| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical KOICKAL H POICKATTUSSERY CHENGAMANADU KERALA | ERNAKULAM | KERALA | 683572 | - | Rejected-Technical L2 |
Tender Value
₹5.2 L
EMD Value
₹12,916
Closing Date
19 Oct 2023, 3:00 pmClosed
AE
O/o The Assistant Executive Engineer LIDEW Subdivision Vypin Block Panchayath
VBP-139/2023-24 Construction of culvert and side protection Karuthala palam east round Pc Square- Starline road Ward 9 of Pallipuram GP
2023_LSGD_609116_1
01/AE/VBP/Quotation1/2023-24
Open Tender
Civil Works - Roads
Item Rate
90 days
VYPIN BLOCK PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹12,916
29 Dec 2023
6 Oct 2023
20 Oct 2023
6 Oct 2023
19 Oct 2023
6 Oct 2023
6 Oct 2023 - 19 Oct 2023
Amount
CULVERT
2.5.2.B:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (II) By Mechanical Means <br>(B) Reinforced Cement Concrete
2.5.1.B:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (I) By Manual Means <br> (B) Cement Concrete
OD47137/2023-2024:2022 :RING BUND Type II Putting up ring bund with earth fille gunny bags of top width .75m bottom width 1.5 m height 1.5 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
OD47139/2023-2024:Bailing out water using 5 HP engine and pump set including conveyance to site and erection ,cost of fuel,lubrication oil and other stores,pay of staff etc complete Modified 60.2.2
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
OD47385/2023-2024:DR packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc.complete as per direction of departmental officers at site
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> I. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5<br>R.C.C M 25
13.1.1.1:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 <br> I. R.C.C grade M 20 <br> (i) For nominal mix 1:2:4
13.3:Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
OD47265/2023-2024:Filling up low lying and waterlogged areas with local material/quarry muck spreading layers levelling the top at site and consolidation by ramming,etc complete for improving CBR of subgrade
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD47367/2023-2024:Dry rubble masonry without through/bond stone in foundation and superstructure including packing to compactness to lines and levels,cost and conveyance of all materials,labour charges etc complete up to3m height
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD47373/2023-2024:Random rubble masonry (without through stone) in cement mortar 1:6 complete as per drawing & technical specification including all cost and conveyance of materials, labour etc complete and as per the direction of Engineer-in-charge
3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
OD47396/2023-2024:Supplying and fixing name board as per the direction of departmental officers
ITTEERA K.I.
Bidder Name
ITTEERA K.I.
Benny V C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .