| Sl No | Description | Qty | Unit | SELVAKUMAR CONSTRUCTIONS L1 | Bharathi Construction L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Renewal of the road from Kurumbapatty High School to R363 (Kalvarpatti pirivu) (R-352) | |||||
| 2.00 | Clearing the scrub jungle including all labour charges for burying and burning etc., complete | 2,700 | Sqm | 6 ₹16,200 | 8 ₹21,600 |
| 3.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 225 | Cum | 140 ₹31,500 | 142 ₹31,950 |
| 4.00 | Picking 5 cm to 10cm old BT surface and sectioning - 1 sq.m | 306.12 | Cum | 23 ₹7,040.76 | 25 ₹7,653 |
| 5.00 | Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc., complete | 200 | Cum | 341 ₹68,200 | 236 ₹47,200 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant etc., | 91.86 | Cum | 2,929 ₹2.7 L | 2,932 ₹2.7 L |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it | 918.35 | Cum | 88 ₹80,814.80 | 92 ₹84,488.20 |
| 8.00 | Providing and laying Tack coat using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material labour charges | 918.35 | Cum | 21 ₹19,285.35 | 25 ₹22,958.75 |
| 9.00 | Providing and laying Tack coat using 3 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material labour charges | 2,894.25 | Cum | 35 ₹1.0 L | 38 ₹1.1 L |
| 10.00 | BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II)
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and mivino th and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 40mm with mechanical paver to the specified
grades and cross sections etc., | 95.32 | Cum | 12,110 ₹11.5 L | 12,112 ₹11.5 L |
Tender Value
₹24.4 L
EMD Value
₹24,380
Closing Date
12 Feb 2026, 3:00 pmClosed
Block Development Officer(B.P)
Block Development Office, Aravakurichi
Renewal of the Road from Kurumbapatty High School to R363 (Kavarpati Privu)(R-352) Km 0/0-1/0
2026_RDTN_651472_1
TNRRP-2025-26
Open Tender
Civil Works - Roads
90 days
Aravakurichi Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹24,380
Yes
13 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
Name of the Work : Renewal of the road from Kurumbapatty High School to R363 (Kalvarpatti pirivu) (R-352)
Clearing the scrub jungle including all labour charges for burying and burning etc., complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Picking 5 cm to 10cm old BT surface and sectioning - 1 sq.m
Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it
Providing and laying Tack coat using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material labour charges
Providing and laying Tack coat using 3 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material labour charges
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and mivino th and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections etc.,
Provision for KM stone charges
Provision for HM stone charges
Towards cautionary sign board
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on Bituminous surface
Provision for Road studs
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TechnicalBid.pdf
Tender Documents • 0.95 MB
BOQ_781216.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid