Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-Finance LOCATION UTTARAKHAND UT | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹3.7 L+₹5,375.40 (1.47%)Rejected-Finance | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹3.9 L+₹20,924.40 (5.74%)Rejected-Finance HOUSE NO F 452 3 LINE NO 09 RAJENDER NAGAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | L3 | Rejected-Finance Third lowest bidder |
| Sl No | Description | Qty | Unit | AJAY KUMAR CHAUHAN L1 | Hari Om Sai Electricals L2 | Shri Ganesh Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY | ||||||
| 2.00 | Stay clamp for SP23 double ended | 23 | Nos | 279 ₹6,417 Lowest | 280 ₹6,440 | 290 ₹6,670 |
| 3.00 | E-clamp | 33 | Nos | 269 ₹8,877 Lowest | 270 ₹8,910 | 270 ₹8,910 |
| 4.00 | LT clamp with N&B ST pole SP-21 | 48 | Nos | 194 ₹9,312 Lowest | 195 ₹9,360 | 200 ₹9,600 |
| 5.00 | Stay clamp for SP-21 with N&B | 12 | Nos | 203 ₹2,436 Lowest | 205 ₹2,460 | 206 ₹2,472 |
| 6.00 | Earth wire clamp for SP-23 with N&B | 12 | Nos | 274 ₹3,288 Lowest | 275 ₹3,300 | 280 ₹3,360 |
| 7.00 | PP & clamp with N&B ST pole SP-23 | 23 | Nos | 223 ₹5,129 Lowest | 225 ₹5,175 | 230 ₹5,290 |
| 8.00 | Shackle insulator 75x90mm with nuts & Bolts | 48 | Nos | 59 ₹2,832 Lowest | 60 ₹2,880 | 65 ₹3,120 |
| 9.00 | Stay Insulator | 12 | Nos | 23 ₹276 Lowest | 24 ₹288 | 25 ₹300 |
| 10.00 | Bracing clamp top for SP-23 with N&B | 22 | Nos | 249 ₹5,478 Lowest | 250 ₹5,500 | 255 ₹5,610 |
Tender Value
₹3.7 L
EMD Value
₹11,500
Closing Date
4 Dec 2024, 4:00 pmClosed
EE
EDD,Ranikhet
Construction of 11 KV line installation of TF at Vill- Suturgon for voltage improvement under assembly area Someshwar under head Capital
2024_UPCL9_77216_2
13/2024-25EDD(R)
Open Tender
Electrical Works
Item Wise
30 days
Dwarahat
Please refer Tender documents.
2 documents required · 2 mandatory
₹295
MD UPCL
₹11,500
6 Jun 2026
16 Nov 2024
5 Dec 2024
16 Nov 2024
4 Dec 2024
16 Nov 2024
Amount
SUPPLY
Stay clamp for SP23 double ended
E-clamp
LT clamp with N&B ST pole SP-21
Stay clamp for SP-21 with N&B
Earth wire clamp for SP-23 with N&B
PP & clamp with N&B ST pole SP-23
Shackle insulator 75x90mm with nuts & Bolts
Stay Insulator
Bracing clamp top for SP-23 with N&B
Bracing clamp bottom for SP-23 with N&B
LABOUR CHARGE
Fabrication of steel
Excavation of pit for stay set
Errection of 11KV stay set
Grouting of stay set
Excavation of pit for pole
Errection of single SP-21 pole
Errection of single SP-23 pole
Errection of SP-23 double pole
Grouting of pole
Muffing of poles
Installation of 25 KVA DTR on pole structure
Fixing of TPMO
Fixing of fuse set
Fixing of lightning arrester
Laying of Rabbit conductor in HT line
Laying of 3P 4W LT line (weasel)
Cartage of SP-21/23 pole, 100-150 Km
Cartage of petty material, 100-150 Km
Cartage of 16/25 KVA DTR 100-150 km
Head load cartage of SP-21/23 pole (1-3km)
Head load cartage of material (1-3 km)
Head load Cartage of 25 KVA DTR (1-3 km)
Hari Om Sai Electricals (BID ID -346667)
Shri Ganesh Enterprises (BID ID -348194)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .