Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.4 LAccepted-AOC N A | PALWAL | HARYANA | 121004 | ₹23.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹23.7 LRejected-Finance R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹23.7 L | 2 | Rejected-Finance L2 |
| 3 | 3₹23.9 LRejected-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 172111 | ₹23.9 L | 3 | Rejected-Finance L3 |
| 4 | 4₹23.9 LRejected-Finance N A | FARIDABAD | HARYANA | 121004 | ₹23.9 L | 4 | Rejected-Finance L4 |
| 5 | Rejected-Technical N A | PALWAL | HARYANA | 121004 | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | M/S Anil Kumar L2 | Keshwa Nand Sharma L1 | Sukh Dev L4 | MUKHTIAR SINGH PATIYAL L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Jamthal Harnoda whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 23,68,150 ₹23.7 L | 23,41,000 ₹23.4 L | 23,94,850 ₹23.9 L | 23,89,750 ₹23.9 L |
| 2.00Civil works: 2 Nos pump house, 2 Nos sump well, 1No main storage tank,12 Nos sub storage tank. Rising main: 7064 Rmt (150mm dia) Distribution system: 15mm dia to 80mm dia =48.60Km Pumping machinery:1st stage: 4x75=300 HP, 2nd phase: 2x100=200 HP. No of main storage tanks: 3 Nos, Total working hours 90 per day : through , 15 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 570850 ). Pumping hours per day and energy consumptoin per day Unit. | |||||||
Tender Value
₹23.7 L
EMD Value
₹47,310
Closing Date
4 Oct 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O Resettlement colony Jamthal Harnoda and its adjoining villages in Tehsil Sadar District Bilaspur (SH Operation for pumping machinery and distribution system from main storage tank to different habitations for one year).
2025_HPIPH_115560_1
BLP-BLP-0736-NIT No. 7999-8098 Dated 22/05/2025
Open Tender
Civil Works
365 days
Sub Division Bilaspur Section Kandrour
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹47,310
27 Mar 2026
24 Sept 2025
4 Oct 2025
24 Sept 2025
4 Oct 2025
24 Sept 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Jamthal Harnoda whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Civil works: 2 Nos pump house, 2 Nos sump well, 1No main storage tank,12 Nos sub storage tank. Rising main: 7064 Rmt (150mm dia) Distribution system: 15mm dia to 80mm dia =48.60Km Pumping machinery:1st stage: 4x75=300 HP, 2nd phase: 2x100=200 HP. No of main storage tanks: 3 Nos, Total working hours 90 per day : through , 15 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 570850 ). Pumping hours per day and energy consumptoin per day Unit.
M/S Anil Kumar (BID ID -564409)
MUKHTIAR SINGH PATIYAL (BID ID -564423)
Sukh Dev (BID ID -564426)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid