Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC 120 THAMBU CHETTY STREET AKBAR TOWER 3RD FLOOR CHENNAI 600 001 | CHENNAI | TAMIL NADU | 600001 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹34 L+₹18.0 L (112.6%)Rejected-Finance G 11 FIRST FLOOR SECTOR 11 NOIDA 201301 UTTAR PRADESH INDIA | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹79.5 L+₹63.5 L (397.2%)Rejected-Finance M SQUARE MILLENIUM PLAZA JUDGES BUNGALOWS ROAD VASTRAPUR AHMEDABAD GUJARAT | AHMEDABAD | AHMEDABAD | GUJARAT | 380015 | L3 | Rejected-Finance L3 Bidder. | |
| 4 | L4₹92.5 L+₹76.5 L (478.4%)Rejected-Finance 133 14 RADHIKA BHAWAN GHADI CHOWK VIJAY NAGAR JABALPUR 482002 | JABALPUR | JABALPUR | MADHYA PRADESH | 482002 | L4 | Rejected-Finance L4 Bidder | |
| 5 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | Rejected-Technical Does not qualify in minimum qualification criteria as per Bid Document. |
Tender Value
Refer Docs
Closing Date
7 Feb 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE and BM BB, Samal
O.O the CE and BM Brahmani Basin, Samal, At.PO-Samal Barrage Township, Samal, Dist-Angul
Appointment of Third Party Inspection Agency TPIA for implementation of UGPL system to the command area of Manjore Irrigation Project, Athmallik in Angul District of Odisha on EPC Turn Key Basis
2022_CEBBS_75828_2
CBBBS-MID-10/2021-22
National Competitive Bid
Miscellaneous Services
Turn-key
365 days
Athmallik
3 documents required · 3 mandatory
₹6,000
Exempted
3 Aug 2022
15 Jan 2022
8 Feb 2022
15 Jan 2022
7 Feb 2022
15 Jan 2022
15 Jan 2022 - 21 Jan 2022
180 days
Consultancy charges for QC/QA Planning& getting approval from Chief Engineer & Basin Manager, Brahmani Basin, Samal inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-despatch stage, checking of materials & equipment delivered by the EPC contractor at site/store including site inspection and checking of materials and equipment used as per design & specification approved by the Chief Engineer & Basin Manager, Brahmani Basin, Samal and submitting the final report for 2013.5 Ha. of canal network, 2013.5 Ha. of CAD and micro irrigation for 201.35 Ha. including submission of Final Report.
Multi Mantech International Pvt. Ltd.
TUV SUD South Asia Pvt. Ltd.
DR AMIN CONTROLLERS PVT LTD
stage.html
html • 0.06 MB
technical_392134.pdf
PDF • 0.69 MB
techsummary_392134.pdf
PDF • 0.68 MB
finance_392134.pdf
PDF • 0.46 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_392134.pdf
PDF • 1.20 MB
AgtTPIA.pdf
PDF • 0.56 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .