| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | -22.22% | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹10.6 L (2.69%)Admitted-Finance | -20.13% | ₹4.1 Cr+₹10.6 L (2.69%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 Cr+₹53.6 L (13.5%)Admitted-Finance | -11.69% | ₹4.5 Cr+₹53.6 L (13.5%) | L3 | Admitted-Finance |
| 4 | L4₹4.5 Cr+₹57.1 L (14.4%)Admitted-Finance | -11.00% | ₹4.5 Cr+₹57.1 L (14.4%) | L4 | Admitted-Finance |
| 5 | L5₹4.6 Cr+₹61.2 L (15.5%)Admitted-Finance WH 47 OFFICE NO 01 MAYAPURI INDUSTRIAL AREA PHOASE 1 REWARI LINE MAYAPURI INDUSTRIAL AREA PHOASE 1 NEW DELHI | -10.20% | ₹4.6 Cr+₹61.2 L (15.5%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
22 Jun 2026, 6:30 pmClosed
DGM (M and C)
Bhubaneswar
Carrying out rerouting of 16 inch OD Paradip Hyderabad Pipeline by Horizontal Directional Drilling, Hot Tapping and associated works at ch. 408.10 KM under SERPL Vizag jurisdiction in Andhra Pradesh
2026_ERBBS_190081_1
9320C26A51
Open Tender
Civil Works
Works
180 days
As mentioned in NIT and Tender Document
Please refer Tender documents.
11 documents required · 11 mandatory
₹1.3 L
Yes
29 Jul 2026
1 Jun 2026
23 Jun 2026
1 Jun 2026
22 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | GST % for the tender
Please select the rate of GST in cell W13. Rate selected shall be applicable for the entire BoQ. | - | - | - | - |
| 10 | Mechanical works | - | - | - | - |
| 20 | HDD WORKS (OFC conduit to be paid separately) 16" in Normal Soil Text Part 1/2 Design, detailed engineering & installation of pipeline / pipeline & OFC conduit(paid separately) across rivers, NH, SH, Expressways , Railways, etc by HDD method. Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manp ower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following wor ks in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surv eys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculatio ns, preparation of all necessary construction drawings for approval of the Owner as per theprovisions of contract document, preparat ion of detailed construction method statement and design analysis.Taking delivery and transportation of Owner-supplied 3LPE coated p ipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for d efects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent posit ion.Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrange ment for pipeline stringing, launching etc. Carrying out repair of pipe defects, replacement in the case of non-repairable defects a nd repairing damages to pipe coating including defects/ damages occurring during transportation and handling. Pre-construction surve ys and collection of all necessary data. String preparation including repair of pipe and pipe coating defects, welding, non-destruct ive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the welds and re-testing etc....... continued. | - | - | - | - |
| 30 | HDD WORKS (OFC conduit to be paid separately) 16" in Normal Soil Text Part 2/2....in Continuation of previous....... Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Direction al Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings.Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline).(paid separately). Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carri er pipeline).(paid separately). Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pi peline string, as per the specifications, including repair of defects and retesting etc. Installation of the pipeline / pipeline and OFC conduit (paid separately) as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal direct ional drilling operation to the correct profile as per the approved drawings. Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). Carrying out post-installation coating survey as per approved procedure. Rest oration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. Transportation of surplus Owner-supplie d pipes to the designated stockpile location of the Owner. Preparation of as-built drawings and other records etc. All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. NOTE:The Contractor shall have the option for installa tion of 89 mm OFC conduit(paid separately) as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separ ate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. Installation of OFC conduit sha ll be paid separately under PART-B HDD Works. | - | - | - | - |
| 40 | HDD WORKS (OFC conduit to be paid separately) 16" in Normal Soil: | 320 | M | 16,678 | ₹53,36,960 |
| 50 | PART-B HDD WORKS Extra for HDD INSTALLATION of 89 mm OFC conduit (along with carrier pipe) 16 INCH in Normal Soil | 320 | M | 3,240 | ₹10,36,800 |
| 60 | EGP (Calliper survey): 16 " OD Carrying out Calliper survey for ascertaining the internal geometry of the installed pipeline sections including mobilization/ demob ilization of pigging tools, tackles,consumables, accessories and personnel by contractor at work site including magnetic pig, electr onic geometry pig, preparation and cleaning of the pipeline sections by running series of foam pigs for cleaning the line from debri s, water & making it dry for launching calliper pigs, running of magnetic pig for cleaning of ferrous residue, launching and receivi ng the electronic & standard calliper pigs, data retrieval, interpretation of data and submission of reports in the form acceptable to the Owner, rectification of defects observed from calliper survey (if HDD is executed by the same contractor), including supply o f all labour, materials, equipment & instruments, calliper pigs, fabrication of launching & receiving barrels, all complete as per s pecifications and directions of Site Engineer / Engineer-in-Charge. | 1 | LS | 2,72,218 | ₹2,72,218 |
| 70 | NITROGEN PURGING & OIL EVACUATION:16" OD Fixing of temporary header / facility at both ends of the old/new pipeline section, inserting the bi-di pig and carrying out product evacuation by nitrogen purging, as per specification and direction of Engineer-in-Charge including supply of all labour, materials, equipments, instruments, pigs, barr els etc. Complete in all respects. | 400 | M | 593 | ₹2,37,200 |
| 80 | TIE-IN & HOOK-UP 16" OD Carrying out tieing-in and hook-up of the installed HDD sections including laying of transition piping upto 12 m for hook-up with ex isting Mainline on either side of HDD crossing including all excavation/ trenching in all kinds of soil including rock,transportatio n of coated pipe from owner's stackyard, cutting of pipe, pre-testing of pipe sections before hook-up, making field bends out of pre -tested pipes (pipes shall be supplied by Owner) to match the site requirement, welding, carrying out 100% radiography, field joint coating, holiday detection, repair of damaged coating, backfilling and making through the pipeline etc. complete in all respects as per specifications and directions of Engineer-in-Charge. | 1 | EA | 1,92,233 | ₹1,92,233 |
| 90 | TRANSITION PIPE LAYING (>12 m length on both sides) 16" OD Text Part 1/2 Laying of Owner-supplied pre-coated mild steel line pipes, including arranging all additional land/construction corridor, beyond Own er's ROW, required for Contractor's storage, fabrication, access for construction site, movement of construction equipment etc., rec eiving and taking over Owner-supplied materials, handling, transportation etc. from Owner's issue point to work site, stringing alon g Right of Way (ROW)/ pipeline corridor, providing labour, equipment and supply of other inputs & materials/ consumables necessary t o perform and complete the work in all respects in accordance with the contract including, but not limited to, the following works:# Taking delivery and transportation of Owner-supplied coated pipes to the work site from designated Stockpile location, inspection of the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position;#Clearing and grading of ROW/ pipeline corridor, cutting of trees, vegetation etc. in cluding keeping record of trees cut, including de-watering etc.;#Stringing of pipes along ROW including providing straw bags/ soft p adding below pipe;#Trenching to all depths to maintain clear earth cover as per specification and to fit minimum bend radius, by exc avation in all kinds of terrain & soil, including stripping top soil to a depth of 30cm to the full anticipated width of the ditch a nd storing this material separately along the ROW to allow re-depositing of the same on top of the backfilled ditch (in cultivable a nd other areas specially designated by Owner);#Carrying out repair of pipe & coating defects for defects occurring after "taking ov er" of pipes from Owner, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation & handling;#Carrying out 100% radiographic inspection (by X-Ray) of all field weld joints a s per Specifications and Special Conditions of Contract (SCC) and destructive testing of one weld joint as per specification and dir ection of Site Engineer, including providing Crawler type Automatic X-Ray machine and/ or external X-Ray machine and all other requi site equipment, labour, supervision, materials, approved films, approved consumables, all facilities and personnel to process, devel op, examine and interpret radiographs (by qualified and experienced Radiography Inspector), providing all facilities to Owner's repr esentative(s) for examining radiographs and other tests as required, carrying out repair of weld-joints found defective, carrying ou t re-radiography and other tests as required on repaired joints, etc.;#Carrying out coating of all field weld joints, by specified c oating insulators, including supply of approved joint coating materials, providing all equipment, materials and consumables necessar y to carry out the job as per manufacturer's recommendation;#Carrying out holiday detection at specified voltage level corresponding - to coating type as per specifications, and repair of coating, if any;....... continued | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TechnicalSpecifications2_1. ML-HDD-Specification 2026-2.pdf
Additional Documents • 38.97 MB
TenderDocument9320C26A51.pdf
Tender Documents • 10.57 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
TechnicalSpecifications1_1. ML-HDD-Specification 2026-1.pdf
Additional Documents • 34.32 MB
TechnicalSpecifications3_10.Joint kit.pdf
Additional Documents • 0.24 MB
TechnicalSpecifications3_11.Electronic locator_RFID marker.pdf
Additional Documents • 0.41 MB
TechnicalSpecifications3_12.TPI List Rev.2.pdf
Additional Documents • 0.43 MB
TechnicalSpecifications3_13.SafetyPracticesDuringConstruction.pdf
Additional Documents • 0.69 MB
TechnicalSpecifications3_2. Hot_Tapping_Spec.pdf
Additional Documents • 0.63 MB
TechnicalSpecifications3_3. HOT TAPPING SPLIT TEE.pdf
Additional Documents • 0.22 MB
TechnicalSpecifications3_4. CivilSpecification.pdf
Additional Documents • 3.32 MB
TechnicalSpecifications3_5. TCP-HDD.pdf
Additional Documents • 9.44 MB
TechnicalSpecifications3_6. Mechanical_Material_Spec.pdf
Additional Documents • 1.19 MB
TechnicalSpecifications3_7. SPECIFICATIONS AND QAP FOR FITTINGS.pdf
Additional Documents • 1.24 MB
TechnicalSpecifications3_8. Warning tape.pdf
Additional Documents • 0.32 MB
TechnicalSpecifications3_9. HDPE.pdf
Additional Documents • 0.40 MB
TechnicalSpecifications3_Tech Specification_IOCL_MECH_STORAGE_HANDLING_PIPES R2.pdf
Additional Documents • 0.82 MB
BOQ_200359.xls
BOQ • 0.47 MB
Annexure_Commercial Annexure_10 Commercial Annexure.pdf
Additional Documents • 1.16 MB
Annexure_Commercial Annexure_Annexure_Commercial_R5_ProtectedR1.xls
Additional Documents • 0.48 MB
Annexure_Technical Annexures_Annexure-M-III.docx
Additional Documents • 0.02 MB
Annexure_Technical Annexures_Annexure-M-III.pdf
Additional Documents • 0.22 MB
Annexure_Technical Annexures_List of Technical Annexures.docx
Additional Documents • 0.01 MB
Annexure_Technical Annexures_List of Technical Annexures.pdf
Additional Documents • 0.13 MB
Annexure_Technical Annexures_T#1 (Technical Checklist).docx
Additional Documents • 0.02 MB
Annexure_Technical Annexures_T#1 (Technical Checklist).pdf
Additional Documents • 0.41 MB
Annexure_Technical Annexures_T#10 (Soil Investigation Report).pdf
Additional Documents • 1.41 MB
Annexure_Technical Annexures_T#11 (Indemnity Bond).pdf
Additional Documents • 0.10 MB
Annexure_Technical Annexures_T#12(A) 12(B) (Charted Engg_certificate).pdf
Additional Documents • 0.08 MB
Annexure_Technical Annexures_T#13 (Hindrance Register).pdf
Additional Documents • 0.06 MB
Annexure_Technical Annexures_T#14_List of Recommended Vendors Rev10.pdf
Additional Documents • 7.74 MB
Annexure_Technical Annexures_T#15 (Undertaking for transportation of pipes )-Revised.docx
Additional Documents • 0.03 MB
Annexure_Technical Annexures_T#2 (Experience).pdf
Additional Documents • 0.02 MB
Annexure_Technical Annexures_T#3 (Past Experience).pdf
Additional Documents • 0.02 MB
Annexure_Technical Annexures_T#5 (Approved list of vendors).pdf
Additional Documents • 1.09 MB
Annexure_Technical Annexures_T#6(A).docx
Additional Documents • 0.03 MB
Annexure_Technical Annexures_T#6(B).docx
Additional Documents • 0.03 MB
Annexure_Technical Annexures_T#7 (Rig details)_Rev.pdf
Additional Documents • 0.26 MB
Annexure_Technical Annexures_T#8 (Exception Deviation).pdf
Additional Documents • 0.05 MB
Annexure_Technical Annexures_T#9 (Tender Drawing).pdf
Additional Documents • 1.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .