Tender Value
₹27.2 L
EMD Value
₹54,500
Closing Date
7 Oct 2026, 9:00 am5d left
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O slab culvert at RD 0.690 and 0.825, P.L CC pavement in between Km. 0.000 to 0.825
2026_PWD_144635_1
PW/RMP/TA/2026-8069 dated 19.09.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,000
Yes
₹54,500
Yes
1 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
1 Oct 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 495 | Per Cubic metre. | 209.37 | ₹1,03,638.15 |
| 2 | Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 33.6 | Per Cubic meter | 628.95 | ₹21,132.72 |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement : 4 sand :8 Graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in breast and retaining walls etc. including carriage of material within all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. | 160.8 | Per cubic metre | 6,684.05 | ₹10,74,795.24 |
| 4 | Providing and laying mechanically mixed and vibrated cement concrete grade M-25 and curing completed excluding cost of form work and re-inforcement for reinforced concrete work in all floor height and carriage of material in all leads and lifts. including carriage of material within all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. Foundations, footings, basis of columns and the like and mass concrete including carriage of material within all leads and lifts and as per HP.PWD., specifications of 1990 volume-I and as per direction of Engineer-in-Charge | 158.4 | Per Cubic metre | 8,606.75 | ₹13,63,309.2 |
| 5 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 including carriage of material within all leads and lifts and other incidentals and as per directions of Engineer-in-charge. | 16.8 | Per Cubic meter | 9,080.42 | ₹1,52,551.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_215142.xls
BOQ • 6.97 MB
SBD.pdf
Tender Documents • 2.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .