Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC GROUND FLOOR GANGA APARTMENT KOTHABARI NEW BANSHBARI MALDA | 73 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹2.6 L+₹359.92 (0.14%)Rejected-Finance BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | L2 | Rejected-Finance GREATER THAN L1 | |
| 3 | L3₹2.6 L+₹467.19 (0.18%)Rejected-Finance BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | L3 | Rejected-Finance GREATER THAN L1 | |
| 4 | L4₹2.6 L+₹538.69 (0.21%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L4 | Rejected-Finance GREATER THAN L1 |
Tender Value
₹2.7 L
EMD Value
₹5,365
Closing Date
8 Jul 2024, 2:00 pmClosed
AE,SMSD,PHE DTE
OFFICE OF THE ASSISTANT ENGINEER ,SILIGURI MECHANICAL SUB DIVISION ,PHE Dte.SILIGURI
Supply, delivery and carrying of chlorine gas of 900kg each capacity Tonner with testing of Toner for Jhankar Intermediate Pumping station and GLR-II under Siliguri Comprehensive W/S Scheme.
2024_PHED_698895_2
WBPHED/AE/SMSD/NIeT- 01 OF 2024-2025
Open Tender
Miscellaneous Works
Item Rate
180 days
Siliguri
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,365
Yes
21 Feb 2025
25 Jun 2024
10 Jul 2024
25 Jun 2024
8 Jul 2024
25 Jun 2024
Amount
Carrying charges of empty chlorine tonner of each capacity 900 Kg. from Jhankar Intermediate Pumping Station and GLR-II under Siliguri Comprehensive W/S Scheme to Durgapur Chemicals or other sources for filling liquid chlorine including loading unloading and detention charges. [ 1 trip shall carry 1 to 2 nos cylinders].
Filling charges of liquid chlorine to the empty cylinder of 900 kg each capacity from Durgapur Chemicals or other sources for 4 nos. X 900 Kg. Each = 3.6 MT (payment will be made as per actual mest)
Carrying charges of filled up chlorine cylinder of each capacity 900 kg from Durgapur Chemicals or other sources to Jhankar Intermediate Pumping Station and GLR-II under Siliguri Comprehensive W/S Scheme including loading & unloading and detention charges complete. [ 1 trip shall carry 1 to 2 nos cylinders].
Testing of empty tonner before filling as per ISS if required.
Charges for replacement of cylinder valve, cylinder nut, cylinder spindle, cylindrical cap and cylinder washer if required including painting complete as per direction of the EIC.
Make As per PHE approved vendor list.
Add GST @18%
Add Cess @1%
HANNAN BUILDERS PRIVATE LIMITED
NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD.
EASTERN INDIA SALES AND SERVICE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .