Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC PALATHINKAL BHOOTHATHANKETTU P O AE LSGD PALLARIMANGALAM GRAMA PANCHAYATHAI PALLARIMANGALAM | IDUKKI | KERALA | 685501 | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.9 L+₹1.2 L (5.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹33,470
Closing Date
5 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer, PWD roads Division Muvattu
Executive engineer, PWD roads Division Muvattupuzha
The proposed estimate includes works such as filling up potholes using 36mm,levelling coarse, leveling undulations , and 20mm thick Closed graded premix carpet etc.
2021_PWD_409959_1
PWD/2020-2021/17604/RDDnMVA
Open Tender
Civil Works - Roads
Item Rate
90 days
Vazhakulam Kothamangalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹33,470
Yes
22 Jun 2021
29 Jan 2021
8 Feb 2021
29 Jan 2021
5 Feb 2021
29 Jan 2021
60 days
Amount
road work
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.7.a : Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.5.a : Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od20322/2020_2021 : Providing, laying and rolling of close graded premix carpet of 20mm thickness composed of 11.2mm to .09mm (Morth M-041) aggregates premixed using viscosity grade bitumen (VG 30 @22kg of bitumen per 10sqm (MORTH 5.7.1 Type A) to required line, grade and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100KN capacity, finished to required level and grades :- By manual means
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
N.U Kunjumuhammed
Bidder Name
Liju Paul
N.U Kunjumuhammed
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582571.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .