+₹4.1 Cr (139.3%)Rejected-Finance | ₹7.1 Cr+₹4.1 Cr (139.3%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | M/s Banwari Lal Suresh Kumar L5 | S.G.ENGINEERING COMPANY L4 | CIMCON SOFTWARE INDIA PVT. LTD. L3 | Shree Ayyappa Engineering L1 | Indexel Engineering Pvt LTd L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | PART-I
Design, Develop, Integrate and Commission SCADA System along with various analysing equipment for water supply System as indicated in the layout diagram enclosed and as per details attached at Table. The SCADA system shall comprise of following:- | 1 | Each Job | 7,00,00,000 ₹7,00,00,000 | 3,16,90,000 ₹3,16,90,000 | 3,04,78,648 ₹3,04,78,648 | 2,93,44,000 ₹2,93,44,000 | 2,93,00,000 ₹2,93,00,000 Lowest |
| 1.01(a) Master Control station with personal coumputer with latest processor and monitor of suitable size. (b) UPS with half an hour backup (c) Laser Printer (d) Server (e) Data Gateway (f) SCADA software which can be operated, programmed and modified by agencies other than developer (g) PLC/Microprocessor Controllers with indoor/outdoor applications for water sensing display, pump oprations with RTU/without RTU or Microprocessor controller and microprocessor transmitter. (h) Suitable communication system including payment of bills to telecom service provider. (j) Motorised butterfly valves (k) Pressure transmitters (l) Ultrasonic sensors/ Radio frequency sensors (m) Flow meters and switches (n) Air Release solendoid valves (o) Smart motor protection (p) Online residual Cholorine analyser (q) Level Censor (r) Interconnection motorise valves | ||||||||
| 1.02Notes : (i) Design of Communication System shall be done by the bidder. Cloud based server/ data storage/ communication shall not be used and only local server based system shall be designed. (ii) The cost of each item shall also be attached to arrive at pricing in case of some addition/reduction at site. (iii) Operating system, system software and programming shall not be interllectual property of any agency. (iv) The memory in the hard disk shall be suitable for six months data. The backup storage device/devices shall be provided for archiving of data more than six months old. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibility of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, leakages etc. Such repairs shall be carried out by MES. (vii) Operation and maintenance. Charges of operation for two years of defect liability period and maint and operation including comprehensive maintenance for eight years after defect liability period shall be included in the quoted rate. (viii) The SCADA system should have provision of both manual and automatic operation of installations. (ix) Third party inspection of the whole scheme and SCADA system for ensuring satisfactory and smooth functioning of SCADA system shall be carried out by Central Govt approved agency / firm before issuing the completion certificate to the contractor. | ||||||||
| 1.03Note for Maintenance and operations for 10 Years :- (a) Operate SCADA system during Defect Liability Period for two years after completion of work without manning ( Contractor to provide month wise breakdown details of data / information) including payment of bills by telecom service provider complete all as specified and directed by Engineer-in-Charge. (b) Operation and comprehensive mainenance of SCADA systems including cost of spares for 08 years post defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of data / information) including payment of bills by telecom service provider complete all as specified and directed by Engineer-in-Charge. | ||||||||
| 1.04NOTE :- COMPONENT OF PAYMENT FOR ITEM NO -1. (a) Sucessfully installation and operation of SCADA on completion of work :- 71.44 % of quoted rate of item No -1, Paymentto be regulated as per clause No 4 (a) of Particular Specification of (Water Supply SCADA) (b) 1st year under defect liability period after completion :- 1.44 % of quoted rate of item No -1. | ||||||||
| 1.05(c) 2nd year under defect liability period after completion :- 1.44 % of quoted rate of item No -1. (d) 1st year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. (e) 2nd year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. | ||||||||
| 1.06(f) 3rd year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. (g) 4th year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. (g) 5th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1. | ||||||||
| 1.07(f) 6th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1. (g) 7th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1. (g) 8th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1. | ||||||||
| 2.00 | PART-II
Supply & fix Non return valve (NRV) as per dia of rising main (i.e 150/100/80 mm) complete all as specified | 16 | Each | 40,000 ₹6,40,000 | 15,000 ₹2,40,000 | 28,000 ₹4,48,000 | 11,000 ₹1,76,000 Lowest | 14,000 ₹2,24,000 |
| 3.00Note : Tenderers may note that amount of credit Rs 12200.00 will be deducted from the total amount arrived, at the time of Acceptance of contract. | ||||||||
Tender Value
₹3.4 Cr
EMD Value
₹4.1 L
Closing Date
30 Apr 2025, 6:00 pmClosed
CE Bareilly zone
HQ CE Bareilly zone
PROVN OF WATER SUPPLY SCADA SYSTEM FOR 14 NOS OF PUMP HOUSES AT ROORKEE
2025_MES_702625_1
CEBZ/MRT/T-34 OF 2024-25
Open Tender
Civil Works
Item Rate
ROORKEE
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
GE ROORKEE
₹4.1 L
Yes
25 Aug 2025
26 Mar 2025
7 May 2025
26 Mar 2025
30 Apr 2025
16 Apr 2025
Amount
PART-I Design, Develop, Integrate and Commission SCADA System along with various analysing equipment for water supply System as indicated in the layout diagram enclosed and as per details attached at Table. The SCADA system shall comprise of following:-
(a) Master Control station with personal coumputer with latest processor and monitor of suitable size. (b) UPS with half an hour backup (c) Laser Printer (d) Server (e) Data Gateway (f) SCADA software which can be operated, programmed and modified by agencies other than developer (g) PLC/Microprocessor Controllers with indoor/outdoor applications for water sensing display, pump oprations with RTU/without RTU or Microprocessor controller and microprocessor transmitter. (h) Suitable communication system including payment of bills to telecom service provider. (j) Motorised butterfly valves (k) Pressure transmitters (l) Ultrasonic sensors/ Radio frequency sensors (m) Flow meters and switches (n) Air Release solendoid valves (o) Smart motor protection (p) Online residual Cholorine analyser (q) Level Censor (r) Interconnection motorise valves
Notes : (i) Design of Communication System shall be done by the bidder. Cloud based server/ data storage/ communication shall not be used and only local server based system shall be designed. (ii) The cost of each item shall also be attached to arrive at pricing in case of some addition/reduction at site. (iii) Operating system, system software and programming shall not be interllectual property of any agency. (iv) The memory in the hard disk shall be suitable for six months data. The backup storage device/devices shall be provided for archiving of data more than six months old. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibility of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, leakages etc. Such repairs shall be carried out by MES. (vii) Operation and maintenance. Charges of operation for two years of defect liability period and maint and operation including comprehensive maintenance for eight years after defect liability period shall be included in the quoted rate. (viii) The SCADA system should have provision of both manual and automatic operation of installations. (ix) Third party inspection of the whole scheme and SCADA system for ensuring satisfactory and smooth functioning of SCADA system shall be carried out by Central Govt approved agency / firm before issuing the completion certificate to the contractor.
Note for Maintenance and operations for 10 Years :- (a) Operate SCADA system during Defect Liability Period for two years after completion of work without manning ( Contractor to provide month wise breakdown details of data / information) including payment of bills by telecom service provider complete all as specified and directed by Engineer-in-Charge. (b) Operation and comprehensive mainenance of SCADA systems including cost of spares for 08 years post defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of data / information) including payment of bills by telecom service provider complete all as specified and directed by Engineer-in-Charge.
NOTE :- COMPONENT OF PAYMENT FOR ITEM NO -1. (a) Sucessfully installation and operation of SCADA on completion of work :- 71.44 % of quoted rate of item No -1, Paymentto be regulated as per clause No 4 (a) of Particular Specification of (Water Supply SCADA) (b) 1st year under defect liability period after completion :- 1.44 % of quoted rate of item No -1.
(c) 2nd year under defect liability period after completion :- 1.44 % of quoted rate of item No -1. (d) 1st year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. (e) 2nd year after defect liability period after completion :- 2.85 % of quoted rate of item No -1.
(f) 3rd year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. (g) 4th year after defect liability period after completion :- 2.85 % of quoted rate of item No -1. (g) 5th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1.
(f) 6th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1. (g) 7th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1. (g) 8th year after defect liability period after completion :- 3.57 % of quoted rate of item No -1.
PART-II Supply & fix Non return valve (NRV) as per dia of rising main (i.e 150/100/80 mm) complete all as specified
Note : Tenderers may note that amount of credit Rs 12200.00 will be deducted from the total amount arrived, at the time of Acceptance of contract.
Indexel Engineering Pvt LTd (BID ID -3289300)
CIMCON SOFTWARE INDIA PVT. LTD. (BID ID -3286525)
S.G.ENGINEERING COMPANY (BID ID -3286397)
M/s Banwari Lal Suresh Kumar (BID ID -3286020)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .