Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63,340.36Accepted-AOC | L1 | Accepted-AOC accepted As per board resolution number 1/2 dated 3.11.2025 | |
| 2 | L2₹64,454.87+₹1,114.51 (1.76%)Rejected-AOC | L2 | Rejected-AOC REJECTED As per board resolution number 1/2 dated 3.11.2025 |
| Sl No | Description | Qty | Unit | MOHAMMED SANOOB VP L1 | CALICUT AIRPORT LCCS. LTD. L2 |
|---|---|---|---|---|---|
| 1.00Renovation | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 4.72 | cum | 330.41 ₹1,561.19 Lowest | 500 ₹2,362.5 |
| 1.00 | OD346526/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 4.2 | cum | 695.8 ₹2,922.36 Lowest | 695.8 ₹2,922.36 Lowest |
| 1.00 | OD325244/2025-2026:DRY RUBBLE MASONRY:- Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing in compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of the Departmental officers at the site | 13.65 | cum | 3,668.07 ₹50,069.16 Lowest | 3,668.07 ₹50,069.16 Lowest |
| 1.00 | OD346535/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site ( With departmental material) | 2.1 | cum | 1,576.07 ₹3,309.75 Lowest | 1,576.07 ₹3,309.75 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.39 | cum | 8,483.41 ₹3,342.46 Lowest | 8,483.41 ₹3,342.46 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1.57 | sqm | 354.69 ₹558.64 Lowest | 354.69 ₹558.64 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 5.4 | cum | 292 ₹1,576.8 Lowest | 350 ₹1,890 |
Tender Value
₹63,343
EMD Value
₹1,584
Closing Date
31 Oct 2025, 6:00 pmClosed
JASNA P T
The Assistant Engineer, LID EW Section ,Kalikavu Grama Panchayat
381/26 NEDUKKAL KUNNU DRINKING WATER PROJECT WELL WATER TANK RENOVATION
2025_LSGD_813524_17
04/TN/AE/LIDEW/KKV/25-26
Open Tender
Civil Works - Water Works
Item Rate
180 days
LIDEW SECTION KALIKAVU GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,584
Yes
21 Nov 2025
23 Oct 2025
3 Nov 2025
23 Oct 2025
31 Oct 2025
23 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_1361080.xls
BOQ • 0.30 MB
381.rar
Tender Documents • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .