Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.3 LAdmitted-Finance | -18.60% | ₹75.3 L | L1 | Admitted-Finance |
| 2 | L2₹77.8 L+₹2.5 L (3.37%)Admitted-Finance | -15.86% | ₹77.8 L+₹2.5 L (3.37%) | L2 | Admitted-Finance |
| 3 | L3₹86.3 L+₹11.0 L (14.7%)Admitted-Finance | -6.66% | ₹86.3 L+₹11.0 L (14.7%) | L3 | Admitted-Finance |
| 4 | L4₹87.7 L+₹12.5 L (16.6%)Admitted-Finance | -5.11% | ₹87.7 L+₹12.5 L (16.6%) | L4 | Admitted-Finance |
| 5 | L5₹88.3 L+₹13.0 L (17.3%)Admitted-Finance MASTAN DHARA BAFLAIZ TEHSIL SURANKOTE DISTRICT POONCH JAMMU AND KASHMIR | SURANKOTE | POONCH | JAMMU AND KASHMIR | -4.55% | ₹88.3 L+₹13.0 L (17.3%) | L5 | Admitted-Finance |
Tender Value
₹92.5 L
EMD Value
₹1.8 L
Closing Date
16 Jan 2026, 4:00 pmClosed
Executive Engineer PWD R and B Division Thanamandi
Executive Engineer PWD R and B Division Thanamandi
Construction of Link road from Atote to Manda 6th call
2026_PWDJK_299972_2
NIT No 81 of 2026 27 Dated 06 01 2026
Open Tender
Civil Works
Percentage
60 days
Thanamandi
Construction of Link road from Atote to Manda 6th call
3 documents required · 3 mandatory
₹1,500
Executive Engineer PWD R and B Division Thanamandi
₹1.8 L
21 Jan 2026
6 Jan 2026
17 Jan 2026
6 Jan 2026
16 Jan 2026
6 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) in average fixed classification as, 90% All kind of soil,10% Soft Rock (Required blasting ) including disposal of surplus, excavated earth as directed by engineer- in-charge at site for safe disposal of same without damaging private/public property and all required leads/lifts and carriage. (Complete job)
Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Stone filling hand packed in horizontal on level including cost of stones.
Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete Foundations, footings, bases of columns
Retaning walls. return walls. walls (any thickness) including attached pilasters.buttresses. plinth and strmg courses fillets etc
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25
Supplying and stacking of graded stone aggregate at site of size range 63mm to 45mm .(excluding carriages)
Supplying and stacking of graded stone aggregate at site of size range 53mm to 22.4mm .(excluding carriages)
Supplying and stacking of stone screenings/ chippings at site excluding carriage. 13.20mm and 11.20mm nominal size)
Laying water bound macadam with specified stone aggregate stone screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. complete.
Base course with 63mm to 45mm size,
Base course with 53mm to 22.4mm size,
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. 41000 mm dia. R.C.C. pipe (laying by manual/mechanical means) complete. Non- pressure NP-3 class (Medium duty) R.C.C. pipes
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
Sand for an average distance of 155 kms by M.T
Stone aggregate below 40 mm nominal size for an average distance 35 kms by M.T
Stone for an average distance 10 km by M.T
Stone aggregate 63mm to 45mm size for an average distance of 35 kms by M.T
Stone aggregate 53mm to 22.4mm size for an average distance of 35 kms by M.T
Stone Screening 13.20mm nominal size for an average distance of 35 Km by M.T
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_973296.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .