Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
3 Aug 2026, 5:00 pmClosed
Durgadatta Rautaray (Assistant Manager-Contract & Procurement)
Hiring of Utility Vehicles for Production Sites & GEL Warehouse
323838
GEL/ADM/Hiring Utility Vehicles/2026-27/639
Open
Services
Works
Gandhinagar
2 documents required · 2 mandatory
₹96,000
14 Jul 2026
14 Jul 2026
14 Jul 2026
3 Aug 2026
14 Jul 2026
Section – V : Model Contract & General Terms and Conditions
Attachment 1: Acknowledgement
Attachment 2: Proforma confirming No exceptions deviation taken
Attachment 3: Bid Bond format (Bid Bond Exemption available)
Attachment 4: Performance Bank Guarantee
Attachment 5: List of Banks for providing Bank Guarantee
Attachment 6: Bid Qualification Criteria (Bidder’s Eligibility Criteria, Technical Bid
Evaluation Criteria and Commercial Evaluation Criteria)
- Exhibit-A: Vendor Registration Form (for new vendors)
- Exhibit B: Self- Declaration Cum Undertaking that the Bidder shall not
be on holiday list/ black-listed by GEL or any of the Group
Companies of GEL.
- Exhibit C: Checklist with Details for Submission of Documents for Bid
Evaluation Criteria.
- Exhibit D: Self-Declaration Cum Undertaking
- Exhibit E: Self-Declaration and Conformation.
Annexure 1: Cut-Out Slip for Bid Bond
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 4 of
SECTION – I: INVITATION TO BIDDERS
Gujarat Energy Limited
Gujarat Energy Bhavan, 3rd Floor, Behind Udyog Bhavan, Sector-11, Gandhinagar - 382
REQUEST FOR QUOTATION (“TENDER DOCUMENT” or “BID”)
Gujarat Energy Limited (hereinafter referred to as “GEL) as an Operator in onshore Blocks namely: CB-
ONN-2000/1 (Ahmedabad Block Old & RFPSC), CB-ON/2 (Tarapur Block Old & RFPSC), CB-ONN-2002/3
(Sanand Miroli Block) and CB-ONN-2003/2 (Ankleshwar), in Gujarat, under the Production Sharing
Contract (PSC) with the Government of India. GEL on behalf of the consortium members of the above-
mentioned onshore block respectfully solicits your Bid for Hiring of Utility Vehicles for Production
Sites & GEL Warehouse in CB-ONN-2000/1, CB-ON/2 (Old & RFPSC), CB-ONN-2002/3 and CB-ONN-
2003/2 Blocks in Gujarat.
Outlined hereinafter, is a comprehensive Bid package that you are requested to go through carefully. Your
bid must be in compliance with the requirements, specifications, and other applicable attachments,
including GEL’s terms and conditions. Exceptions/deviations pertaining to any of the above must be
clearly asked through pre-bid clarification from GEL. No exceptions/deviations, including those
pertaining to Clauses affecting prices shall be entertained. In case of no exceptions-deviations to the
tender terms, Bidders must submit the “No Exceptions Deviation Form (Attachment-2) duly stamped and
signed” confirming unconditional acceptance to the terms and conditions of the Tender document.
Evaluation of Bids for awarding the contract, while weighting price substantially, will be based on the
most advantageous offer reflecting a combination of price, quality of equipment and personnel,
acceptable delivery, warranty, service, and a commitment to ensure on-time delivery and quality service.
GEL reserves the right to cancel the tender process, abandon the supply/services, or issue another tender
for identical or similar supply/services or, to reject or accept, in whole or in part, any Bid, waive
formalities in the bidding process, or to negotiate Contract terms with any individual firm when such is
deemed by GEL to be in its best interest. GEL will be under no obligations to provide reasons for accepting
or rejecting a Bid.
The Bidders Response Acknowledgment Form (as indicated in Attachment-1) must be completed and
returned email transmission / Scanned copy within two (2) working days of receipt of Bid package. This
is to alert GEL about the total number of expected responses, and to ensure that Bidders received the Bid
package. If a Bidder does not intend to submit a Bid he should so state in the Bidders Response
Acknowledgment (see Attachment-1).
Tender Fee: NO TENDER FEE.
Bid Bond: Bidders are required to furnish Bid Bond for each Part for an amount / exemption as
mentioned in Attachment-6 (bid qualification criteria). Bid Bond is required to be furnished as per
attached format, Attachment 3. Bid Bond shall be returned to all bidders after one month of completion
of the tendering process.
Tender, pre-bid clarifications/corrigendum and other Tender related information shall be uploaded on
the website as well as on (n)procure portal on a regular basis. Bidders are required to refer to our
website www.GELgroup.com on a regular basis for this tender.
Non-compliance with the bidding instructions, except as permitted by the Bid and/or late arrival of your
Bid shall result in your Bid not being considered.
Sincerely Yours,
for Gujarat Energy Limited
Mr. Amitabh Ranjan - Sr. VP (C&P/E&C/M&L)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 5 of
INSTRUCTIONS TO THE BIDDERS
2.1 General Instructions
2.1.1 Transfer of Bidding Document: The Bidding document is not transferable.
2.1.2 Cost of Bidding: The Bidder shall bear all costs associated with the preparation and submission
of its bid, and GEL will in no case be responsible or liable for those costs, regardless of the
conduct or outcome of the bidding process.
2.1.3 Validity of bid shall be 180 days from the bid closing date.
2.1.4 Language and signing of Bid: The bid prepared by the bidder and all correspondence and
documents relating to the bid exchanged between the Bidder and GEL shall be written in
English Language only. Supporting documents and printed literature furnished by the Bidder
may be in another language provided they are accompanied by the accurate translation of the
relevant passage in English, in which case for purpose of interpretation of the bid, the
translation shall prevail.
2.1.5 GEL retains the right to modify the terms of the Bid, Model Contract or any of the
sections/attachments/formats at any time prior to the Bid Due date.
2.1.6 Bidders must review the Technical Specifications, Scope Document and ensure that the
equipment/materials/ services being offered are as per specifications and scope prescribed in
this document GEL retains the right to modify the terms of the Bid, Model contract or any of the
sections/attachments/formats at any time. Bidder must review the Contract / Terms &
Conditions before providing details on the Commercial Part as specified in this tender
document. Bidders shall be deemed to have understood and taken into account all the terms
and conditions prescribed in the contract.
2.1.7 Bidder must review the Contract before providing details on the Commercial Part as specified
in this TENDER DOCUMENT. Bidders shall be deemed to have understood and taken into account
all the terms and conditions prescribed in the contract. Any clarifications must be clarified
through pre-bid clarification from GEL. No exceptions/deviations, including those pertaining to
Clauses affecting prices shall be entertained. Bidders must submit the “No Exceptions Deviation
Form (Attachment-2) duly stamped and signed”. In case of non-submission of Attachment–2,
it is understood that bidder has not proposed any exception/deviation and has unconditionally
accepted and agreed to comply with all terms and conditions of the tender without variation or
2.1.8 Bids from agent / agent’s representatives will not be accepted, unless backed by valid Letter of
2.1.9 Bids submitted by fax will summarily be rejected.
2.1.10 Once a Bid is submitted no changes will be permitted to be made by the Bidder except in
relation to clarifications sought by GEL on the Bid.
2.1.11 Bidders should indicate in their proposal the legal entity which will be executing the Contract.
The Bid shall be duly signed and sealed by the Executive Officer / or the Authorized
Representative of the Bidder’s Organization/Company.
2.2 Specific Instructions
2.2.1 The Bidders Response Acknowledgment Form (as indicated in Attachment -1) must be
completed and returned via Email within three (03) working days of receipt of Bid package.
This is to alert GEL about the total number of expected responses.
2.2.2 Bidders will submit the Bid form in its entirety and no alterations will be made to the form or
the wording therein. The Bid form will be signed by a duly Authorized Officer or Representative
of the Company/Organization.
2.2.3 Bidders must seek clarifications to the any query with respect to the tender document at least
5 (five) days before the Bid Due Date.
2.2.4 The Bidders shall make available the services/material/equipment as specified in the Scope of
Work of this Tender.
2.2.5 The proposal must be filled in completely and all pricing shown as required. It shall be inclusive
of the cost of all associated aspects of the supply/services including but not limited to Testing,
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 6 of
Witnessed Inspections, Painting, Documentation, Drawings, Data. Certification, Manuals,
Instructions, Preservation and Protection Materials, or as called for in the Technical
specification and Scope document etc.
2.3 Submitting of Bids
2.3.1 Bids shall be submitted on (n)Procure portal as per terms and conditions of this tender
• Bidder is required to submit all documents for their qualification of BEC mentioned in this
tender document (Attachment – 6) and upload the same along with bid on (n)Procure portal.
2.3.2 A two-bid system shall be followed, i.e.
1. “Technical Unpriced Bid” and
2. “Commercial Price Bid”.
The bids have to be submitted online on (n)Procure portal as per clause-2.3.1 of ‘Instructions to
Bidders”. It is to be noted by the bidder that GEL shall accept bids through (n)Procure portal
only. No physical bid shall be accepted.
SUBMITTING OF BIDS MUST BE ONLY ONLINE THROUGH ONLINE THROUGH THE PORTAL OF –
(n) CODE SOLUTIONS, A Division of Gujarat Narmada Valley Fertilizer Company Ltd.
Email: [email protected]
Web: https://tender.nprocure.com
You may also contact Representative of: (n) Code Solutions: Toll Free No.7359 021 663,
023 1663 for any assistance for online submission of the Bid.
Contact details: (Grievances), Email: [email protected]
NOTE: BIDDERS WHO ARE NOT REGISTERED WITH (N) CODE SOLUTIONS MUST
IMMEDIATELY VISIT THEIR WEBSITE: https://www.tender.nprocure.com AND
UNDERSTAND THE PROCESS & TIME REQUIRED TO REGISTER AND IMMEDIATELY
PROCEED TO REGISTER TO ENABLE THEM TO TIMELY SUBMIT THEIR BIDS.
BIDS SUBMITTED ONLINE ON THE PORTAL OF (N) CODE SOLUTIONS SHALL ONLY BE
Only Bid Bond, Demand Draft, Bank Guarantee, Authorization letter can be submitted in sealed
envelopes in original on or before the due date.
2.3.3 Submission of Bid Bond:
- Bidder can exercise an option to submit the Bid Bond to GEL’s account by RTGS as per
details in Attachment-6 Bid Qualification Criteria attached hereto:
Account Name GEL CB-ONN 2000/1 AHMEDABAD JV ACCOUNT
IFSC code HDFC0000006
Account Type Current
Name of the Bank HDFC Bank
- Bank charges or any other charges if any shall be payable and borne by Bidder only.
- Bidder to submit Bid Bond and the details of the transactions to be submitted by mail to
Emails ID: [email protected] [email protected] and copy to
[email protected]. Bidder is also required to upload the copies of transactions on
(n)Procure portal while submitting their technical bids.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 7 of
- If bidder opt for submitting Bid Bond by mode of Demand Draft / Bid Bond Bank Guarantee
format then physical original of the same to be couriered to the GEL office address as
mentioned in Annexure-I, before the due date & time and the copies of same with details
are also required to be uploaded in the Technical Bid, on the (n)Procure portal. Bidder is
required to inform through email about the details of Bid Bond.
- If a Bidder does not intend to submit a Bid, he should so state in the Bidders Response
Acknowledgment (see attachment-1). The Bid Bond, without prejudice to any other
available remedies, shall be forfeited if:
a) The Bid is revoked during its validity period or;
b) The prices are changed unilaterally by the Bidder after the Bid opening and during
validity of the Bid or,
c) The Bidder do not follow the instruction given in this tender document or,
d) GEL accepts the Bidder's Bid and the Bidder refuses to accept the Work Order / Letter
of Award (LOA) or fails to enter into the Contract after the Work Order / LOA is issued
to such Bidder or,
e) The successful Bidder fails to submit Performance Bank Guarantee within the specified
period in accordance with the format provided in the Tender/Inquiry document; or
f) Seeks Variation or modification to the agreed terms and conditions or,
g) Tries to influence GEL on bid evaluation, bid comparison or decision to award the
Exemption of Bid Bond:
- BIDDER(s) eligible for exemption from payment of bid bond, as per Government of Gujarat
rules, shall submit any of the below mentioned certificate/ proof/ document, valid as on the
last date of bid submission, to substantiate the eligibility for exemption along with their bid
within the bid submission deadline:
- Micro, Cottage and Small Enterprise having a registration number under -
• Central Store Purchase Organization (CSPO) or
• National Small Industries Corporation (NSIC)
• Udyam Registration
• Director General of Supply and Disposal
- Any other specific type of firms exempted as per the Procurement Policy of Government of
- Exemption cannot be availed by:
• Firms registered as ‘Medium’ Enterprise under the Ministry of MSME (as per
Udyam registration)
• Traders/ distributors/ sole agent.
2.3.4 The “Technical Un-priced Bid” of the Bidder along with Bid Bond will be opened and shall be
evaluated first. If the offer is technically acceptable; has provisions or acceptable alternatives
to the requirements specified in the Tender; and conforms to other non-commercial
requirement as may be decided by GEL, then the “Commercial Priced Bid” will be opened and
evaluated further.
2.3.5 In the “Technical Unpriced Bid”, the bidder is required to submit upload all the information /
documents as per the “Bid Qualification Criteria” & its exhibits (Attachment – 6) which would
include compliance with Technical Specifications, and all Price information should be left blank.
The Commercial part should be a comprehensive package, which should include all Price
2.3.6 Bidder must review the Contract before providing details on the Commercial Part as specified
in this TENDER DOCUMENT. Bidders shall be deemed to have understood and taken into
account all the terms and conditions prescribed in the contract. Any clarifications must be
sought through pre-bid clarification from GEL. No exceptions/deviations, including those
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 8 of
pertaining to Clauses affecting prices shall be entertained. Bidders must submit the “No
Exceptions Deviation Form (Attachment-2) duly stamped and signed”. In case of non-
submission of Attachment–2, it is understood that bidder has not proposed any
exception/deviation and has unconditionally accepted and agreed to comply with all terms and
conditions of the tender without variation or modification.
2.3.7 Deadline for Submission of Bids
Envelope super scribed with Annexure -1 Cut-Out Slip for Bid Bond must be received by
GEL at the address specified therein not later than the prescribed due date and time in the
Invitation letter & Tender document.
Technical bid and Commercial bid to be uploaded in the entirety on the (n)Procure portal
before due date & time. (No physical documents to be submitted except for Bid Bond if
submitted in the form of DD & Bank Guarantee and authorization letter)
GEL may at its discretion extend the deadline for the submission of Bids by amending the
bidding documents in which case all rights and obligations of GEL & bidders previously
subject to the deadline will thereafter be subject to the deadline as extended.
2.3.8 Late Bids
GEL reserves the right to reject / accept the bid submitted after the deadline for submission of
bids prescribed by the GEL pursuant to Clause 2.3.7
2.3.9 Bid Validity Period
The Bidders quotation shall be valid for acceptance for a period of 180 (One Hundred and
eighty) days from the Bid Due Date. GEL, however reserves the right to seek such extensions
of the validity period as may be required. In the event of extension of the validity period of the
Bidders quotation, all other terms and conditions including the provisions relating to Bank
Guarantee shall also continue to be valid for the period of such extension and the Bidder shall
duly make efforts to ensure that this is complied with and shall bear any costs in this regard.
Further in the event of negotiations initiated by the Bidder the quotation should automatically
be extended for another 30 days or till the negotiations are completed and the Contract is
signed. This shall be an important criteria for qualification and bids not meeting with this
requirement may be summarily rejected.
2.4 Bid Bond and Technical proposal requirements: This stage shall contain the following
documents as mentioned in the tender:
Attachment 1: Acknowledgement
Attachment 2: Proforma confirming No exceptions deviation taken
Attachment 3: Bid Bond/ Exemption
For the amount & in the manner specified in the tender clause. in case of Bank Guarantee
(attachment -3) submitted as Bid Bond – BIDDER shall submit hard copy of original Bank
Guarantee) with related document for exemption or RTGS/ NEFT/ details.
In case of requesting bid bond exemption, bidder is required to provide the category in which
requested exemptions along with valid documentary evidence of exemption of bid bond
Exhibit A: Vendor registration form for New Vendor.
Exhibit B: Self- Declaration Cum Undertaking that the Bidder shall not be on holiday
list/ black-listed by GEL or any of the Group Companies of GEL.
- In case there is/are any on-going and/or Past Litigation/Arbitration of BIDDER with, either
GEL, or any of the GEL Group Companies, BIDDER shall attach/upload details/list of such
Past as well as on-going Litigation/Arbitration Proceedings, which shall include the case
no., date & year of filing litigation, the litigating parties, the subject matter of litigation,
order(s) passed in litigation, present status of litigation, and the value of claim, if any.
- Further, the bidder shall provide any additional details/clarifications as may be required
by GEL in this regard in time bound manner.
- In case any Partner/Director/Proprietor of BIDDER Firm is/are Relative(s) of or have any
financial or business transactions with any Employee(s) of GEL, the same shall be
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 9 of
notified/declared by the BIDDER. Further, in case such a conflict of interest arises post
completion of tendering process or during the tenure of the Contract, the same shall be
intimated to GEL.
Exhibit D: Self- Declaration Cum Undertaking regarding unconditional acceptance of the
entire scope of work.
Technical Stage shall be opened first on (n)Procure portal. In case of non-submission of
required documents in Technical stage, bidder shall not be qualified for next stage and GEL
reserves the right to dis-qualify such bidder.
The Bidder must adhere to the Technical Specification requirements as mentioned in the
Tender and state the same in the “Technical Unpriced Bid”. Bidders to direct all their technical
clarifications/requests, if any, at the email id [email protected] and copy to
[email protected] Within two days of issue date of Tender/Inquiry.
The Bidder shall submit in the Technical Bid - all the information / documents to support
the evaluation criteria as per specified in “Attachment-6” Bid Qualification Criteria. This
part shall not contain price
The Bidder shall confirm in its Bid proposal that it has sufficient experience and resources for
satisfactory completion of services / supply as per the Scope of work/supply, and that it will
commit the resources needed to carry out the services/supply in a timely, work-man like and
professional manner. The Bidder is to satisfy GEL regarding the Bidder’s capabilities and
experience by submitting the documents, certificates, supply records etc. as defined in the
Scope of work/supply, and as required under any clause in particular.
The Bidder shall indicate the manner in which it plans to monitor, co-ordinate, control cost and
schedule performance of the services / supply.
The location and description of Bidder’s facilities / base from where the Bidder plans to
coordinate work must be indicated and should be available for inspection by GEL (if required).
The Bidder shall ensure compliance with GEL’s insurance and Bank Guarantee requirements as
provided in this Tender/inquiry and proposed Contract.
UNPRICED PART “TECHNICAL BID” to be uploaded on (n)Procure portal only (No
physical Bids to be submitted)
2.5 Commercial Proposal Requirements.
2.5.1 Prices quoted shall be in Indian Rupees only.
2.5.2 Prices should be quoted in Price Bid conforming to the format provided therein. Prices quoted
in the bid shall be firm and binding for providing / supplying of agreed services / item /
quantity & providing services or any additional quantity requested by GEL from time to time
during the currency of the Contract and extension thereto from the date of signing of the
Contract. No price escalation shall be allowed on whatsoever grounds.
2.5.3 This part shall contain only price details and shall be as per the Format attached.
2.5.4 The commercial bid must be strictly in accordance with the Schedule of Rate and Format
contained in the Tender.
2.5.5 Price bids submitted in any other format and conditional price bids will not be considered for
evaluation. Prices quoted in the bid shall be firm and binding for the agreed Contract period
and extensions thereof.
2.5.6 Price bid is required to upload on (n)procure portal with break up as per given format.
2.5.7 The price quoted shall be an all-inclusive price for completing the SOW in its entirety and that
only GST would be extra.
PRICED PART “COMMERCIAL BID” to be uploaded on (n)Procure Portal (No physical Bids
to be submitted)
SCHEDULE OF RATES: THE BIDDER SHALL HAVE TO SUBMIT SCHEDULE OF RATES FOR
2.5.8 Performance Bank Guarantee: The successful bidder shall furnish to GEL a Performance Bank
Guarantee for 10% of the estimated Contract Value (including applicable GST) of the
Contract awarded. The Performance Bank Guarantee is required to be submitted within 21 days
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 10 of
of issue of the LOA/Contract, whichever is earlier. The Performance Bank Guarantee shall be in
the format (Attachment–4) provided in the Tender, from a scheduled Nationalized Bank in
India or any of the private sector Banks listed in the Attachment-5. Such guarantee shall not
be acceptable from a mere shell/investment Company or joint venture
partner/collaborator. The PBG shall be valid till 90 days beyond the Contract period &
extension thereto
2.5.9 If the Contract is extended, the validity of the Performance Bank Guarantee must also be
extended, by an equal duration. If the successful bidder does not submit the Performance Bank
Guarantee as stipulated above, GEL reserves the right to cancel/terminate the award of
Contract. The successful Bidder, by furnishing the Performance Guarantee, shall guarantee the
performance of the Contract throughout its currency and extension thereto and shall also
guarantee that the services so provided under the Contract shall be in strict conformity with
the specification and scope of work. GEL reserve the right to invoke the performance bank
guarantee for any of the following reasons including but without limitation to:
Failure of contractor to start/commence the work as per LOI/LOA/Contract
If Contractor fails to perform as per the terms and conditions of the contract.
If Contractor fails to perform as per prescribed scope of work.
If Contractor fails to work in work man like manner
If tools, machines, parts for the providing services are not fit for the performance of work.
For breach of the Contract.
2.5.10 Bidders are required to submit the price bid/quote the price as per the format of Section - IV
associated costs for performance of the tendered services.
2.5.11 The bidders shall also furnish the realistic mobilization / delivery schedule for all the services
offered as per this Tender/Inquiry document. Since time is of essence, the furnished
mobilization / delivery schedules in line with the quoted prices shall form the basis of
evaluation of the proposals/award of contract.
2.5.12 The bidders are required to quote as per the specifications and models requested in the
tender/Inquiry.
2.5.13 Price in Words & Figures: In case of any discrepancy between words and figures, the prices in
words shall prevail.
Criteria for inspection - Conformance with Specifications and test reports as requested in the
tender document.
2.6.1 GEL shall have a right/option to get the equipment’s to be deployed under this contract for
performance of the services as per the scope of work, or inspection from third party agency, as it
may deem fit (as applicable).
2.6.2 It shall be the Bidder’s responsibility to correct any deviations from specifications found during
the inspection prior to shipment/mobilization. If the deviations / damage is found upon receipt
of the services / supply at site, the same should be replaced/rectified at no cost to GEL at the risk
and cost of the Contractor.
2.7 Payment Terms.
Compensation to the Bidder shall be made as per the prices quoted and in accordance with terms
of the payments as may be finalized with Bidder and stipulated in the Contract. The Bidder shall
not unduly pre-pone the delivery schedule but will adhere to the schedule as specified. In an
event of pre-poned/early delivery on the part of the bidder, GEL shall not be liable to pre-pone
the payment. If Bidder has any reservations to this, he should clearly specify the same. Payment
will be made within one (1) month after receipt of the material/services and certified undisputed
invoices from the representative of GEL and as per terms of payment for services
provided/landed acceptable quantity and/or phase wise schedule as defined in the
Contract/Scope of Work.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 11 of
2.8 Taxes and Duties and Approvals.
2.8.1 The Bidders shall quote their prices inclusive of any & all taxes and duties that are applicable,
except Goods and Services tax (GST) which shall be paid extra at the prevailing rate. Bidder has
to submit their SAC and HSN code along with technical bid. Bidder must clearly state the
applicable GST rate which will be considered for payment of invoices.
2.8.2 Any variation in Goods and Service Tax, applicable in India as promulgated by Govt. during the
execution of the Rate Contract / Service Order(s) shall be adjusted on either side upon scrutiny
of proof of payment. Contract shall indemnify and hold harmless GEL Group from all taxes and
duties and any interest and penalties thereon. GEL shall deduct withholding taxes from all
payments due to the Contractor as per prevailing laws.
2.8.3 Bidder shall be responsible to obtain at its own cost, all required Permits / Consents, wherever
applicable and required for the performance of the Bidder’s obligations under the Contract, from
the Government of India/ concerned State Governments, authorities or agencies or political sub-
division thereof including any for exemption/concession of custom duties on
material/equipment imported into India. GEL will provide reasonable assistance wherever
required, but all expenses related to obtaining such Permits, Consents shall be to the Bidder’s
2.9 Change Orders
GEL shall have the right to make any changes, including additions to or deletions from the
quantities originally ordered or in the specifications. The negotiated/quoted rates shall be valid
& firm for period of the contract (Term of Contract) and/or any extension thereto.
GEL will issue written orders to Bidder for any changes or extra work, except in the event of an
emergency which in the opinion of GEL requires immediate attention, GEL will be entitled to
issue oral orders to the Bidder for any work required by reason of such emergency. GEL shall
ensure that such oral orders shall be followed up with written communication.
2.10 Delivery/Mobilization Time
Time is of essence of the contract and Bidder shall perform the Work and Services diligently in
accordance with the agreed mobilization time by GEL. Bidder is required to confirm the
mobilization of services upon each call out in terms of No of days. Bidder’s promised mobilization
period as per Mobilization Schedule. In the event it becomes apparent that the mobilization date
cannot be met, the Bidder shall, at its own cost, take all necessary steps to expedite the process,
failing which the provisions of Liquidated damage as specified in the Contract shall be applicable
along with other contractual provisions.
2.11 Right to accept or reject Bids
2.11.1 GEL may, at its discretion, reject any Bid or all Bids received or may accept any Bid or part bid
which, in GEL’s sole judgment, is the most advantageous to GEL.
2.11.2 GEL reserves the right to reject any and all Bids or to partially award the Supply / Work or to
enter into a Contract for the Scope of Supply/Work indicated in the Tender with two (2) or
more Bidders to get maximum advantage to GEL.
2.11.3 Also GEL reserves the right to reject any or all the bids solely based upon the past unsatisfactory
performance by the bidder/bidders in GEL, and the opinion/ decision of GEL regarding the
same being final and conclusive.
2.12 Signing of Contract / Service Order Agreement
The successful Bidder shall be required to sign a Contract/Work Order (hereinafter referred to
as the “Contract”) as per the terms & conditions contained in the Model Contract attached with
the tender along with the per pre-bid and post bid clarification /amendment/addendum issued
GEL reserves the right to enter into a Contract for all or part of the services/ materials /
equipment as specified in Tender with either one or more than one bidder to get the services /
material as per the requirement of GEL.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 12 of
2.14 Use of English Language
All correspondence, documentation and drawings shall be in the English Language.
2.15 SERVICES/MATERIALS
All SERVICES/MATERIALS (equipment) provided/supplied must meet the requirements of the
applicable codes and Technical specifications of the scope of work of Tender.
2.16 Contract and other terms
GEL and or its representative reserves the right to make any changes, including additions or
deletions from the quantities originally declared or estimated. GEL reserve the right to change
in the specifications of particular services/material on mutually agreed terms and conditions
For any of the services / items as included in the Contract with the one or more Contractors,
GEL may issue separate Callout / Services/ Purchase Orders for the required services/items
from time to time at the agreed rates and terms & conditions mentioned in the Contract.
GEL may, at its discretion, reject any Bid or all Bids received or may accept any Bid or part bid
which, in GEL’s sole judgment, is the most advantageous to GEL.
GEL reserves the right to split the award or to enter into a separate Contract for the Scope of
work/supply indicated in the Tender/Inquiry with two (2) or more Bidders to get maximum
advantage to GEL.
It is mandatory for successful Contractor to comply with applicable laws, including meet with
the following Mandatory requirements under various laws / enactments from time to time,
where applicable.
Mandatory Requirements
1. As per the Labour enactments:
Regular compliance to Minimum Wages Act, no dues to the Employees who have resigned or
whose services are terminated, engaged by the contractors regarding payment of Wages,
service compensation, Bonus, Gratuity, Unavailed Leave salary, Notice pay & etc.
2. Provident Fund Act:
Self-certificate by the employer certified by Chartered Accountant that no dues are pending
towards Payment of PF Contribution from the Employer & Employee in respect of all the
employees of Service Organizations.
Self-certificate by the employer certified by Chartered Accountant that no dues of payment of
ESI contribution from the Employer & Employee in respect of all the employees of Service
The bidding document is and shall remain the exclusive property of the GEL without any right to
bidders to use them for any purpose except for the purpose of bidding. Further, it should be
understood that the information therein is confidential, and that the bidding documents are
therefore being furnished in the strictest confidence.
2.17.1 Notwithstanding any information and data, which may be contained in this Tender Document,
the Bidder has to make independent inquiries and generally obtain its own information on all
matters that may in any way affect prices, risks and obligations of the Contractor under the
Contract. It will be imperative on each Bidder to, at its cost and responsibility, fully inform itself
of all local conditions and factors, which may have any effect on the execution of the Works,
covered under these Specifications and Tender Documents. In their own interest, the Bidders
are requested to familiarize themselves with the Income-Tax Act, 1961; The Companies Act,
1956; Customs Act, 1962; Indian Boiler Regulations, Electricity Laws, Labour Laws, Goods and
Service Tax Regulations, Works Contract Tax and other related acts, rules, regulations and laws
prevalent in India read in conjunction with the amendments issued, if any.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 13 of
2.18 Modifications and Withdrawal of Bids
1. A Bidder may not modify a Bid subsequent to its submission. No Bidder shall submit any
modified price Bid subsequent to the submission of the Bid, except in circumstances specified
by GEL in this regard in the Bid Document.
2. No bid shall be modified after the deadline for submission of Bids
3. The bidder is expected to examine the bidding document including all instructions, forms,
terms, specifications and drawings in the bidding document. Failure to furnish all information
required as per the bidding document or submission of a bid not substantially responsive to
the bidding document in every respect would result in rejection of the bid.
4. No Bid shall be withdrawn in the interval between the deadline for submission of Bids and the
expiration of the period of Bid validity specified by the Bidder in the Bid form.
2.19 Amendment of Bidding Document
a) At any time prior to the deadline for submission of the bids as well as up to bid opening, GEL
may, for any reason whether at its own initiative or in response to a clarification requested
by the bidders, modify the bidding document by amendment duly notified in writing.
b) The amendment shall be part of the bidding document and will be notified to all bidders who
have received the bidding documents. The bidders will be required to acknowledge receipt
of any such amendment to GEL within the stipulated time in writing.
2.20 Throughout these bidding documents, the terms bid and tender and their derivatives
(bidder/tenderer, bid/tendered, bidding/tendering, bid documents/ tender document etc.) are
2.21 One Bid per Bidder
A Bidder shall submit only one bid in the same bidding process. A Bidder who submits or
participates in more than one bid, directly or indirectly, will result in disqualification of all the
proposals, in which the Bidder has participated. Alternative bids are not acceptable. By way of
abundant caution, it is clarified that bids submitted by the partnership firm/proprietary firm
having one or more common partner/same proprietor would be treated as submission of
multiple bids by the same bidder resulting in disqualification of all such bids.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 14 of
SCOPE OF WORK AND TECHNICAL SPECIFICATION
Brief on Project:
Gujarat Energy Limited (GEL) is Operator in PSC blocks CB-ONN-2000/1, CB-ON/2 & RFPSC, CB-ONN-
2002/3 and CB-ONN-2003/2 and GEL Warehouse, GIDC Kerala, Dist. Ahmedabad for conveyance /
transportation of the GEL Officials & Material for the said blocks.
Required Quantity:
GEL requires the Contractor to provide one (1) Utility Vehicles for each Production Site and GEL
Warehouse, on monthly firm basis, which will include minimum travel Kilometers per month per
vehicle. The travel kms may increase/decrease based on the operational requirement.
Contract Period:
The primary term of the Contract shall be Three (03) years. GEL shall have option of extension of the
Contract for a period of one (01) year at the same rates, terms and conditions by giving seven (07) days
written notice prior to expiry of the primary term of the Contract. GEL reserves the right to terminate
the contract giving one-month notice, without assigning any reasons thereto.
Tentative Schedule of Mobilization:
The tentative requirement of the Utility Vehicles shall be within 7 days of issuance of LoA/Contract to
the successful bidder.
Vintage of Utility Vehicles to be provided:
The New Utility cum emergency vehicle (of 2500 cc, such as Mahindra Bolero Camper, Imperio, Isuzu
Dmx or equivalent) to be deputed by the Bidder under this tendered service. Bidder to submit the
undertaking for the same, along with the details of make / model / ownership documents of the vehicle
The location of hire shall be as per below:
Total Minimum m
Location Make/Model working Fix monthly
hours KM Travel
PK#2 QPS At- Pisawada, Ta- Dholka, Dis- Bolero camper or
Ahmedabad similar of
GEL Warehouse, Kerala GIDC, At- Kerala, Ta- Bavla, Min. 2500cc, having
Dis-Ahmedabad Air Condition sitting
SE#3 QPS Sanand, Village – Manipur, Taluka – cabin for 4+1 persons
Sanand, Dist. Ahmedabad, Gujarat fitted with GPS
SE#1 / SE#1#A1 QPS, Sanand East, Village – tracker back open
4. Ghumar, Taluka – Saskroi, Dist. Ahmedabad, space to load 24
Gujarat materials. GEL
ANK#40s QPS Ankleshwar, Village Diwa, Ta. reserve the right to 24
5. decide the make &
Ankleshwar, Dist. Bharuch, Gujarat.
Tarapur RFPSC, Ratanpur/Kandhroti Village, model.
Ta.Borsad/ Matar , Dist. Kheda /Anand, Gujarat.
Tarapur QPS, Tarapur Village, Kanwada, Police
station – Tarapur, Ta. Tarapur, DIst. Anand, Gujarat
— The Utility Vehicles are required to be hired for above mentioned locations. The respective
vehicles will be stationed at these locations and travel to & from these locations.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 15 of
Operating Hours of the Utility Vehicles:
The Operating hours of Production sites Utility Vehicles shall be 7 days a week and 24 hours each day
and GEL warehouse Utility Vehicle shall be 7 days a week and 12 hours each day. The Contractor shall
have to depute drivers accordingly for vehicles hired on 24 hours. The Contractor shall have to depute
adequate drivers for operating the Utility Vehicles. The Drivers of the Utility Vehicles shall be available
with the Vehicle round the clock, round the year including Sundays/Holidays and National Holidays as
per the requirement of GEL Officials. The Contractor shall make necessary provision of relievers of
Drivers for shift change and on weekly offs and holidays as no extra cost to GEL. The contractor shall
adhere and comply all the applicable labour laws including and not limited to minimum wages/on-
off/holidays/lodging/extra work hours etc. act in force from time to time.
Scope of Work and Specifications:
1. Contractor shall provide each Utility Vehicles with GPS Tracker system. All associated cost of this
GPS Tracker shall be included in the monthly charges. GEL shall not pay any additional charges for
the same. The Contractor shall provide GEL representative the access/login of this GPS Tracker to
view the movement & print the logs of the vehicle deployed under the Contract by the Contractor.
2. Services to be provided by Contractor must be prompt, punctual, efficient, safe and courteous of
corporate standards which are the essence of this service contract. The successful Contractor shall
convey acceptance of LOA within 7 days of the receipt of the LOA letter from GEL and the agency
must be ready to execute the work under the contract within 7 days of the receipt of LOA as per
number of Vehicles/Types of Vehicles required by GEL at the time of issuance of LOA.
3. The vehicle provided by the Contractor should have valid Registration Certificate, valid PUC, valid
Fitness Certificate, valid full Comprehensive insurance to cover third party and the occupants,
vehicle fitness certificate,
PUC, permit and other relevant permits/ licenses essentially required by R.T.O. and other
statutory bodies for operations of the Utility Vehicles and must be revalidated before the expiry
of the due date during the tenure of the contract period.
4. The Contractor shall pay toll taxes, parking charges as and when levied by any local or government
bodies in respect of vehicles deployed by Contractor for providing service under this Contract.
These expenditures shall be reimbursed to the Contractor on submission of original documentary
proof along with the monthly Invoice.
5. The Contractor shall ensure that the vehicles deployed by him are maintained as per vehicle
manuals and need to be up to corporate standard, must be well cleaned thoroughly inside and
outside, loading area must be kept clear of dust/rubbish/oil or any personal belongings of driver.
Hygienic conditions must be maintained inside the vehicle at all times, which shall be subject to
inspection by the officials of GEL. Any substandard vehicles shall be rejected by GEL and suitable
penalty shall be imposed as per penalty terms and conditions.
6. ln the event of any delay or breakdown of vehicles en-route, the Contractor at its own cost shall
make alternate arrangements for on-time pick-up of the officials/official guests/materials.
7. The nature of duty to be assigned to each driver/vehicle shall be at the sole discretion of GEL.
Contractor shall have to pick-up and drop officials/guests/materials from their Site to other project
sites/other places and vice versa on round the clock duty, round the year including
Sundays/Holidays and National Holidays as per requirement of GEL officials.
8. The Contractor has to ensure the safety of passengers by avoiding negligent driving by their drivers
such as over speed, rash driving and driving vehicle with defective brakes. Daily check of vehicles
to be ensured by Contractor/Driver before commencing the duty for the day. Any faults in vehicle
to be communicated well in advance to officials and administration department of GEL. Prompt
action must be initiated by Contractor for such faults in vehicle. The Contractor is fully responsible
for any minor or major fault in operation of the vehicle. In any case, faulty vehicles must not be
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 16 of
allowed for duty and alternate vehicles must be arranged by Contractor promptly. If any vehicle is
drawn out of service by the Contractor for maintenance, repairs etc. suitable alternate vehicle shall
be required to provide without any delay.
9. The Contractor shall give full Bio-data of the drivers who shall be deployed at GEL sites for services,
which should contain their address, photograph, valid license copy, contact number, employee
number along with police verification report for record purpose. All the drivers must be stationed
locally either in Ahmedabad, Gandhinagar or near Project site (within Gujarat).
10. The Contractor shall intimate GEL about newly recruited Drivers with documents prior to
respective deployment, similarly, details of resignation/termination of the drivers deployed for
GEL shall be required to be submitted by the Contractor with prior intimation and obtain consent
11. Only commercially registered vehicles shall be allowed under the contract and private passing
vehicles shall not be allowed. Further, during maintenance related replacement, commercially
registered vehicles shall be provided by Contractor.
12. All the certificates, permissions, license, insurance etc. shall be revalidated by the Contractor before
its expiry, during the tenure of the contract period.
13. Drivers to meet prescribed eyesight and medical fitness standards and submit fitness certificate,
considering the safety-critical nature of their duties.
14. All the Drivers must be in possession of valid driving license (at least 2 years old) issued by the
R.T.O. and must carry the same with them while on duty. The Driver shall also be in possession of
his Aadhaar Card. The drivers should be well literate, mannered, groomed, well dressed and should
behave courteously with the officials/official guests of GEL. The drivers should be able to at least
speaks Gujarati and Hindi languages as well as they should have working Knowledge of English.
15. The required vehicle will be made available at place directed by GEL. Kilometers will be counted
from pick up point to drop point decided by GEL. GEL is not liable to pay any payment of kilometer
consumed from the place of the Contractor’s base to the destination decided by GEL or from the
destination decided by GEL to the Contractor’s base.
16. The full authority to reject vehicle on ground of any minor/major faults or hygiene standards or
behavior of drivers shall rest with GEL officials who travel in the vehicle. Contract shall be abiding
with the decision of officials travel in the vehicle and must arrange alternate vehicle promptly if
17. The Contractor shall have to replace the driver/or and vehicle, if GEL is not satisfied with the
service of the driver or vehicle, as the case may be. Driver on the duty cannot leave the vehicle
without prior permission of the GEL officials.
18. GEL intends to hire utility vehicles Mahindra Bolero Camper, Imperio, Isuzu Dmax or equivalent of
Min. 2500cc, having AC with sitting cabin for 4+1 persons, having back open space to load materials.
19. These vehicles are required to transport the official and material from one place to another as when
directed by GEL officials. Including intervene location in Gujarat.
20. The operating hours of the vehicle as mentioned in Section III Location tables (24/7 & 12/7),
contractor to provide alteration similar vehicles during maintenance and break down.
21. A daily record indicating time and mileage for each vehicle shall be maintained in a log book which
shall be signed by the driver of the vehicles and GEL official travelling therein. The Log book shall
be maintained and available with the Vehicle all the time.
22. The vehicle is hired for conveyance of Project sites and personnel at site and local areas as per
requirement. The vehicle should have open space for carrying material suitable for transportation
along with seating cabin for a minimum of 04 personnel excluding driver.
23. The hired charges of each vehicle will inclusive travel KMs and all cost of operating fuel driver,
maintenance, RTO taxes, etc. for any additional km travel in a month will be paid extra on per km
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 17 of
24. In the event that the Successful Bidder is unable to deploy a new vehicle at the time of
commencement of the contract, the Successful Bidder shall submit a written request to the
Competent Authority seeking an extension of time. During the extension period, the Successful
Bidder shall deploy a vehicle in good roadworthy condition, meeting all applicable contractual
requirements, subject to the approval of the Authority.
25. The Contractor shall bear the cost for make arrangement for the accommodation, medical
assistance, transportation/conveyance arrangement, water arrangement for respective work
locations of their Driver and GEL shall have no obligation in this respect. The GEL shall not
26. Contractor shall be fully responsible for any accident occurred during the hire period.
27. No allowance of any kind will be paid to the driver during day/night.
28. Any penalty/fine to be paid for non-availability of vehicle papers/documents, driving license, or
due to negligent driving/parking or non-adherence to the prevailing traffic rule shall be Driver’s/
Contractor’s responsibility and cost.
Penalty Terms and Conditions:
Without prejudice to any other rights which GEL may have under the Contract or the applicable Laws,
GEL reserves the right to impose following penalties on contractor
Sr. Nature of Default Penalty Mode of
No Deduction as
1. Failing to provide vehicle after Rs. 500/-+Prorate charges Deduction from
confirmation of particular day OR Rs. monthly running
500/- + vehicle hiring cost invoice Sr. No.2 to
from other service 7 the maximum
providers per such penalty deduction
incident caped to Rs.
2. Indecent behavior of Driver Rs. 300/- per incident 5000/- per month
3. Improper condition of vehicle Rs. 500/- per incident
interior/exterior
4. Driver/contractor failed to top-up the Rs.500/- per incident
vehicle fuel leading breakdown during
local/outstation travel
5. In case of failure to provide the vehicles on Rs. 500/- per vehicle per
stipulated date, time & location incident
6. in absence of First aid kit, Portable Fire Rs. 100/- per incident per
extinguishers, Air conditioner of vehicle is vehicle
7. Any deviation of RTO rule (including but Rs. 1000/- per incident
not limited to expiry driver license /expiry
of PUC, Insurance, RTO Registration,
Fitness certificate or not providing of such
All Penalties shall be recovered from the Contractor’s bill, based on irregularities observed by GEL
officer-in-charge. In case of loss or damage of property of GEL, due to the negligence of the Driver, GEL
reserves the right to recover all such damages at actual from the Contractor. Aforesaid penalties are
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 18 of
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR CB-ONN-
2000/1 AHMEDABAD BLOCK (PK#2 QPS, PISSAVADA, GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Period Vehicles (Rs.) (Rs.)
No. Name of ment (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons Per
and having back open Utility
space to load material up Vehicle
to standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours:
hours per day and seven
(7) days a week)
2 Additional Travel Kms Per Km
Including all associated 1 1 Nos.
operating cost, fuel,
maintenance etc.)
(SAC/HSN Code: ________________________) (Applicable GST______%)
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR, GEL
WAREHOUSE AT KERALA GIDC DIST. AHMEDABAD GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Period Vehicles (Rs.) (Rs.)
No. Name of ment (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons and Per
having back open space to Utility
load material up to Vehicle
standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours:
hours per day and seven
(7) days a week)
2 Additional Travel Kms Per Km
Including all associated 1 1 Nos.
operating cost, fuel,
maintenance etc.)
3 Additional Hour Per Hour 1 1 No.
Including all associated of
operating, maintenance,
(SAC/HSN Code: ________________________) (Applicable GST______%)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 19 of
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR,
TARAPUR # QPS OF CB-ON/2 TARAPUR BLOCK GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Period Vehicles (Rs.) (Rs.)
No. Name of ment (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons and Per
having back open space to Utility
load material up to Vehicle
standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours:
hours per day and seven
(7) days a week)
2 Additional Travel Kms Per Km
Including all associated 1 1 Nos.
operating cost, fuel,
maintenance etc.)
(SAC/HSN Code: ________________________) (Applicable GST______%)
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR, SE#03
QPS OF CB-ONN-2002/3 SANAND MIROILI BLOCK GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Period Vehicles (Rs.) (Rs.)
No. Name of ment (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons and Per
having back open space to Utility
load material up to Vehicle
standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours:
hours per day and seven
(7) days a week)
2 Additional Travel Kms Per Km
Including all associated 1 1 Nos.
operating cost,
maintenance etc.)
(SAC/HSN Code: ________________________) (Applicable GST______%)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 20 of
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR, SE#1 /
SE1#A1 QPS OF CB-ONN-2000/1 AHMEDABAD BLOCK GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Period Vehicles (Rs.) (Rs.)
No. Name of ment (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons and Per
having back open space to Utility
load material up to Vehicle
standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours:
hours per day and seven
(7) days a week)
2 Additional Travel Kms Per Km
Including all associated 1 1 Nos.
operating cost, fuel,
maintenance etc.)
(SAC/HSN Code: ________________________) (Applicable GST______%)
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR, ANK#40S
QPS OF CB-ONN-2003/2 ANKLESHWAR BLOCK GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Period Vehicles (Rs.) (Rs.)
No. Name of ment (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons and Per
having back open space to Utility
load material up to Vehicle
standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours:
hours per day and seven
(7) days a week)
2 Additional Travel Kms Per Km
Including all associated 1 1 Nos.
operating cost, fuel,
maintenance etc.)
(SAC/HSN Code: ________________________) (Applicable GST______%)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 21 of
FOR HIRING OF UTILITY VEHICELS FOR PRODUCTION SITES ON MONTHLY BASIS FOR
TS – 10/PNE-1, Tarapur RFPSC BLOCK, GUAJRAT
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Equipment Description Type / Unit of Estimated No. of Unit Rate Total Amount
Sl. Model Measure Hire Vehicles (Rs.) (Rs.)
No. Name of ment Period
Vehicle (UOM) (Months)
1 Utility Vehicle (minimum Per 36 1 Nos.
2500 cc) having sitting Month/
cabin for 4 + 1 persons and Per
having back open space to Utility
load material up to Vehicle
standard one (1) ton
(per month charges shall
include travel of
kilometers including all
associated operating cost,
fuel, maintenance etc.)
(Operating Hours: 24 hours
per day and seven (7) days
2 Additional Travel Kms Per Km
Including all associated 1 1 No.
operating cost, fuel,
maintenance etc.)
(SAC/HSN Code: ________________________) (Applicable GST______%)
Note: Applicable to all above tables.
The quantities of hire period and travel kilometers, mentioned above are estimated
quantities for Three (03) year which may increase or decrease based on the operational
The rates quoted shall be inclusive of all taxes, duties, levies, cess, etc., except GST, which shall be
paid extra at the prevailing rate. The Bidder to mention SAC/HSN code & current SGST & CGST %
as required in the above table.
The Price/Rates mentioned above shall remain firm and fixed through the currency of the
Contract except for variation in fuel price. GEL will increase or decrease the agreed monthly hire
charges due to variation in the fuel price when variation in price to base rate is +/-Rs.5/- per litre.
Such increase and decrease in hire charges due to this variation shall be worked out from the base
rate on the following formula:
Increase and decrease in monthly=
Committed KMs X (Revised rate per Ltr – Base rate per Ltr)
Average KM per Ltr of fuel consumption
The average KM per ltr of fuel (Diesel) is to be assumed as 15 KMs. The base rate of fuel of price
variation shall be the rates prevalent on MyPetroPrice Website’s applicable at Gandhinagar.
Of the Contract and no price escalation on whatsoever ground shall be allowed.
GEL does not confirm to any fixed hire period or travel kilometers per day of the said vehicles
provided by the Contractor.
GEL may hire / de-hire & rehire the Vehicles by giving 30 days prior notice at any time during the
currency of the Contract, based on operational requirement. Any hire below or above one month
shall be payable on pro rata basis. For prorate payment, the month will be considered of 30 days.
The Monthly hire charges shall be inclusive of
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 22 of
(a) Minimum 2500 kilometers travel for Part A: Utility Vehicle – (PK2 QPS)
(b) Minimum 2000 kilometers travel for Part B: Utility Vehicle – (GEL Warehouse)
(c) Minimum 4000 kilometers travel for Part C: Utility Vehicle – (Tarapur QPS)
(d) Minimum 3000 kilometers travel for Part C: Utility Vehicle – (SE3# QPS)
(e) Minimum 3000 kilometers travel for Part C: Utility Vehicle – (SE#1/SE1#A1 QPS)
(f) Minimum 3000 kilometers travel for Part C: Utility Vehicle – (ANK#40S QPS)
(g) Minimum 3000 kilometers travel for Part C: Utility Vehicle – (Tarapur RFPSC)
with all associated cost of operating, fuel, lube, spares, maintenance, driver wages/salaries, driver
reliever wages/salaries, drivers’ conveyance, lodging, boarding etc. GEL shall not pay any charges
/ amount under any other account apart from the mentioned above.
Additional Travel Km charges shall be paid on the basis of actual km travelled and as certified by
GEL representative.
Additional Hour charges shall be paid on the basis of actual number of hours the vehicle is
retained or use.
The Operating hours of each Utility Vehicles shall be 7 days a week and 24 hours each day for Part
A and 12 hours each day for Part B. The Contractor shall have to deploy at least two (2) drivers
for operating the Vehicles hired on 24-hour basis. The Drivers of the Vehicles shall be available
with the Vehicle as per the respective Operating Hours, round the year including
Sundays/Holidays and National Holidays as per the requirement of GEL Officials. The Contractor
shall make necessary provision of relievers of Drivers on weekly offs and holidays at no extra cost
Any Toll Tax paid during the hire period while travelling to various locations as per the direction
of GEL representative, will be reimbursed at actual on submission of the documentary proof along
with the monthly Invoice. Each vehicle deputed, shall have its Fastag as per the Govt. notification.
No allowance of any kind will be paid to the Driver/Contractor during day/night any time during
the currency of the Contract or any extension thereto.
GPS Tracker: Each vehicle deployed by the Contractor shall be equipped with GPS Tracker. All
associated cost of this GPS Tracker shall be included in the monthly charges. GEL shall not pay any
additional charges for the same. The Contractor shall provide GEL representative the access /
login of this GPS Tracker to view the movement & print the logs of the vehicles deployed under
the Contract by the Contractor.
No payment shall be applicable in the event of the following
Breakdown: During any period when the work/travel cannot be undertaken to GEL’s satisfaction
for the reason of malfunction, breakdown or servicing of the equipment/vehicle (any or all) from
the time when breakdown occurs to when repairs are made and equipment/vehicle is
Replacement: Operations are delayed due to waiting on replacement of Contractor’s Equipment /
vehicle or personnel, whether due to late delivery, replacement in accordance with the Contract
or late to reach the Unit/Vehicle.
Safety Breach: Failure to meet Safety requirement.
Technical Breach: Failure to meet technical requirement.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 23 of
SCHEDULE “A” – MODEL CONTRACT
This Contract (hereinafter referred to as “Contract”) is made and entered into this _____day of
______________ month, 2026 between
(i) Gujarat Energy Limited (GEL) a Company is incorporated pursuant to rule 29 of the
Companies (Incorporation) Rules, 2014 and having its registered office at Gujarat Energy
Bhavan, Sector-11, Gandhinagar - 382 010, Gujarat, India as operator of CB-ONN-2000/1 -
Ahmedabad (Old PSC & RFPSC), CB-ON/2 - Tarapur (Old PSC & RFPSC), CB-ONN-2002/3 –
Sanand-Miroli and CB-ONN-2003/2 Ankleshwar Block in Gujarat, India (hereinafter
referred to as "GEL" which expression shall include all its legal successors, executors and
assignees) of the one part,
(ii) ABC Limited, a Company incorporated under the laws of _____ and having its Registered office at
___________________________ (hereinafter referred to as “Contractor” which expression shall include its
legal successors and permitted assignees) of the other part.
Each of the GEL and the Contractor shall individually be referred to as “Party” and collectively as
A. The GEL, in its capacity as the Operator on behalf of its joint venture partners, desires to hire/avail
________________________________Services for GEL Operated blocks as specified by GEL in the Tender:
Tarapur (Old PSC & RFPSC) and CB-ONN-2002/3 – Sanand-Miroli, CB-ONN-2003/2 – Ankleshwar
Blocks as set forth hereinafter on firm basis; and
B. The Contractor is engaged in the business of providing services for Utility Vehicles for Production
Sites & GEL Warehouse. The Contractor had participated in the above referred Tender and has
submitted their offer vide their Bid dated --------------------------------------including its amendments,
if any and the CONTRACTOR has agreed to provide such services on and subject to the terms and
conditions hereinafter contained.
C. The Contractor represents that it is engaged in the same business and has adequate Utility Vehicles
(fit for purpose) and manpower as required for performance of work as per the Scope of work, of
this tender and fully trained personnel capable of efficiently operating such equipments; and is
ready, willing and able to provide Utility Vehicles for Production Sites & GEL Warehouse to GEL as
per the scope of work of the tender document.
D. Pursuant to the above, GEL has awarded the work to the Contractor and has placed Letter of Award
no. ________ dated ________to for _____________services as per the scope envisaged in this Document.
E. The Contractor has familiarized itself with the working environment and site conditions.
NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter provided, the
Parties hereby agree as follows:
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 24 of
1. The Contractor agrees to provide services for Utility Vehicles for Production Sites & GEL
Warehouse at CB-ONN-2000/1 - Ahmedabad, CB-ON/2 - Tarapur (Old PSC & RFPSC) and CB-ONN-
2002/3 – Sanand-Miroli, CB-ONN-2003/2 – Ankleshwar Blocks through skilled and experienced
personnel required to perform such services (“all Services”) (fit for purpose to carry out the Scope
of Work defined and described elsewhere in the Contract) in accordance with the terms and
conditions of the Contract and, in consideration of its due performance and completion of all service
to the satisfaction of GEL, GEL agrees to pay the Contractor in accordance with the terms and
conditions herein contained.
2. The Tender Documents including the Invitation to Bidders, Instructions to Bidders, General
Time Schedule for completion of Services, Letter of Acceptance of Tender, along with its enclosures,
annexures, and appendixes, copies of which are hereto annexed form part of this Contract though
separately set out herein and are included in the expression “Contract” wherever herein used.
3. Effective Date: The Contract shall be deemed to be effective from date of issuance of the Work
Order/Purchase Order/LOA or signing of contract, whichever is earlier, by GEL (“Effective Date”)
and the Rates, terms and conditions will remain same and effective for the entire Contract Period
including extensions (if any).
4. The Contractor shall, subject to the terms and conditions of this Contract perform the Services so
as to achieve completion of the _____________________________________ Services on firm basis at CB-ONN-
2000/1 - Ahmedabad, CB-ON/2 - Tarapur (Old PSC & RFPSC) and CB-ONN-2002/3 – Sanand-
Miroli, CB-ONN-2003/2 – Ankleshwar Blocks in accordance with the terms and conditions of the
Contract to fulfil the requirements of GEL.
In WITNESS WHEREOF, the Parties hereunder have caused this Contract to be executed in duplicate,
originals in their respective Corporate names by their respective officers thereunto duly authorized as of
the date and year stated above.
Executed for and on behalf of Executed for and on behalf of
Gujarat Energy Limited, ABC Ltd.
Witness: Witness
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 25 of
GENERAL TERMS AND CONDITIONS OF CONTRACT
The Following terms and conditions will be a part of Contract.
In this contract (as herein after defined) the following words and expressions shall have the meanings
hereby assigned to them except where the context otherwise require.
A. DEFINITIONS & INTERPRETATIONS
1.1 Definitions
In the Contract the following words and expressions shall, unless the context otherwise requires, have
the following meanings:
1.1.1 “Affiliate” shall mean with respect to any Person, any other Person directly or indirectly through
one or more intermediaries controlling, controlled by, or under common control such Person:
Here “Control” means: (a) the possession, directly or indirectly, of the power to direct or cause
the direction of the management and policies of such Person whether through the ownership of
voting securities, by agreement or otherwise or the power to elect more than one-half of the
directors, partners or other individuals exercising similar authority with respect to such person,
or (b) the possession, directly or indirectly, of a voting interest of more than 50%. For the purpose
of this definition, “subsidiary” and “holding Company” shall have the meaning assigned to it under
1.1.2 “Approve”, “Approval”, “Approved” and “Directed" - means the approval or direction in
writing by GEL Representative or GEL persons deputed/authorized by GEL for the purpose.
1.1.3 “Applicable Laws” means all laws, promulgated or brought into force in the whole or in part of
territory of India, including regulations, bye-laws, and rules made thereunder, judicial or quasi-
judicial decree, order or notification enacted, issued or modified by any Government including
amendments thereof, and, as may be in force and effect during the subsistence of this Contract.
1.1.4 “Claims” shall mean and include all actions, proceedings, suits, demands, liabilities, damages,
losses, costs, charges, expenses and fines.
1.1.5 “GEL” shall mean Gujarat Energy Limited, having its Registered office at Gujarat Energy Bhavan,
Sector-11, Gandhinagar-382 010, Gujarat, India and includes its successors and assigns.
1.1.6 “GEL Group” shall mean the GEL, its affiliates their contractors, subcontractors and equipment
vendors of any tier, its Co-ventures, their personnel, officers, directors, employees and agents but
excluding Contractor Group.
1.1.7 “CONTRACTOR” shall mean the person or the persons, firm or company whose bid has been
accepted by the GEL having its registered office/head office at ___________________ and includes the
CONTRACTOR’s legal representatives, his successors and permitted assignees.
1.1.8 “Contractor Group" means Contractor, its affiliates, their contractors, subcontractors and
equipment vendors of any tier, their personnel, officers, directors, employees and agents but
excluding Company Group.
1.1.9 “Contract” shall mean contract entered into between the GEL and Contractor for ___________
services at the terms and conditions set out herein, along with all the exhibits, attachments,
appendices, schedules, annexures etc. hereto including the instructions to the bidders, General
Terms and Conditions, Specifications, Scope of work, etc. as contained in the Tender No.:
GEL/ADM/Hiring Utility Vehicles/2026-27/639 along with Letter of Award and/or any
amendments agreed and issued subsequently.
1.1.10 "GEL Indemnified Parties” shall mean all or any of the GEL, its Co-ventures, the Government of
India, its and their other contractors and sub-contractors, and its and their Affiliates and the
employees, servants and agents of any of them.
1.1.11 “GEL Representative" means the person or persons expressly designated in writing by GEL, who
signs the Contract on behalf of GEL or any other person authorized/nominated in writing by GEL
to act on behalf of the GEL and/or to perform the duties.
1.1.12 “Contract Value” shall mean, for the purpose of calculation of the Performance Bank Guarantee
Amount, levy of liquidated damages and for the purpose of indemnities, the estimated value
calculated based on amount to be incurred by GEL for the entire duration of the Contract as per
the Schedule of Rates (price quoted multiplied by tendered quantities if applicable) including but
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 26 of
not limited to the Mobilization Charges, Demobilization Charges, ILM charges Standby Charges,
Operating Charges, Lumpsum Charges, Redress Charges, inspection charges, certification etc. (as
applicable) and shall also include GST if applicable. It is clarified that the actual amount of
payment to the Contractor is likely to differ from the Contract Value calculated as per this
1.1.13 "Contractor's Equipment" shall mean all equipments deployed by the Contractor along with
auxiliary equipments, tools, spare parts, items of plant, facilities, miscellaneous materials, and
consumables more particularly described in the Scope of Work for performance of work as per
the Scope of Work of this Contract.
1.1.14 "Demobilization" shall mean the release, at a location designated by GEL, of all of the
Contractor’s Equipment/vehicle and personnel.
1.1.15 "Government" shall mean the Government of India or Government of Gujarat State, or any
political subdivision or administrative agency thereof, as the case may be, and/or their respective
representatives, or any other governmental entity, instrumentality, agency, authority,
corporation, committee, or commission under the direct or indirect control of any such
governmental authority, having jurisdiction over the work performed under this Contract.
1.1.16 "Intellectual Property Rights” means patents, utility models, registered designs, trademarks,
service marks, applications for any of the foregoing and the right to apply for any of the foregoing,
design rights, copyright, ownership of inventions, confidential information, proprietary
information and know-how and any similar rights.
1.1.17 “Performance Bank Guarantee” means the bank guarantee that is to be furnished by the
Contractor from a Bank of repute specified in the Attachment-4 hereto and acceptable to GEL for
10% of estimated Contract Value to guarantee performance in accordance with the terms and
conditions under the Contract.
1.1.18 “Contractor’s Personnel” shall mean each individual and the collective group of Contractor’s
employees, Contractor’s subcontractors, and their respective employees, subcontractors,
licensees, invitees, agents and representatives, who are deputed and/or utilized by Contractor
for the performance of the Work under this Contract.
1.1.19 “Rates or Rate” shall mean the applicable rates of compensation to the paid to the Contractor for
the equipment/services provided/performed hereunder as set forth in the respective price
schedule/Rate Schedule.
1.1.20 “Mobilization” shall mean when the Equipment (fit for purpose) required to carry out the work
along with personnel as required under the Scope of Work has been mobilized at GEL designated
location and are ready to start the operation.
1.1.21 “Willful Misconduct” means Intentional disregard of proper conduct under the Agreement with
knowledge that it is likely to result in any injury to any person or persons or loss or damage of
1.1.22 “Gross negligence” shall mean (i) the intentional failure to perform a manifest duty, in reckless
disregard of or wanton indifference to the consequences to the life, health, safety or property of
another; or (ii) any act or failure to act which, in addition to constituting negligence, was in
reckless disregard of or wanton indifference to the consequences to the life, health, safety or
property of another.
1.1.23 “Good Industry Practices” means good industry practices with such degree of diligence and
prudence reasonably and ordinarily exercised by experienced parties engaged in a similar
activity under similar circumstances and conditions;
1.1.24 “Third Party” shall mean a person/entity which is not included in GEL Group or Contractor
1.1.25 “Effective Date” shall be the date of issue of Letter of Award/Work Order/Purchase Order issued
by GEL or signing of the Contract, whichever is earlier.
1.1.26 “Term of the Contract” shall mean the duration of the Contract consisting for period of 6 months,
with an option to extend for a further period of 6 months or till completion of work, whichever is
1.1.27 “Termination Date” shall mean the time of day and date when the Term defined in contract
hereof expires or when this Contract is terminated by GEL, in accordance with its terms,
whichever occurs first.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 27 of
1.1.28 “Work” shall mean the all work, services, duties, obligations (including their related operations
and their physical products) performed by the Contractor which includes provision of all
auxiliary equipment, spares, materials, personnel and technical services & support and any other
activity necessary for the performance of Services on the Work Site/Work Location or base in
accordance with the scope of the work (including mobilization before the Commencement Date
and demobilization after any termination or completion of the Contract) as defined in the
1.1.29 “Work Site/Work Location” or “Designated Location” shall mean the lands and other places
through which the Works are to be carried out and any other lands or places approved by GEL
for the purposes of the Contract together with any other places designated in the Contract as
forming part of the Site or any other place approved by GEL for the purpose of the Contract.
1.1.30 “Sub-Contractor” shall mean any person or firm or company (other than the Contractor) to
whom any part of the Work has been entrusted by the Contractor, with the written consent of
GEL, in accordance with the terms of this Contract. The terms of the present arrangement would
be binding on such Sub-contractor and the Contractor shall be responsible to indemnify and hold
harmless GEL of any of the acts/deeds of such Sub-contractor engaged by him.
1.2 Interpretation of Contract Documents
i) Notwithstanding the sub-division of the contract documents into separate sections and volumes
every part of each Contract document shall be deemed to be supplementary to and complementary
of every other part and shall be read with and into the Contract so far as it may be practicable to
ii) Unless otherwise stated specifically, the singular shall include the plural and vice versa wherever
the context so requires.
iii) Any work order (s) issued pursuant to this document shall be deemed to be an integral part of this
contract and governed by the terms & conditions of this contract document unless specifically
provided otherwise.
iv) In case of any discrepancy with respect to interpretation of any of the clauses in this document, the
interpretation of GEL shall be final and binding.
v) The Contract Documents forming part of the Contract are to be read together as a whole and are to
be taken as complimentary to each other.
vi) Headings: The headings and sub-headings in the Contract are for convenience only and do not form
part of the Contract and shall not govern or affect the interpretation of the Contract.
vii) Instructions: All instructions, notices, agreements, authorizations, approvals, and
acknowledgements shall be in writing and in English language. Verbal instructions will not be
considered authentic, unless confirmed in writing. Any verbal instruction shall be confirmed in
writing at the earliest, provided that, if the Contractor confirms in writing any such verbal
instruction, which is not contradicted in writing by GEL in reasonable time, it shall be deemed to
be an instruction in writing by GEL. Vice versa shall also apply.
viii) Statutes: Any reference to statute, statutory provision shall include any re-enactment or
amendment thereof for the time being in force.
ix) The Contract shall consist of the following:
a) The Model Contract
b) The General Conditions of Contract
c) The Scope of Work
d) The Schedule of Rate
e) All other Annexures/Appendices to the Tender Document including the Bank Guarantee,
LOA/Work Order etc.
It is clarified that in the event of any inconsistency amongst the terms and conditions of any of the
above, the order of priority for the purpose of precedence would be as per the order set out above
i.e., document at a) above would prevail over the document at b) above and so on so forth. It is
clarified that in case of any discrepancy with respect to interpretation of any of the clauses in this
document, the interpretation of GEL shall be final and binding.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 28 of
I. Scope of Work and Technical Specifications:
The brief Scope of work & specifications shall be as per “Section – III” attached herewith.
II. Contract Price:
“Contract Price” means lump sum prices and/or rates of payment specified in Section IV and as may
be indicated in the LOA/contract, which GEL shall compensate to Contractor for the actual work
executed/completed and certified by GEL subject to any additions/deletions thereto in accordance
with the provisions of the Contract.
Upon completion the above-mentioned work, and particularly described in the Scope of Work, GEL
shall pay the Contractor for actual hire period and work done (duly certified by GEL representative)
submission of the supporting documents.
The Rates mentioned in “Section-IV” shall be firm and fixed throughout the currency of the
Contract/period and any extension thereof, and no price escalation on whatsoever ground shall be
III. Contract Period:
This Contract shall be deemed to have come into effect and shall be binding on the Parties from the
Effective Date and shall remain in effect and be valid till the expiry of Three (03) Years with an option
of extension of One (01) Years or completion of work, whichever is later. Contractor shall perform
the services at the same rates, terms and conditions throughout the term of the Contract. Time is the
Essence of the Contract.
IV. Terms of Payment:
Unless specified otherwise, GEL shall release payment within 30 days upon receipt of the undisputed
and certified invoice. Invoice will be raised in the month following the month in which the services
were performed based on the Rates, measurements and quantities verified and certified by GEL
Representative. Invoice should be raised based on the certification of work completion/services
performed duly certified by the GEL representative. Contractor shall submit all the supporting
documents along with the invoice as requested by GEL, evidencing the performance of work as per
the applicable laws. Unless all the queries raised by GEL are resolved, the payment shall not be
Each invoice shall carry GST number of both GEL and Contractor. GEL GST Registration Number is
24AAECG8093Q1ZW. No invoices shall be processed for payment unless the GST number is
captured in the invoices. No interest shall be payable by GEL for any reason whatsoever.
Invoicing Procedure
For the completed Work against the Contract, the Contractor shall be required to maintain the Log
sheets/Job Reports that will capture the Contract Items/Quantity. The Log sheets / Job Reports shall
be jointly certified and accepted by GEL and Contractor Representatives. Final Invoice for the Work
shall be prepared based on such Log sheets/Job Reports only and the original Log sheets / Job
Reports shall be attached and sent along with the Invoice for payment. Any Invoice received by
GEL without the approved Log Sheets / Job Reports shall be returned to the Contractor
without further processing. Contractor shall be required to submit a Revised Invoice with a Revised
date along with the Original Log Sheets/Job Reports.
The Contractor shall submit to GEL a correct and agreed / undisputed Monthly invoice in the first
week of subsequent month detailing the amounts chargeable by the Contractor in respect of the
Work completed. Each Invoice shall:
(a) bear the Contract Number and Block/Site description;
(b) be accompanied by a copy of Work Order/Callout, Original Log sheets/Job Reports,
acknowledged EPF payment proofs, ESI payment proofs & other supporting evidence
(c) contain details of bank account.
(d) contain PAN & GST NO/SAC NO/GST NO OF GEL.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 29 of
Invoices shall be addressed to: ED (HR, Admin & Audit) Gujarat Energy Limited,
Invoices shall be submitted to: Central Invoice Desk, F&A Department, Gujarat Energy Limited,
Gujarat Energy Bhavan, Behind Udyog Bhavan, Sector – 11, Gandhinagar – 382 010, Gujarat, India in
full respect. No interest shall be payable by GEL to the Contractor for any reason whatsoever.
Withholding Payment:
GEL shall have a right to withhold part or whole of any payment claimed by the Contractor, which in
GEL’s opinion is necessary to protect itself from loss on account of any dispute between the parties.
GEL shall have a right to withhold part or whole of any payment claimed by the Contractor, which in
GEL’s opinion is necessary to protect itself from loss on account of any dispute between the Parties
including but not limited to the following:
a) Failure by the Contractor to indemnify GEL as agreed hereto or,
b) Damage to GEL’ Property or to its to other Contractors or,
c) Failure to meet mutually agreed schedules.
d) Breach of any terms or conditions of Contract or
e) Performance of work in a manner which is contrary to the conditions laid down in the Scope of
Work or contract or against the instructions issued by GEL.
However, when the grounds for withholding payments are removed or dispute is resolved, GEL shall
make payments of the amount due to the Contractor without any delay. No interest shall be payable
by GEL on such withholding payments at the release of payments.
Notwithstanding anything to the contrary, the Contractor shall not be entitled to any payment in
the following events:
- Breakdown/Malfunction of Contractor’s Equipment – No payment shall be made for the duration
when breakdown occurs and/or there is a delay on account of such breakdown. till the equipment
is made available for continuing the work.
- Replacement: Operations/work is delayed due to waiting for replacement of Contractor’s
Equipment or personnel.
- Technical Breach: Failure to meet technical requirements as per the Scope of Work.
- Breach of Contract – Non-compliance with the terms and conditions of this Contract.
- Breach of applicable laws, specifically those governing the performance of work.
V. Performance Bank Guarantee:
The Performance Bank Guarantee is required to be submitted within Twenty-one (21) days of the
issue of LOA/Work Order/Contract, whichever is earlier, The Contractor shall present to the GEL a
Performance Bank Guarantee in the form of an irrevocable, unconditional, payable on first demand
by GEL, divisible bank bond in the format of Attachment -4 issued by an approved bank as per the
list of Bank attached. Failure to comply with this condition will constitute grounds for termination
of the award/ Contract. The Performance Bank Guarantee shall be for 10% of the Contract Value
(including GST). The Performance Bank Guarantee shall be valid till 90 days beyond the Contract
period & extension thereto. If the Contractor does not submit the Performance Bank Guarantee as
stipulated above, GEL reserves the right to cancel the Work Order/LoA and forfeit the Bid Bond.
The Contractor by furnishing the Performance Bank Guarantee shall guarantee the Performance of
work under the Contract and shall also guarantee that the supply/services so provided under the
Contract shall be in strict conformity with the specifications and shall satisfactorily perform during
the Contract period. GEL shall have right to forfeit the entire Performance Bank Guarantee amount
in the event the Contractor does not perform or denies to perform against the Contract terms and
conditions at any point of time during the Contract period.
GEL shall not be liable to pay any Bank Charges, Commissions, or Interest on the amount of
Performance Bank Guarantee. The Performance Bank Guarantee provided by the Contractor is
intended to operate as security for amounts (including damages where applicable) which becomes
payable by the Contractor by virtue of this Contract and are not intended to be used as a penalty.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 30 of
Without prejudice to its other rights under the Contract or at law, GEL shall be entitled to invoke the
performance bond, in the event of breach of the provisions of the WO/Contract. The Performance
Bank Guarantee shall remain at the entire disposal of GEL as Security for the satisfactory
commencement, performance and completion of the Scope of Work under the conditions of the
Contract including recovery of amounts due to GEL from the Contractor arising out of this Contract
under whatever head.
The Performance Bank Guarantee shall be replenished to its original level every time any
withdrawal is made on them by GEL. GEL reserve the right to invoke the performance bank
guarantee for any of the following reasons including but without limitation to:
Failure of Contractor to start/commence the work as per LOA/Work Order/Contract
If Contractor fails to perform as per the terms and conditions of the contract.
If Contractor fails to perform as per prescribed scope of work.
If Contractor fails to work in work man like manner.
If equipments for providing services are not fit for the performance of work or the equipments
installed by the Contractor are not fit for purpose.
If the Contractor fails to protect the GEL for which GEL is indemnified by the Contractor under
If Contractor is in breach of Contract.
VI. General Terms & Conditions:
All our other General Terms and Conditions applicable to this Contract shall be as here below:
1. Entire Agreement: This Contract constitutes the entire agreement between the Parties hereto and
supersedes all prior negotiations, representations or agreements related to the Contract either
written or oral. No amendments shall be effective unless issued in writing and agreed by both the
GEL and Contractor.
2. Assignment and Sub-Contracting: Contractor shall not assign or sub-contract this Contract
/Work/Purchase/Service Order or any rights or obligations in whole or in part, to any third party
hereunder without the prior written consent of GEL. Any assignment or sub-contracting of this
Contract or of any rights hereunder or hypothecation, or creation of any lien or charge thereof in any
manner, in whole or in part, by operation of law or otherwise, without the prior written consent of
GEL shall be void.
Notwithstanding any sub-contracting or sub-letting of the Work, the Contractor shall be solely
responsible for the Works in all respects as if such sub-contracting had not taken place and as if such
Work had been done directly by the Contractor. Also, in no case sub-contractors, shall pass on any
claim/liability to GEL. In case any Claim/liability of whatsoever nature is passed over to GEL, the
Contractor shall indemnify GEL for all costs of any kind/nature incurred by GEL along with interest,
compounded on a monthly basis at the rate of SBI MCLR.
Notwithstanding anything to the contrary contained in this Contract, the Parties acknowledge and
agree that pursuant to a Composite Scheme of Amalgamation and Arrangement approved by the
Board of Directors of GEL, GEL shall amalgamate with Gujarat Gas Limited (“GGL”) and that upon
such amalgamation becoming effective, this Contract shall also stand novated in favour of GGL. The
Parties agree that a notice from GGL or GEL notifying that the amalgamation envisaged in the
Composite Scheme of Arrangement has become effective, shall be sufficient to effectively result into
novation of this Contract in favour of GGL.
3 Warranties and Remedies
3.1 The Contractor represents and warrants that it has full understanding and knowledge of the nature
and extent of the Scope of Work and services required to be performed hereunder, and that it has
satisfied itself completely as to the conditions under which the Work are to be performed, including
but not limited to means of access, conditions affecting performance of service, personnel and
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 31 of
facilities required for the Work, the correctness and sufficiency of the rates and prices in Price
Schedule for performance of the Work as well as the conditions under which the Work are to be
performed including, but not limited to local rules and regulations which may affect, the provision
of Work as per the Scope of Work of this Contract.
3.2 Contractor represents and warrants that it is lawfully registered, domiciled and fully qualified to do
business and it has or shall obtain, at its sole cost, all necessary permits and licenses required under
Applicable Laws to commence, continue and complete the Work in accordance with the provisions
of this Contract.
3.3 Contractor shall diligently perform the Work in a skillful and workmanlike manner and in
accordance with the established Good Industry Practices throughout the term of the Contract and
the Contractor shall carry out all of its obligations under the Contract and shall execute the Work
with all due care and diligence and with the skill to be expected of a Contractor of repute and
experience in the types of work to be carried out under the Contract in accordance with Good
Industry Practices and as per the scope of work of this contract.
3.4 Contractor represents that is it is engaged in such specialized operations and represents that it has
adequate resources, service capability and personnel in accordance with Good Industry Practices
and shall perform the Work strictly in accordance with this Contract as described in Scope of Work
and shall comply with and adhere strictly to GEL’s instructions and directives on any matter
concerning the Work. Failure to comply with the warranties stipulated under this contract shall
amount to breach of Contract.
3.5 Contractor agrees to comply with and shall ensure that its Personnel & Sub-contractor’s Personnel,
comply with all Applicable laws, International/Indian codes, rules, regulations and specifications
applicable to the Equipment and Services. All Equipment, materials, machinery and goods deployed
or engaged by Contractor under this contract, shall be of good quality, high precision and
workmanship, safe and free from defects in workmanship. Time is of the essence of the Contract
and Contractor shall perform all Services in conformity with the time schedule, specifications and
the obligations contained herein, unless the delay is due to Force Majeure or reasons wholly within
GEL’s control. Any failure by Contractor to timely mobilize the resources for performance of work
at the work site or perform the work in timely manner shall attract the provisions of Liquidated
Damages clause.
3.6 GEL shall be entitled, without prejudice to any other rights or remedies available to GEL under
this Contract or otherwise in law to object to and require Contractor to remove from the Work any
person who in the reasonable opinion of GEL is incompetent, misconduct’s himself, is negligent in
the proper performance of his duties or is otherwise considered to be undesirable. In such an
event, Contractor shall forthwith remove such person from the Work, and such person shall not
be again employed upon the Work without the written permission of GEL. Contractor shall
forthwith replace, at Contractor’s sole expense, any such discharged person with a suitable
qualified and experienced person satisfactory to GEL in reasonable time. In such a case Work shall
not be affected or delayed.
3.7 GEL shall have the right to inspect Contractors Equipment & Material at any time to observe its
condition/status of the on-going work and may notify Contractor of any apparent defects/delay in
progress (if any) therein. Contractor shall take immediate steps to rectify the defects at its cost or
take corrective actions as per the instructions of GEL. However, such inspection by GEL shall not
imply any acceptance of the condition of the Contractor Equipment/Work done by the Contractor,
by GEL and Contractor shall not be relieved of its obligations under this Contract by any such
inspection. Contractor shall keep and maintain up to-date records of all work done as well as
Contractor’s Equipment and material at the Work Site reflecting its condition and quantity and will
make such records available to GEL whenever requested. Contractor shall always maintain the
equipment in fit for purpose condition during the term of Contract.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 32 of
3.8 The warranty shall apply to all works/service performed by Contractor as per the Scope of Work
under this Contract. Contractor warrants that it shall perform all such works in a Good and
Workmanlike Manner. Contractor warrants to GEL that Contractor’s Personnel who are skilled,
experienced and competent in their respective positions, and who are fit for duty shall perform all
works. Contractor undertakes to ensure that its personnel comply with GEL’s regulations regarding
health, safety and training which are in force at such time and at such place.
3.9 Defect liability period shall be for 12 months from the date of successful commissioning
/completion of work. During such warranty period contractor shall be liable to rectify any defects
and replace defective parts, as per the instructions of GEL at no extra cost to GEL.
3.10 Records/ Reports: Contractor shall keep detailed records of all Work performed including records
evidencing planned and actual compliance. Contractor shall present such records to GEL for
inspection on request. Contractor shall produce a final job report, which will be presented to GEL
on completion of the Services. Contractor shall furnish to GEL such data, information and reports
as may be required by GEL from time to time. Contractor shall at all times keep GEL fully and
promptly informed of all matters of whatsoever nature affecting or likely to affect the progress of
the work or the work time schedule.
3.11 Contractor shall be responsible for the transportation of Contractor’s equipment/materials and
personnel to Gujarat Energy Bhavan at its sole cost.
3.12 Contractor shall be responsible for providing food, transportation and First Aid medical attention
for Contractor, Sub-contractor’s personnel and medical services for Contractors personnel at all
3.13 Contractor shall be responsible for supplying all fuel, electricity, petrol, oils and lubricants used for
the services at its base.
3.14 Contractor shall, regularly inspect, service and maintain contractor’s items/Equipments
throughout the Term.
3.15 The Contractor shall observe and comply with all statutory provisions, GEL’s policies and
procedures applicable to the Services from time to time, standing orders, International/Indian
codes, regulations and instructions relating to health, safety and environment. GEL Representative
may require formal meetings from time to time and Contractor or his nominated deputy fully
conversant with the health, safety and environment requirements shall attend such meetings.
3.16 Contractor shall furnish to GEL an accurate record of the Work performed on a daily basis as per
GEL’s requirements. The job sheet should be jointly signed by GEL and Contractor representative
3.17 Contractor represents that the Contractor as well as his personnel have full knowledge of
Applicable Law that may govern the performance of this Contract and they shall comply with the
same during the Term of the contract.
3.18 Contractor agrees to obtain, at its own expense, all authorizations, licenses and permits that may
be required for the operation of its equipment, tools, Machineries etc. in the performance of the
3.19 GEL or its authorized representative shall be entitled to inspect and/or test the equipment/ at
Contractor’s premises and/or at any other site and may notify Contractor of any apparent defects
therein. However, such inspection by GEL shall not imply any acceptance of the condition of the
Contractor’s Equipment and Contractor shall not be relieved of its obligations under this Contract
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 33 of
by any such inspection. Contractor shall always maintain the equipments/consumables in fit for
purpose condition during the term of Contract.
3.20 The Contractor is expected to mobilize the equipments considering the timelines/schedule
indicated by GEL in the LOA/PO/Contract or call-out notice. No rental will be payable for early
mobilization. Upon completion of the job and unless instructed to retain the services, the
Contractor should demobilize its equipments/remove the equipments with permission of GEL’s
representative from Gujarat Energy Bhavan.
3.21 Without prejudice to any other right of GEL under the Contract, in the event of non-performance of
services or lack of services by the Contractor or failure of equipments or part thereof, GEL shall
have a right to immediately terminate the Contract, if such default has not been remedied by the
Contractor within three days after issuance of notice/intimation for the same.
3.22 Contractor shall take no action on behalf of GEL in the performance of the Work or rendering of
Services or the conduct of operations hereunder which would subject either party to liability or
penalty under the Applicable Laws, including any laws, rules, regulations, or decrees of any
governmental authority or political sub-division thereof, and if it does so, the Contractor shall
indemnify GEL for such losses, costs and expenses (including attorney or legal fee, if incurred)
incurred by GEL.
3.23 Contractor shall have no authority to make any statements, representations or commitments of any
kind or to take any action which shall be binding upon GEL, except as provided for herein or
otherwise authorized in writing by GEL.
3.24 On completion or earlier termination (for whatsoever reason) of the Services, the Contractor shall
demobilize its Equipments and/or Personnel forthwith.
4. Warranty and Guarantee:
4.1 The Contractor warrants and guarantees that the Work will be performed as per the Good Industry
Practices, under this Contract. Where GEL has found the Work or part thereof or any re-work has
not been performed in accordance with the terms of the Contract or the Equipment is not working
properly/defective (not fit for purpose), GEL shall inform the Contractor about the specific nature
of the defect/non-performance/defective performance. Upon receipt of such notification, the
Contractor shall promptly take action necessary to correct/rectify such defect and/or re-perform
the Work in accordance with the Contract. If Contractor fails to correct such defect and/or re-
perform the Work in accordance with the instructions issued by GEL within the stipulated time
period, GEL may on its own or by any third party on behalf of GEL, proceed to perform the work
and/or replace such defective tools/equipment/re-perform, so as to ensure that the work is not
affected on account of non-performance by the Contractor and get the work done from a third party
as specified in the Scope of Work at the Contractor's sole risk and expense/cost. In the event any
loss or costs are incurred by GEL on account of any failure in obligations performed by the
Contractor such costs shall be recoverable by GEL from the Contractor. The re-performance of such
defective work or action by GEL shall not relieve the Contractor of any of its obligations under the
Contract or under the applicable laws. Defects shall not be deemed waived by GEL’s failure to notify
Contractor upon receipt of Services or by payment of invoice.
5. Completion of Work: Contractor shall deliver/complete the Work in accordance with the scope of
work of the Contract. Strict compliance with these requirements is the essence of the Contract.
6. Inspection and Approval: GEL on its own and/or its authorized third-party inspection agency
reserve the right to inspect the Equipment deployed / Work at Site where the Work is being
undertaken by giving a reasonable notice. The Equipment/Work shall be rejected if found/performed
in non-compliance with the requirements of this Contract.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 34 of
7. Compliance with applicable Laws, Rules and Regulations: Contractor represents that it has
knowledge of and shall comply with & shall cause Contractor’s Personnel as well as Sub-contractor
(if any) to comply with the all laws, rules, ordinances and regulations applicable in India that may
govern the performance of the obligations contained in this Contract and ensure compliance with all
the applicable laws. Contractor agrees to obtain, at his own expense, all authorizations, licenses and
permits that may be required for the operation of its equipment in the performance of the Work. All
costs and expenses incidental to such compliance will be paid by Contractor. Contractor shall defend,
protect, hold and indemnify GEL Group harmless from and against any action, cause of action,
damages, claims, penalty, demands whatsoever, either at law or in equity, judgments including costs
and legal fees which may be rendered against GEL Group in the event of non-compliance with the
provisions of this Clause. The Contractor shall be solely responsible for any damage to environment
and shall also indemnify GEL for any losses/damages that GEL has suffered or is likely to suffer.
8. Variation: The quantities mentioned in the scope of work are estimated quantities, which may vary
based on actual requirement of GEL within the scope of the Contractor at any time during the
currency of the Contract term. GEL reserves the right to make changes/give instructions to vary the
Contract. No variation in this Contract will be accepted unless it is in writing.
9. Insurance & Labour enactments: Contractor shall carry and maintain all relevant and valid
insurance cover for its employees, workmen, personnel, equipment, which are mobilized to GEL
designated location for performing the scope of work, as per relevant applicable laws, as amended
from time to time particularly the workmen’s compensation act, payment of wages act, contract
labour (regulation act), etc., and keep GEL indemnified under this contract. Contractor shall ensure
strict & regular compliance to Minimum Wages Act and any other applicable laws.
The provisions of this clause shall in no way limit the liability of the Contractor under the Contract or
Applicable Laws. All such insurances shall be placed with reputable and substantial insurers
acceptable to GEL.
Contractor’s insurances shall be primary to and receive no contribution from GEL insurances.
Commencement or performance of Services without delivering the certificates of insurance shall not
constitute a waiver of Contractor’s obligation to provide the required insurance coverage.
10. Limitation of Liability:
Notwithstanding anything contained in the Contract to the contrary, the Contractor Group’s
total/aggregate liability under this Contract, tort or otherwise shall be limited to a sum equal to One
hundred percent (100%) of the Contract Value. Contractor Group’s total/aggregate liability under
this Contract, tort or otherwise shall be limited to a sum equal to three hundred percent (300%) of
the Contract Value in case of Gross Negligence or Willful Misconduct. Provided that aforesaid cap for
limitation of liability shall not apply and the Contractor shall continue to remain responsible for all
liabilities which arise on account of:
Breach of Applicable Laws by the Contractor Group.
Liability for payment or non-payment of taxes and other statutory duties/fees of any nature.
Liability for breach of Intellectual Property Rights of any person.
11. Tax Indemnity:
11.1 Unless specified in the Contract it is deemed to understand that Contract Rates are all-inclusive. All
taxes and duties are deemed to be included in the Contract Prices. Contractor shall indemnify and
hold harmless GEL and Co-ventures from all taxes and duties and any interest and penalties
thereon. GEL shall provide the required forms as applicable for tax exemptions/concessions. GEL
shall make statutory deductions from all payments made to the Contractor under this Contract.
11.2 The rates given in the Contract are inclusive of all levies/duties paid/payable in execution of the
Contract except Goods & Service Tax which shall be paid extra at the prevailing rate as indicated
above. Any variation during the Contract period as promulgated by Govt. shall be adjusted on either
side on scrutiny of proof of payment. However, increase in taxes, levies/duties for work executed
beyond the Contract duration will not be applicable.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 35 of
11.3 Change in Law:
(a) In the event of any change or amendment of any Act or law, Rules or Regulations of
Government of India or Public Body, which becomes effective after the effective date of Price
Bid or revised Price Bid submission and which results in increased cost of the works under the
Contract though increased/decreased liability of taxes of Goods and Service Tax, (other than
personnel and Corporate taxes and other taxes), duties, the Contractor shall be indemnified
for any such increased/decreased cost to GEL subject to the production of documentation
proof provided the rates and all applicable taxes along with the tax rate, were clearly indicated
at the time of Bid submission by contractor.
(b) Similarly, any change or amendment of any Act or law, including Indian Income Tax Act, Rules
or Regulations of any Government becomes effective after the effective date of Price Bid or
revised Price Bid submission and which results in any decrease in the cost of the project
through reduced liability of taxes, (other than personnel and Corporate taxes) duties, the
Contractor shall pass on the benefits of such reduced cost, taxes or duties to GEL.
(c) Notwithstanding the above-mentioned provisions, GEL shall not bear any liability in respect
(i) Personnel taxes on the employees of Contractor and the employees of all its sub-
Contractors etc.
(ii) Corporate taxes in respect of the Contractor and its sub-Contractors.”
(iii) Any taxes for which the Contractor or any or all of his sub-contractors are directly
assessable i.e. Corporate taxes and Fringe benefit tax in respect of Contractors and all of
their sub-contractors, agents etc.
(iv) break up and rates of taxes not provided in the Offer
11.4 Liens: Contractor shall immediately pay and discharge any lien, claim or encumbrance, of any
nature, (or shall provide security for payment thereof) attributable to Contractor. Contractor shall
indemnify and hold GEL harmless from and shall keep GEL’s equipment and property free and
clear of all liens, claims, assessments, fines and levies incurred, created, caused or committed by
Contractor. If Contractor fails to pay and discharge any such lien, claim or encumbrance, then GEL
may do so and charge Contractor for all costs, with an additional five per cent (5%) of such costs
and expenses, be payable by Contractor and may be deducted and set off against any monies owed
to Contractor by GEL pursuant to the Contract. GEL shall have the right to retain out of any
payment to be made to, or to be reimbursed to, Contractor, an amount sufficient to indemnify it
completely against any such lien, claim, assessment, fine or levy exercised or made and all
associated costs.
11.5 Audit: GEL and its authorized representatives shall have access to, and the right to audit and
obtain copies of any of Contractor's and its subcontractors' or agents' documents of whatsoever
nature (except the confidential information of pricing formulate of the Contractor) relating to or
in connection with the performance of the Work, including books, vouchers, receipts, invoices,
correspondence, government correspondence, contracts, representations before statutory
authorities, tribunals, courts and any other records. The Contractor will preserve and will cause
its subcontractors and agents to preserve all such records for a period of three (3) years from the
end of the calendar year in which this Contract terminates and will, upon written request, make
them available to GEL and its representatives. The Contractor shall provide photocopies of any
documents within a reasonable period whenever demanded by GEL, Audits referred in this Clause
will be made during Contractor's normal working hours. Any payment made by GEL shall not
imply acceptance of liability on the part of GEL. GEL shall have the right to notify Contractor of any
matters arising in an audit which may necessitate making an adjustment; and such adjustment,
whether by reimbursement to GEL or otherwise, shall then promptly be made. GEL shall also have
the right to obtain assistance and statements from any of Contractor’s Personnel to the extent it
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 36 of
deems necessary, and Contractor and its subcontractors shall make such personnel available at
their assigned locations if still under employment with Contractor or its subcontractors.
12. GEL provided information: On receipt of any specifications, drawings or other information
required for the Work and supplied by GEL or supplied expressly on its behalf, the Contractor shall
inspect same for omission, inconsistency or inaccuracy. If the Contractor considers there is any
omission, inconsistency or inaccuracy in such specifications or drawings, or that any modification
should be made, the Contractor shall notify GEL forthwith in writing.
13. Local Goods and Services: In the provision of the Work, Contractor shall: -
a) give preference to the purchase and use of goods manufactured, produced or supplied in India
provided that such good are available on terms equal or better than imported goods with respect
to the timing of delivery, quality, quantity required, price and other terms;
b) employ Indian sub-contractors having the required skills or expertise to the maximum extent
possible insofar as their services are available on comparable standards with those obtained
elsewhere and at competitive prices and on competitive terms, provided that where no such sub-
contractors are available, preference shall be given to non-Indian sub-contractors who utilize
Indian goods to the maximum extent possible, subject to the provision in 13(a) above;
c) co-operate with and assist Indian companies as sub-contractors to enable them to develop skills
and technology;
d) ensure to the best of its ability that provisions in terms of 13(a), 13(b) and 13(c) above are
contained in the sub-contractors; and
e) ensure that suppliers in India are given adequate opportunities to compete for the supply of
goods and services for the provision of the Work.
14. Termination:
14.1 Unless otherwise provided, the Contract shall terminate upon expiry of the Term of the Contract.
The Contractor shall be paid for the Work successfully completed and certified by GEL
Representative along with demobilization charges, if any. Save as specified elsewhere in the
Contract, GEL shall have the right to terminate the Contract in the following circumstances:
A. Termination for Non- Mobilization or Non-commencement of Work
If the Contractor fails to timely mobilize the Materials and/or Equipments (fit for purpose) and/or
Personnel required to perform the work as per the scope of work of this Contract or having
mobilized, fails to timely commence the work in accordance with the terms of the Contract, it
would amount to material breach under the Contract and in such event, GEL shall have right to
terminate the Contract immediately upon expiry of such specified time, unless otherwise provided
or agreed by GEL.
Consequences of Termination:
Upon termination of Contract by GEL under this sub-clause A, the Contractor shall not be entitled
to any payment whatsoever. The Contractor shall immediately refund any sum which GEL might
have paid in advance to the Contractor under this Contract. Unless, otherwise provided in the
Contract, the Contractor shall compensate GEL for all losses, expenses etc. which GEL shall sustain
on account of such breach by the Contractor.
B. Termination for events specified below:
Occurrence of any of events as specified below shall be construed as Event of Default. GEL shall
inform the Contractor of the same by issuing a notice of default (hereinafter referred to as “Notice
of Default”). If the Contractor, upon receipt of such notice, fails to remedy such default with Seven
(7) days, then GEL shall have the right to terminate this contract forthwith. Event of default shall
occur if the Contractor:
a) Commences a voluntary proceeding, or an involuntary proceeding is commenced against the
Contractor seeking liquidation, reorganization or other relief with respect to the Contract or
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 37 of
its debts under any bankruptcy, insolvency or other similar laws now or hereafter in effect,
or seeking the appointment of a trustee, receiver, liquidator, custodian or other similar official
of the Contractor for a substantial part of its property, or if the Contractor shall consent to
any such relief or to the appointment of or taking possession by any such official in any such
proceeding commenced by or against a Contractor; or
b) Makes a general assignment for the benefit of its creditors; or
c) Refuses or fails to supply enough properly skilled workmen or proper equipment, or
materials or services to accomplish the Work in accordance with the original work
schedule/scope of work and the contract; or
d) Fails to make prompt payment to Sub-contractors or materials, equipment or labour; or
e) Is in breach of Applicable Law; or
f) Otherwise breaches the provisions of the contract or part thereof; or
g) Suspends or abandons activities in the Work site; or
h) Is wound up (not being a member’s winding up for the purpose of reconstruction or
amalgamation only) or if a receiver or manager on behalf of a creditor shall be appointed or
if any deed or action substantially equivalent to any of the foregoing deeds or actions either
in Indian law or applicable law shall occur; or
i) Fails to provide uninterrupted services/perform work.
Consequences of Termination:
Upon termination of Contract by GEL under this sub-clause B, the Contractor shall be entitled to
payment for the work successfully completed and certified by GEL Representative till the date of
Termination. Further, GEL shall be entitled to take possession of the Work (excluding the
equipments and personnel) and finish the Work at the risk and cost of the Contractor by whatever
method GEL deems just and expedient. Unless otherwise provided in the Contract, the Contractor
shall compensate GEL for all losses, expenses etc. and additional expenses which GEL shall sustain,
to get the work executed, on account of such breach by the Contractor.
In such events as above:
a) The whole or part of the Performance Bank Guarantee furnished by the Contractor is liable
to be forfeited without prejudice to the right of GEL to recover from the Contractor
b) The amount that may have become due to the Contractor on account of Work already
executed by it shall not be payable to it until after the expiry of six (6) calendar months
reckoned from the Termination Date of Contract or from the taking over of the Work or part
thereof by GEL as the case may be.
C. Termination in the event of Force Majeure
In the event that a condition of Force Majeure exists at the Site for a period of fifteen (15)
consecutive days, GEL shall have the right to terminate this Contract by giving two (2) days
advance notice to Contractor.
Consequences of Termination:
Upon termination of Contract by GEL under this sub-clause C, the Contractor shall be entitled to
payment for the work successfully completed and certified by GEL Representative till the date of
Termination, if applicable as per Contract. No Party shall be obligated to pay the other Party for
losses, expenses, damages etc. sustained on account of event of Force Majeure.
D. Termination for Convenience
Notwithstanding anything to the contrary under this contract, GEL shall have a right to terminate
the Contract in whole or in part, at any time with fifteen (15) days prior written notice thereof to
the Contractor. Upon any such termination the Contractor irrevocably agrees to waive any and all
claims for damages, compensations, including loss of anticipated profits, on account thereof, and
as the sole right and remedy of the Contractor, GEL shall pay the Contractor in accordance with
the date of such termination.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 38 of
Consequences of Termination:
Upon termination of Contract by GEL under this sub-clause D, the Contractor shall be entitled to
payment for the work successfully completed and certified by GEL Representative till the date of
Termination as well as demobilization charges, if applicable in the Contract.
E. Termination for non-performance or non-satisfactory performance of the Work
The Contractor shall perform the work in accordance with Good Industry Practices and the terms
and conditions of the Contract. If the Contractor does not perform the Work or any part thereof or
its performance is non-satisfactory, then GEL shall issue a notice (“Remedy Notice”) to the
Contractor to remedy such non-performance or non-satisfactory performance. Upon receipt of
such Remedy Notice, the Contractor shall remedy such default within Seven (7) days. GEL may ask
the Contractor to remedy the default in any of such services, at sole risk and cost of Contractor. In
the event, the Contractor fails to remedy such default within the specified period or the
performance of the Contractor is non-satisfactory repeatedly; GEL shall have a right to terminate
the Contract immediately without any further notice.
Consequences of Termination:
Upon termination of Contract by GEL under this sub-clause E, the Contractor shall be entitled to
payment for the work successfully completed and certified by GEL Representative till the date of
Termination. Further, GEL shall be entitled to take possession of the Work (excluding the
equipments and personnel) and finish the Work at the risk and cost of the Contractor by whatever
method GEL deems just and expedient. Unless otherwise provided in the Contract, the Contractor
shall compensate GEL for all losses, expenses etc. the additional expenses which GEL shall sustain
on account of such breach by the Contractor.
F. Termination for Breach of any Undertaking
In the event after the award of Contract, it is discovered/found by GEL that any of the conditions
stated in the Undertakings furnished by the Contractor under this Contract at the time of bidding
is found to be false or any event mentioned in such undertaking occurs after the award of the
Contract, GEL shall have a right to terminate the Contract immediately at its sole discretion by
giving notice of termination to the Contractor. This shall be without prejudice to GEL’s rights and
obligations under the Contract or under the law, including right to recover damages from the
14.2 Upon receipt of Notice of Termination, the Contractor shall, unless a notice directs otherwise:
a) Immediately discontinue the work from that date and to the extent specified in the notice;
b) Place no further orders or agreements for materials, equipment, services or facilities except
as may be necessary for the completion of such portion of the work which is directed to be
c) Promptly make every reasonable effort to procure cancellation upon terms satisfactory to GEL
all orders and sub-contracts to the extent they relate to the performance of the discontinued
portion of work; and
d) Do only such work as may be necessary to preserve and protect Work already in progress and
protect materials, facilities and equipment on the work site or in transit thereto.
14.3 The exercise of any of the rights granted to GEL hereunder shall not prejudice or affect any other
rights of action or remedy, which have accrued or shall accrue thereafter to GEL.
14.4 Upon termination of Contract, the obligation of the Contractor shall continue as to portions of the
work already performed and as to obligations assumed by the Contractor prior to the date of
14.5 Payment upon Termination
If the unpaid balance of the Contract Price exceeds the cost incurred by GEL on finishing the work
as provided in the Contract, such excess shall be paid to Contractor upon completion of the Work.
If the unpaid balance of the Contract Price is lower than the cost incurred by GEL on finishing the
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 39 of
work as provided in the Contract, the Contractor shall promptly pay the difference to GEL upon
receipt from GEL of the certificate certifying the amount of such difference. Obligations arising
under this article shall survive the termination of the contract.
15 Indemnity and Liabilities
15.1 Indemnity by Contractor: Contractor shall be responsible at all times, including time in storage, in
transit or at work site and shall indemnify and keep GEL Group indemnified and harmless under
the Contract for performance of obligations by the Contractor hereunder save as is otherwise
herein specifically provided, and indemnify and hold harmless GEL Group from any and all claims,
actions, proceedings, suits, demands, charges, liabilities, costs, damages and expenses of every kind
and nature or other obligations hereunder directly or indirectly associated herewith, judgments
and fines arising out of or in the course of execution of work, including but not limited to Claim
with respect to sickness, injury or death of any Contractor’s Personnel and to damage or
destruction to any property owned, hired or supplied by Contractor arising directly or indirectly
during or as a result of the performance of this order from any cause whatsoever, (except if directly
caused by the Gross Negligence or Willful Misconduct of GEL).
15.2 Indemnity by GEL:
GEL shall indemnify and keep the Contractor Group indemnified and harmless from all actions,
proceedings, suits, claims, demands, liabilities, damages, losses, costs, charges, expenses and fines
i) Personal injury, illness or death of any GEL Group’s personnel (except if directly caused by the
Gross Negligence or Willful Misconduct of Contractor Group);
ii) Any loss or damage to any property owned, hired or supplied by GEL Group (except if directly
caused by the Gross Negligence or Willful Misconduct of Contractor Group).
15.3 Patent Indemnity: Contractor shall indemnify and hold harmless GEL, its successors and assigns
and agents from and against any and all claims, losses, damages, liability, suits and demands arising
from actual or alleged infringements of any patent or patent right, copy right or similar protection
in connection with the Work, except where such claims arise out of work and material furnished in
accordance with drawings and specifications provided by GEL.
15.4 Notwithstanding anything above, the Contractor shall defend, indemnify and hold harmless GEL
along with its Co-Ventures and their owned, controlled, affiliated and subsidiary companies and
the stockholders, directors, agents, employees and representatives of each, from and against any
and all claims or losses of whatever kind and nature, including all related costs and expenses
incurred in connection therewith in respect of (i) personal injury, illness or death of a third party;
and/or (ii) loss of or damage of any kind to any facilities, tools, equipment and/or personal
belongings of a third party; to the extent the same arises out of breach of the obligations hereunder
or, negligence and/or breach of the duty (statutory or otherwise) of Contractor or its
subcontractors or invitees.
15.5 Contractor shall be responsible at all times, including time in storage, in transit or at work site and
shall indemnify and keep GEL Group indemnified and harmless under the Contract for
performance of obligations by the Contractor and indemnify and hold harmless GEL Group from
any and all claims, actions, proceedings, suits, demands, charges, liabilities, costs, damages and
expenses of every kind and nature or other obligations hereunder directly or indirectly associated
herewith, judgments and fines arising out of or in the course of execution of work, including but
not limited for the following:
Failure of Contractor to start/commence the work as per LOA/Work Order/Contract
If Contractor fails to perform as per prescribed scope of work.
If Contractor fails to work in work man like manner.
If Contractor is in breach of Contract i.e. Non-compliance with the terms and conditions of this
Breakdown/Malfunction of Equipments and/or there is a delay on account of breakdown or
delay in providing services or services are not fit for the performance of work.
Delay due to waiting for replacement of Contractor’s Equipment and/or personnel.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 40 of
Breach of any applicable laws, including but not limited to the laws governing performance
under this contract.
16 Contractor’s Responsibility for Pollution
(a) Contractor undertakes that substances or rubbish in any form originating from Contractor’s
Equipment shall not be dumped or discharged at, or around the Site location. However, in the event
of such dumping or discharge by Contractor, Contractor shall immediately assume all
responsibility for the cost of removal of items, substances or rubbish so dumped or discharged and
for any resulting pollution or contamination of any form in the Site location and the surrounding
area and shall take necessary and adequate steps to prevent environmental damage and, where
some adverse impact on the environment if unavoidable, to minimize such damage to extent
possible and consequential effects thereof to the property and people
(b) If GEL has, reasons to believe that any Work by the Contractor or any operations conducted by the
Contractor are endangering or may endanger persons, or are causing avoidable pollution, or are
harming fauna and flora or the environment, GEL may pursuant to applicable period as may be
determined by GEL and, if appropriate, repair such damage or remedy such loss at the cost of the
Contractor, GEL may, pursuant to Applicable Law, require the Contractor to discontinue
operation/work in whole or in part without any cost to GEL until the Contractor has taken such
action to rectify the above events.
(c) The Contractor shall ensure that:
(i) The Work is conducted in an environmentally acceptable and safe manner consistent with
Good Industry Practice and that such Work is professionally monitored.
(ii) Any contract entered into between the Contractor and its Sub-contractors relating to the Work
shall include the provisions stipulated herein and any established measures and methods for
the implementation of the Contractors obligations in relation to the environment under the
17 HSE: In provision of Work, Contractor shall address all the issues related to Health, Safety and
Environment including but not limited to abiding by the applicable laws, its employees’ Health and
Safety, selection of Environmentally friendly materials, etc. It is mandatory that all Contractor’s
personnel shall wear steel-toed safety boots, safety glasses and helmets which shall be supplied to
them & borne by the Contractor. Over and above the Contractor/Supplier shall abide by all our
Health, Safety and Environmental policies of GEL.
18 Liquidated Damages:
If Contractor for any reason other than Force Majeure, fails to timely mobilize any of the Equipment
(fit for purpose) and/or Contractor’s Personnel/manpower (with requisite experience) as per the
Scope of Work of the Contract at designated location/Site/Gujarat Energy Bhavan as per the time
schedule mentioned in the Contract or Mobilization Notice/Callout notice or fails to timely
commence, continue to perform uninterrupted Work in accordance with the terms of this Contract,
without prejudice to any other right or remedy available to GEL, GEL shall have a right to seek
payment from the Contractor and the Contractor shall pay to GEL, as ascertained and pre-agreed
liquidated damages, and not by way of penalty, One percent (1%) of Contract Value for each week
or part thereof of such late commencement of the Work or each interruption of Work up to a
maximum of Ten percent (10%) of Contract Value. GST (if applicable) on the said liquidated
damages will be charged extra and the Contractor shall be liable to pay the same along with amount
of liquidated damages.
The Parties agree that the liquidated damages ascertained above are genuine pre-estimate of losses
/damages likely to be suffered by GEL in the aforesaid circumstances. The payment of liquidated
damages pursuant to this section shall not affect the rights of GEL as per Contract or Applicable laws
including the following rights to:
a) Terminate the Contractor or a portion or part of the Work thereof at any time during the Term
of the Contract and/or,
b) Recover damages resulting from Contractor's breach of any of the provisions hereof and/or,
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 41 of
c) Get the Work done by any other contractor at the risk and cost of the Contractor and/or,
d) Invoke Performance Bank Guarantee or any other security provided by the Contractor and/or,
e) Recover actual and/ or amount payable by GEL to its contractors or Sub-contractors or third
party for the services relating to the Work.
By way of abundant caution, it is clarified that in addition to recovering liquidated damages, GEL
may exercise any one or more of its rights mentioned above as per the Contract and the Applicable
GEL may without prejudice to its right to effect recovery by any other method, deduct and withhold
the amount of liquidated damages from any money belonging to the Contractor in its hands (which
includes GEL 's right to claim such amount against Contractor's Performance Bank Guarantee) or
which may become due to the Contractor. Any such recovery of liquidated damages shall not
relieve the Contractor from any of its obligations/ liabilities under the Contract.
The Parties agree that the liquidated damages indicated hereinabove are genuine pre-estimate of
the minimum loss/damage which GEL will suffer on account of delay/breach on the part of the
Contractor and the said amount shall be payable without any requirement of proof of the actual
loss or damage caused by such delay/ breach.
By way of abundant caution, it is clarified that during this period of delay, Contractor will not be
eligible for any payment, whatsoever.
19 Force Majeure:
19.1 Where any Force Majeure event renders impossible or hinders or delays the performance of any
obligation then the failure or omission of GEL or Contractor to perform such obligation shall not
be treated as a failure or omission to comply with this Contract. “Force Majeure” shall mean any
act which is insurmountable and outside the reasonable control of the parties Events of Force
Majeure shall include, but shall not be limited to, acts of God, epidemic/pandemic, landslide,
lightning, earthquake, flood, fire, explosion, major storm (hurricane, typhoon, cyclone, etc.) or tidal
wave, act of war (declared or undeclared) or public enemy, riots (otherwise than amongst
Contractor’s personnel), strike (excluding strikes, lockouts or other industrial disputes or action
solely among employees of Contractor or its subcontractors), act or omission of sovereign states
or those purporting to represent sovereign states, blockade, embargo, quarantine, public disorder,
sabotage or any other events beyond the control of the parties or either of them. Strikes shall only
be considered as Force Majeure if they are officially declared/ accepted strikes. However, Force
Majeure shall not include occurrences as follows:
(a) Delay in performance of delivery caused by congestion at Contractor’s facilities or elsewhere,
an oversold condition of the market, inefficiencies, or similar occurrences.
(b) Late performance by Contractor and/or a sub-contractor caused by unavailability of
equipment, supervisors or labor, inefficiencies or similar occurrences;
(c) Mechanical breakdown of any item of Contractor’s or its Sub-contractor’s equipment, plant or
(d) Delays due to ordinary storm, inclement weather, seasonal rains or monsoon;
(e) Non-conformance by Sub-contractors;
(f) Financial distress of Contractor or any of its Sub-contractors; and
(g) Failure to carry out contracted services in accordance with the instructions of GEL on account
of any accident, breakdown or non-performance or unsatisfactory performance of any
equipment(s) or on account of any reason within the control of the Contractor.
19.2 Any delay or failure in performance by either party hereto shall not give rise to any claims for
damages or loss of anticipated profits if, and to the extent, such delay or failure is caused by Force
Majeure. Neither Party hereto shall be liable to the other, for the payment of monies, for failure to
perform any obligations hereunder when performance is hindered or prevented by Force Majeure.
The affected party shall inform the other party immediately in writing (within 24 hours) of its
inability to meet its obligations hereunder, specifying the cause of Force Majeure, and shall do all
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 42 of
that is reasonably within its power to remove the Force Majeure conditions. Such party shall advise
the other party when such Force Majeure ceases (within 24 hours of ceasing of Force Majeure) and
shall resume performance of its obligations hereunder as soon as reasonably possible thereafter.
No payment will be due to the Contractor between the commencement of Force Majeure and
commencement of Normal operations by the affected party.
19.3 The affected party shall make every reasonable effort to remove or remedy the cause of such Force
Majeure or mitigate its effect as quickly as may be possible. In the event that a condition of Force
Majeure exists at the site for a period of at least fifteen (15) consecutive days, GEL shall have the
right to terminate this Contract by giving Two (2) days advance notice to Contractor.
20 Settlement of Disputes/Arbitration:
a) GEL and the Contractor undertake that all disputes, differences or questions at any time between
the parties arising under this Contract (“Disputes”) shall be resolved between the parties in good
b) If any Dispute cannot be resolved between the parties within sixty (60) days or any agreed
extension thereof, any Party may refer the dispute to arbitration by a sole arbitrator to be mutually
appointed by the Parties. Unless otherwise agreed in writing, the arbitration shall be held at
Gandhinagar, Gujarat, India and shall be conducted in accordance with Indian Arbitration and
Conciliation Act 1996 (including any statutory modifications or reenactments thereof) and rules
there under excluding any laws, opinions, or regulations that would require application of the laws
of any other jurisdiction. The arbitrator to be appointed shall be retired Judge of any of the High
Courts or Supreme Court of India. Unless otherwise agreed in writing, the seat of arbitration shall
be Gandhinagar, Gujarat, India.
c) The English language shall be used in the arbitral proceedings. Unless otherwise agreed in writing,
each party shall equally bear the cost of arbitration.
d) It is also a term of the Contract that the Contractor shall not stop the Work under this Contract and
the Work shall continue as expected regardless of whether the arbitration proceeding have
commenced or not.
e) Notwithstanding any disagreement, dispute, protest, request for arbitration or court proceedings
relating directly or indirectly to the Work, at all times, Contractor shall proceed with the Work in
accordance with the determinations, instructions and clarifications of GEL. If the Contractor fails to
proceed with the Work, he shall be considered to be in default and shall be held liable for any for
any direct, indirect or consequential costs and expenses arising from such default. During the period
Contractor is proceeding with the Work, he shall be paid the undisputed portion of his claims which
are due under the Contract.
f) The right to arbitrate disputes and claims under this Contract shall survive the termination or
invalidity of this Contract or any term hereof.
g) Any award rendered by the arbitrator shall be final and binding upon the parties. The Parties agree
to submit to the exclusive jurisdiction of the Courts at Gandhinagar, Gujarat, India.
21 Governing Law: This Contract shall be governed by and construed in accordance with laws of India
and the Parties submit to the exclusive jurisdiction of courts of Gandhinagar, Gujarat, India. This
Clause survives the expiry/termination of this Contract/Service Order.
22 Consequential Damage: Notwithstanding anything else contained herein to the contrary and
subject to Clause 19(e), neither party shall be liable to the other for special, indirect or consequential
damage resulting from, or arising out of this Contract including but not limited to, loss of profit, loss
of revenue, anticipated profits, loss of business opportunity or business interruption, suffered by
23 Time is of Essence: Time is the essence of the Contract and timely execution/completion of work
in accordance with the terms of the Contract has to be strictly complied with, failing which the
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 43 of
Contractor/Supplier will have to indemnify GEL of all the loss or expenditure that GEL may incur or
24 Severability: If any portion of this Contract is determined to be illegal, invalid or unenforceable, for
any reason, then, insofar as is practical and feasible, the remaining portions of this Contract shall be
deemed to be in full force and effect as if such invalid portions were not contained herein.
i) All information and other materials disclosed, furnished, communicated or supplied by a party;
hereinafter the Disclosing Party to the other Party; hereinafter the Receiving Party, including the
Receiving Party’s directors, officers, employees, Affiliates, or its expressly authorized
representatives or agents are strictly confidential and shall be considered as Confidential
Information. The Parties agree that Confidential Information shall not be divulged by Receiving
party to any third party during the Term of this Contract or thereafter for a period of five (5) years
from such disclosure or the determination of the 5-year period, whichever is later, without the
Disclosing Party’s prior written consent.
ii) For avoidance of doubt, “Confidential Information” shall be deemed to include all information
including but not limited to any technical, commercial and financial information,
improvement, inventions, know how, innovations, technology, trade secrets, professional secrets,
copyrights and any other intellectual property, discoveries, ideas, concepts, papers, software in
various stages of development, techniques, models, data, source code, object code,
documentation, manuals, flow charts, research, process, procedures, functions, customer
names and other information related to customers, price lists and pricing policies. However, the
Parties hereto acknowledge that Confidential Information shall not include any information that:
a) is now or subsequently becomes publicly known or available without breach of this Contract by
the Receiving Party;
b) was previously in the possession of the Receiving Party without any obligation of confidentiality
and which was not acquired from, provided, given, sold or otherwise disclosed (directly or
indirectly) by the Disclosing Party not through this Contract.
c) is to be shared by GEL with its JV partners, to regulatory authorities, Government, Courts or
other authorities required by law or in the course of legal proceedings
iii) The Contractor shall obtain written approval from GEL prior to making any publicity release or
announcement regarding the Contract, the Works or Contractor’s activities related to its
participation in the Work or any other Confidential Information. If so requested by GEL, Contractor
further agrees to require the Contractor’s Personnel, its Sub- Contractors, and their employees to
execute appropriate undertakings of confidentiality similar to that imposed on the Contractor
under this Clause, prior to performing any Work under this Contract.
iv) The Contractor shall hold the Confidential Information confidential and shall not divulge or
disclose the Confidential Information, or make the Confidential Information available to any person
or entity, other than its authorized representatives and ensure that only such authorized
representatives who are expressly authorized by it to and whose duties require them to possess
the Confidential Information shall have access to the Confidential Information on a need-to-know
basis. In case of any breach of these terms or any act or omission by the Contractor, Contractor’s
Personnel, Sub-Contractors or any of their authorized representatives, the Contractor agrees to
indemnify GEL for any losses or damages suffered on account of breach by the Contractor.
26 Conflict of Interest: Contractor/Supplier represents and warrants that it is not aware of any
conflict of interest with respect to this Contract. Without limiting the foregoing, Contractor
represents specifically that neither Contractor nor Contractor’s Personnel have knowingly promised
or conferred any financial benefits, of any kind whatsoever, to any employees of GEL or such
employees’ dependents in connection to the Contractor or Contractor’s Personnel in obtaining this
Contract or performing its terms and conditions. Contractor shall exercise reasonable care and
diligence to prevent any actions being taken or conditions from arising which could result in a
conflict with GEL’s best interest.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 44 of
27 Waiver: None of the provisions of this Contract shall be considered waived by GEL unless GEL gives
such waiver in writing. No such waiver shall be of any past or future default, breach or modification
of any terms, provisions or conditions of this Contract unless expressly set forth in such waiver.
None of the following shall release Contractor from any of the warranties or obligations of this
Contract or be deemed a waiver of any right or remedies as to any prior or subsequent default in
accordance with the Contract:
Failure by GEL to insist upon strict performance of any terms or conditions of this Contract, or
Failure or delay to exercise any rights or remedies provided herein or by law, or
Failure to properly notify Contractor in the event of breach, except for any breach which
according to provisions of Contract has to be notified, or
Acceptance of or payment for any Service of Contractor.
28 Notices: All notices and other communications provided for in this Contract shall be in writing and
shall be delivered at the addresses for notices given in the Contract. A party may notify the other
from time to time of changes in the address for notices. E-mails and facsimile transmissions shall be
held to have been received at the time of transmission report.
29 Independent Contractor: Contractor shall perform the work as an independent contractor.
Contractor is not and shall not become or represent itself as Co-venture, Affiliate, partner, employee
or agent of GEL. The Contract does not form any agency, partnership, joint ventures or joint rela-
tionship between the Parties. Subject to the compliance with the Contract, the Contractor shall be
solely responsible for the manner in which Works are performed. All Contractor’s Personnel/
representatives engaged by the Contractor in performing the Contract shall be under the complete
control of the Contractor and shall not in any event be deemed to be the employees of GEL.
Contractor shall be responsible and shall indemnify GEL for all acts, defaults, omissions or negli-
gence of the Contractor, Contractor’s Personnel, its Sub-contractors and their respective agents,
servants, employees, workmen, and representatives.
30 Records & Inspection: Contractor shall keep detailed records of all work performed, including
records evidencing planned and actual compliance. Contractor shall furnish to GEL an accurate
record of the Work performed on a daily basis as per GEL’s requirements. The job sheet shall be
signed by Contractor’s representative before the same is submitted to GEL. The Contractor shall
present such records to GEL for inspection whenever requested. GEL is at liberty to inspect any
equipment’s during performance of the Contract and the Contractor shall remedy any defects
found free of cost. Any defects and deficiencies that are noticed during this inspection will have to
be attended by the Contractor from time to time.
31 Other Conditions and Stipulations: It is mandatory that all Contractor’s personnel shall wear steel-
toed safety boots, safety glasses and helmets which shall be supplied to them by the Contractor at
its cost. Over and above the Contractor/Supplier shall abide by all the Quality, Health, Safety and
Environmental policies of GEL.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 45 of
GEL SAFETY RULES
The following rules outline some of the basic safety requirements for all GEL worksites. These rules
will be reviewed with all employees and contractors and will be a topic of regular safety meetings.
1.0 The use alcohol or illegal drugs while on GEL business, whether on client property, or in GEL
vehicles or privately-owned vehicles hired temporarily or permanently by GEL will NOT be
tolerated, and will lead to dismissal.
2.0 Hard Hats approved by GEL will be worn at all times on worksites. Contractors are to provide
their own PPE, however, in certain circumstances, GEL may provide PPE on a temporary or cost
recovery basis.
3.0 GEL approved safety boots are required on all worksites.
4.0 Clean protective clothing suitable to the job being done and weather conditions must be worn.
Appropriate gloves shall be worn as required by the task at hand.
5.0 Appropriate hearing protection and/or GEL approved eye protection will be worn as dictated by
the work being performed.
6.0 Appropriate fire-retardant clothing will be worn on worksites by all of our personnel as dictated
by the work being performed.
7.0 Smoking is permitted only in designated areas. Designated smoking areas may need to be changed
from time to time as new fire/explosion hazards are identified.
8.0 GEL Ground Disturbance Procedures will be adhered to when performing any excavations.
9.0 GEL vehicles/equipment will be operated as per posted speed limits, regulations and operating
manuals. Seat belts where available must be worn at all times. Always walk around the
vehicle/equipment before starting out. Non-essential vehicles are not allowed within 30 meters
of well, separator, storage tank. Vehicles entering well site are required to be equipped with spark
arrestors and may be subject to inspection and/or work permit. Spotters for heavy equipment
and vehicles will be provided where necessary. Spotter shall wear reflective vests.
10.0 Non-essential persons shall be kept out of well site and construction areas.
11.0 No electrical appliance, equipment or machinery including lighting apparatus, mobile phones, or
non-intrinsically safe radios shall be used in Zone ‘0’ hazardous area, or in Zone 1 areas without
utilizing the Permit to Work System (hot work).
12.0 Riders are not permitted on heavy equipment. Operators shall ensure the equipment is fully
stopped and secured prior to dismounting.
13.0 Appropriate fall protection equipment is required when working above 2 meters. This includes
full body harness, lanyards, and climbing devices where required.
14.0 Only GEL approved slings shall be used for lifting operations and tag lines will be provided for
suspended loads. Site safety officers shall inspect lifting equipment and lifting operations on a
15.0 Hazards are to be immediately reported to a supervisor or the GEL Safety Officer.
16.0 Keep the work site clean and organized.
17.0 GEL management may exempt certain visitors from Rules 4, 5, and 6 provided that the visitor will
not be unduly exposed to any hazard, and, will be accompanied by competent GEL staff at all times.
Compliance with these rules is mandatory – non-compliance will lead to dismissal. These rules
shall be posted at all GEL worksites
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 46 of
BIDDERS RESPONSE ACKNOWLEDGMENT OF REQUEST FOR QUOTE PACKAGE
As a delegated authority/representative of the organization named below, I have reviewed the contents of
the package and on behalf of my company, acknowledge the receipt of the same and advise that we will:
Transmittal of signed scanned copy via email: To [email protected] and
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 47 of
[ON LETTER HEAD OF THE BIDDER]
DECLARATION OF NO DEVIATIONS/ EXCEPTIONS
(To be submitted as part of Technical bid)
[Address and Contact Details]
Bidder’s Reference No.___________________________ Date……….
Tender Document No.
Subject: Declaration of Compliance with Tender Terms and Conditions
We hereby confirm that we have thoroughly read, understood, and acknowledged the terms
and conditions of this tender. Where necessary, we have sought and obtained clarifications
from GEL. Additionally, we have duly noted all clarifications, amendments, and addenda issued
by GEL in relation to this tender and have accordingly submitted our bid.
We further confirm that our submission does not include any deviations, exceptions, or
reservations to the terms and conditions set forth in the tender document or any subsequent
clarifications, amendments, or addenda issued by GEL.
We unconditionally accept and agree to comply with all terms and conditions of the tender
without variation or modification. Any terms and conditions stated elsewhere in our bid that
are contrary to the tender requirements shall be deemed null and void.
(Authorized Signature with date)
(BIDDER TO USE THE ABOVE FORMAT ONLY, FOR SUBMISSION.
NO OTHER FORMAT SHALL BE ACCEPTED)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 48 of
TO: Gujarat Energy Limited, a company incorporated pursuant to rule 29 of the Companies
(Incorporation) Rules, 2014 and having its registered office at Gujarat Energy Bhavan, Sector -
11, Gandhinagar, Gujarat, India. (hereinafter referred to as “GEL”).
…………………………(hereinafter referred to as “Tenderer”) has submitted a proposal dated
………..(“hereinafter referred to as Proposal”) against Tender/Inquiry No..: _______________ dated
______________for ______Tendered Services/Supplies_________ (hereinafter referred to as the
“Tender/Inquiry”).
NOW, THEREFORE,
(1) In response to the request made by the Tenderer, we (Name of Banker/Insurer:)
____________________________ (hereinafter called the “Guarantor”) hereby irrevocably and
unconditionally guarantee the sum of Indian Rupees Rs.________/- (INR ___________________Only in
favor of GEL, if Tenderer fails to perform its obligations as set forth below:
(i) The Tenderer agrees to keep the Proposal open for acceptance by GEL during the period of
validity (120 days from the Closing Date) specified in the Tender/Inquiry.
(ii) The Tenderer, having been notified of acceptance of its Proposal by GEL during the period of
Tender validity:
(a) Fails or refuses to execute the agreed Contract/Service/Purchase Order, if required; or
(b) Fails or refuses to furnish the Performance Bank Guarantee in accordance with the format
provided in the Tender/Inquiry document; or
(c) Seeks Variation or modification of Proposal; modifications to the agreed terms and
(d) Tries to influence GEL on bid evaluation, bid comparison or Contract/Service/Purchase
Order award decision.
The sum shall become payable by us immediately on first demand by GEL without proof or
conditions notwithstanding any constitution or protest by the Tenderer or any other third party.
(2) GEL shall have the full liberty without our consent and without affecting in any manner, our
obligation hereunder, to relax any of the terms and conditions of the aforesaid Tender, from time
to time, or to postpone any time any of the powers exercisable by GEL against the said Tenderer
and Guarantor shall not be relieved from its liabilities by reason of any such relaxation being
granted to the Tenderer by GEL or any indulgence by GEL to the said Tenderer or by any such
matters or things whatsoever.
(3) The Guarantor shall not be discharged or released from this Guarantee by any
Contract/Service/Purchase Order made between the Tenderer and GEL with or without the
consent of the Guarantor or by any alteration in the obligations undertaken by the Tenderer or
by any change in name or constitution of GEL or the Tenderer.
(4) The Guarantee herein shall not be affected by any change in the constitution of the Bank or the
(5) This Guarantee shall not be revoked during its currency, and shall remain in effect for One
Hundred and eighty (180) days from the Tender Closing Date.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 49 of
(6) This Guarantee shall be governed and construed in accordance with the laws of India and all of
the parties to this Guarantee hereby irrevocably submit to the non-exclusive jurisdiction of
Courts in Gandhinagar.
IN WITNESS whereof this Guarantee has been duly executed by GUARANTOR the ___________ day of
Refer Attachment – 5: Finance Department, GR No. FD/MSM/e-file/4/2025/2712/D.M.O. dated
ALTERNATIVELY, THE BIDDER CAN SUBMIT DEMAND DRAFT FOR THE BID BOND VALUE. THE
DEMAND DRAFT SHOULD BE MADE IN FAVOUR OF “GUJARAT ENERGY LIMITED.” PAYABLE AT
GANDHINAGAR/AHMEDABAD, GUJARAT. THE DEMAND DRAFT WILL BE GOVERNED BY THIS BID
BOND TERMS & CONDITIONS. BIDDER MAY ALSO HAVE OPTION OF SUBMITTING THE BID BOND
It is a condition precedent to the acceptance of any Tender by the GEL that the Tenderer shall provide a
Bid Bond by means of a Bank Guarantee for an amount stated in the Invitation to Tender in the prescribed
format and valid for a period of 180 days from the Closing Date. The Tender may be disqualified in the
absence of a Bid Bond in the prescribed format.
Conditions for Invoking of Bid Bond Guarantee
The following conditions would also lead to the invoking of Bid Bond Guarantee:
a) If the Tender is withdrawn during the validity period or any extension thereof.
b) If the Tender is varied or modified in a manner not acceptable to GEL during the validity or agreed
extension validity period duly agreed by the Tenderer or after notification of award by GEL and prior
to signing of the Purchase Order/Contract.
c) If the successful Tenderer is seeking modifications to the agreed terms and conditions after
notification of award or declines to accept the Letter of Intent/Award.
d) If the successful Tenderer fails to furnish Performance Bank Guarantee within 21 days of the issue of
the Letter of Intent/Award.
e) Any effort by the Tenderer to influence GEL on bid evaluation, bid comparison or Purchase
Order/Contract award decision.
The formats for any of the Bank Guarantees shall not be changed except for any minor variations
that the Bank may require. Failure to comply with this requirement may entail disqualification of
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 50 of
PERFORMANCE BANK GUARANTEE FORMAT
TO: Gujarat Energy Limited, a company Incorporated pursuant to rule 29 of the Companies
(Incorporation) Rules, 2014 and having its registered office at “Gujarat Energy Bhavan, Behind Udyog
Bhavan, Sector – 11, Gandhinagar – 382 010, Gujarat, India (herein after called “GEL”).
(1) By a Contract No. ____________ dated _________ (hereinafter referred to as the “Contract”) for the
Provision of _________________ between (hereinafter called the “Contractor”) of the one
part and GEL of the other part, the Contractor agrees to perform the Services in accordance with
(2) In response to the request made by Contractor, we …(Name of Banker:)… (hereinafter called the
“GUARANTOR”) hereby irrevocably and unconditionally guarantee in favor of GEL, the payment
of amounts (without any withholding, deduction or set off) the sum of IN Rs.__________ (Rupees
_____________), as guarantee for obligation of the Contractor to perform the work in accordance
with the Contract. The sum shall become payable by us immediately on first demand by GEL
without proof or conditions notwithstanding any dispute or protest by the Contractor or any
other third party. Multiple demands may be made in respect of our guaranteed obligations.
(3) We shall not be discharged or released from this Guarantee by any waiver, modification,
agreements made between the Contractor and GEL with or without the consent or by any
alteration in the obligations undertaken by the Contractor or by any forbearance whether as to
payment, time performance or otherwise, or by any change in name or constitution of GEL or the
(4) This Guarantee is a continuing security and accordingly, shall remain in operation for 90 days
after the completion of the Contract period. This Guarantee shall be valid up to ___________.
We agree that the Guarantee is given regardless of whether or not the sum outstanding
occasioned by the loss, damages costs, expenses or otherwise incurred by GEL is recoverable by
legal action or arbitration.
The rights under this Guarantee shall be assignable by GEL to third parties.
This Guarantee shall be governed by and construed in accordance with the laws of India and all
of the parties to this Guarantee hereby irrevocably submit to the non-exclusive jurisdiction of
Courts in Gandhinagar.
The Guarantee herein contained shall not be determined or affected by the liquidation or winding
up, dissolution or changes or constitution or insolvency of the said Contractor but shall in all
respect and for all purposes be binding and operative until payment of all money due to you in
respect of such liabilities is paid.
IN WITNESS where of this Guarantee has been duly executed by GUARANTOR this ____ day of ________,
2026 or and on behalf of …(Contractor)…).
Refer Attachment – 5: Finance Department, GR No. FD/MSM/e-file/4/2025/2712/D.M.O. dated
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 51 of
LIST OF BANKS FOR SUBMISSION OF BANK GUARANTEES, “BID BOND” AND
“PERFORMANCE BANK GUARANTEE”
Finance Department, GR No. FD/MSM/e-file/4/2025/2712/D.M.O. dated 01/04/2026
(A) Guarantees issued by following banks will be accepted as SD/Bid Bond on permanent basis.
1. All Nationalized Banks
(B) Guarantees issued by following Banks will be accepted as SD/Bid Bond for period up to March
31, 2024. The validity cut-off date in GR is with respect to date of issue of Bank Guarantee
irrespective of date of termination of Bank Guarantee.
1. AXIS Bank 23. South Indian Bank
2. AU Small Finance Bank 24. Standard Chartered Bank
3. Bandhan Bank 25. Tamilnadu Mercantile Bank
4. City Union Bank 26. Ujjivan Small Finance Bank
5. CSB Bank 27. YES Bank
6. DBS Bank India Limited 28. Ahmedabad Mercantile Co-operative Bank
7. DCB Bank 29. Nutan Nagarik Sahakari Bank Ltd
8. Dhanlaxmi Bank 30. Rajkot Nagarik Sahakari Bank Ltd
9. Equitas Small Finance Bank 31. Saraswat Co-operative Bank Ltd
10. FEDERAL Bank 32. SBPP Co-Operative Bank Ltd.
11. HDFC Bank 33. SVC Co-Operative Bank Ltd.
12. HSBC Bank 34. The Cosmos Co-op Bank Ltd.
13. ICICI Bank 35. The Gujarat State Co-operative Bank
14. IDBI Bank 36. The Surat District Co-operative Bank Ltd
15. IDFC First Bank 37. The Surat People’s Co-operative Bank Ltd
16. IndusInd Bank 38. The Baroda Central Co-operative Bank
17. Jammu & Kashmir Bank 39. The Panchmahal District Co-operative Bank
18. Jana Small Finance Bank 40. The Kalupur Commercial Co-operative Bank
19. Karnataka Bank 41. The Rajkot Commercial Co-operative Bank
20. Karur Vysya Bank 42. The Banaskantha Mercantile Co-op. Bank Ltd.
21. Kotak Mahindra Bank 43. Gujarat Gramin Bank
All the eligible banks are instructed to collect the original documents/papers of guarantee from the
concerned tendering authority.
(Sandeep Kumar)
Secretary (Economic Affairs)
Finance Department
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 52 of
Bid Qualification Criteria
Hiring of Utility Vehicles for Production Sites & GEL Warehouse
BIDDER’S ELIGIBILITY CRITERIA
Bidder to submit the information/documents in support of the following Criteria (TO BE SUBMITED IN
THE TECHNICAL BID)
1) TENDER FEE (No Tender Fee)
2) BID BOND ₹. 96,000/-
Immediately upon submission of the bid bond by RTGS/Demand Draft, the bidder to submit by
email the “Vendor Registration Form” in excel format preferably along with the requested
documents. Vendor Registration Form is attached as Exhibit to the Tender Document.
3) Copy of IT PAN (if applicable)
4) Copy of Goods & Service Tax Registration No. (as applicable)
5) Copy of Provident Fund Code No. (as applicable)
6) Copy of ESI Registration No./Medical Group Insurance No. (as applicable)
7) Details Bank Name, Branch, Account No.
8) Bidder’s complete details i.e. Name, Address, Tel No., Fax No.
9) Names of the Proprietor, Partners, Directors.
10) Bidder’s authorized representative: Name, Contact Details.
11) Acceptance to the terms and conditions of the Tender. Submit stamped/signed copy of this Tender
in token of unconditional acceptance to the terms and conditions herein or may submit the
Undertaking for unconditional acceptance to the Tender terms and conditions.
Submission of Prescribed form for No Exception / Deviation to the Tender Specifications, Terms
12) The Bidder to submit last three Financial Years (FY 2022-23, 2023-24, 2024-25) audited Balance
Sheet along with IT acknowledged Return Form ITR of the same.
13) The average of annual turnover of the bidder for the last three financial years (FY 2022-23, 2023-
24, 2024-25) should be as follows: (bidder to submit Chartered Accountant Certification for
Average of Annual
BID SUBMISSION FOR Turnover required.
Vehicle nos: 07 ₹. 58,51,000/-
(Vehicle type – Bolero camper or similar of Min. 2500cc, having Air Condition
sitting cabin for 4+1 persons fitted with GPS tracker back open space to load
BID SUBMISSION FOR Vehicle nos
Part-A: For PK#2, QPS: Block: Pissavada: CB-ONN-2000/1
Part-B: For GEL Warehouse Kerala GIDC, Balva, Ahmedabad
Part-C: For Tarapur # QPS: Block: Tarapur: CB-ON/2
Part-D: For SE#03 QPS: Block: Sanand Miroli: CB-ONN-2002/3
Part-E: For SE#1/SE1#A1 QPS: Block: Ahmedabad: CB-ONN-2000/1
Part-F: For Ank#40S QPS: Block: Ankleshwar: CB-ONN-2003/2
Part-G: For Tarapur RFPSC: Block: Tarapur RFPSC: CB-ON/2
14) The net worth of the Bidder should be positive for the last FY 2024-25. (Bidder to submit Chartered
Accountant Certificate for the same)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 53 of
TECHNICAL BID EVALUATION CRITERIA (to be submitted in the Technical Bid)
Bidder to submit the documents in support of the following Criteria
1) Bidder require to quote for all locations to avoid rejection of the bid.
2) Bidders must have valid GST certificate. Bidder to submit copy of the same.
3) The bidder must have dedicated branch or registered office in Gujarat having
Administrative/Support Office at Ahmedabad / Gandhinagar for minimum last Five years. Bidder to
submit document to evidence the same.
4) The drivers to be deployed by the Bidder for operating Utility Vehicle must be stationed locally at
near Production sites locations. Bidder to submit the details of the same.
5) Bidders should possess a minimum of continuous last Five (5) years of experience (will be counted
backward from the bid due date) for providing hiring of four-wheeler vehicle on a monthly basis
with minimum of 6 vehicle having work order value of Rs.2,40,000 per month in Gujarat. Out of these
Five (5) years, minimum one (1) year experience is required in which Bidders must have provided
more than 6 vehicles to one organization. Bidder to submit documents such as Contracts/Work
Orders/Completion Certificate to evidence the same.
The similarity and suitability of the experience shall be assessed by GEL on the basis of
documentary proof furnished by Bidders. GEL may make cross-reference to confirm the
documentary evidences.
Experience of only the bidding entity shall be considered. In-house work experience (where for
the past experience referred for qualification, the contractor/ sub-contractor and the owner
belong to the same organization) shall not be considered as valid experience for the purpose of
6) The bidders must own minimum Six (6) any commercially registered Vehicles in the name of
company / firm name under prevailing motor vehicle act with comprehensive insurance cover of
each vehicle. Bidder to submit valid - RC book, PUC, Fitness Certificate and Insurance policy copy of
each vehicles as documentary proof.
7) Bidder to submit following Undertaking on his letterhead, duly signed and stamped.
Bidder to undertakes & confirm to deploy New Vehicle (No older than One 1 month) under the
contract awarded to him and shall submit the vehicle documents to GEL before deployment.
Bidder does not have any existing litigation with regard to the business of tender service
Bidder is never blacklisted, terminated by any GEL & its Group companies or by any companies
under Government of Gujarat.
Bidder to confirm that he has never filed any law suits or requested arbitration with regard to any
Contract within the last five years with PSU or Govt. Companies.
No judgment, claim, arbitration proceeding or suit pending or outstanding against the bidder or
Bankruptcy was never filed by the bidder, its subsidiaries or its parent companies
The bidder was never cited by any regulatory agency for a safety violation in the last five years.
Bidder will comply with all the applicable rules and regulation and as amended thereto, from time
to time for payment to its drivers, helps, cleaner deployed for the tendered services as per the
prevailing statutory obligation at his own cost including labour laws.
8) Bidder to submit details of Base from where he intends to provide this Service which shall be in
Ahmedabad or Gandhinagar only.
— Bidders are requested to seek pre-bid clarifications to any of their exception / deviations before
submission of the bid, this is to avoid longer time in concluding of exception / deviations post bid
or rejection of the bids.
— GEL may seek clarification / missing information / documents on the above Criteria and in the
event the bidder is unable to satisfy/submit to GEL’s queries within specified time line, the Bid
may be technically disqualified. In the event it is found that Bidder has submitted falls information
/ documents or has misled the GEL, the bidder shall be disqualified.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 54 of
COMMERCIAL PRICE BID EVALUATION CRITERIA
Only the responsive bids conforming to the above-mentioned bidders eligibility criteria and technical –
bid evaluation criteria will be considered for further evaluation.
Prices quoted shall be in Indian Rupees.
It shall be bidder’s responsibility to quote the correct SAC Code / Goods & Service Tax (GST) % /
Amount, this cost will have to be borne by the bidder.
To identify the commercially lowest evaluated bid (L1 Bidder) from the technically qualified
bidders, total sum values quoted for each Part – A, B, C, D, E & F for award of Contract to the L1
Commercial Evaluation of Bids for awarding the contract shall be done solely based on price
substantiality and commercially most advantageous offer.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 55 of
VENDOR REGISTRATION FORM (for new vendors)
Vendor Registration Form to be submitted by the bidder along with bid bond
Vendor Registration Form (to be filled by the Vendor in preferably in Excel format and submitted soon
after making bid bond remittance).
The form filled by the vendor should be sent by email to the following mail ID’s
[email protected]; [email protected] and copy to [email protected]
GUJARAT ENERGY LIMITED
(New Vendor Registration Form)
Date of Formation
Registration Information (please provide self-certified copies of registration certificates as proof)
Excise Registration No.
Excise Range No.
Excise Division No.
Excise Collectorate
Micro Small Medium Enterprise YES / NO
If Yes then provide Details
Works Contract Tax Registration No.
Tax Deduction account Number (TAN)
Permanent account no. (PAN) **
CST Number with Date
LST / VAT Number with Date
GSTIN Number **
Service Tax Registration No.
** To be filled (Compulsory fields)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 56 of
Title of Account in the Bank
Bank Account Number
Name of the Bank
Address of the Bank
Telephone No. with STD code
Fax No with STD Code
Bank Branch MICR Code
Bank Branch IFSC Code
Mode of Payment RTGS / NEFT /IMPS
CHECK LIST OF DOCUMENTS TO BE SUBMITTED ALONG WITH THIS VENDOR REGISTRATION
FORM BY THE BIDDER
VENDOR REGISTRATION FORM (Preferably In Excel format)
GST Certificate
MSME Certificate
Cancelled Cheque
For F&A Department use only
Purchasing Organization
Accounting Group
Reconciliation Account
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 57 of
Self- Declaration Cum Undertaking
The Bidder undertakes that:
1. The Bidder is not on a holiday list or is black listed by GEL or any of the Group Companies of GEL.
2. Bidder has not initiated any legal action/litigation against GEL or any of the Group Companies.
The Bidder agrees and acknowledges that in the event after the issuance of LoA/Work Order/award of
Contract, it is discovered/found by GEL that any of the conditions stated in the above Undertaking
furnished by the Bidder at the time of bidding is found to be false or any event mentioned in such
undertaking occurs after the award of the Contract, GEL shall have a right to terminate the Contract
immediately at its sole discretion, including its right to forfeit the Performance Bank Guarantee (PBG).
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 58 of
CHECKLIST WITH DETAILS FOR SUBMISSION OF DOCUMENTS FOR BID EVALUAITON CRITERIA
TO BE FILLED BY BIDDER
Sr Documents to be submitted Documents Number Confirmation
No Please mention the of submission
details of documents
BID BOND: Bid Bond details. - Bid Submitted/Not
Bidder to Confirm the submission of Bid Bond Bond Exemption shall be submitted
provided to eligible
bidder as per terms of
Micro and Small
Copy of latest MSME/UDYAM Certificate (if MSME/UDYAM Submitted/Not
2. applicable, please attach the Certificate with Certificate number submitted
latest year classification of your entity)
Copy of IT PAN (as applicable, if not applicable IT PAN number Submitted/Not
please clarify) submitted
Copy of Goods & Service Tax Registration No. Goods & Service Tax Submitted/Not
(as applicable, if not applicable please clarify) Registration No submitted
5. Copy of Provident Fund Code No. (as Provident Fund Code No. Submitted/Not
applicable, if not applicable please clarify) submitted
6. Copy of ESI Registration No./ WC (as ESI Registration No. / Submitted/Not
applicable, if not applicable please clarify) WC as applicable submitted
7. Bidder to submit on his letter head duly Details on Letter head Submitted/Not
stamped and signed the Bidder’s Information duly stamped and signed submitted
as per attachment (Name, Address, Tel No. Fax. including Excel sheet
No. Email ID, Bank Account Details, Name of with data to be uploaded
Proprietor, Partners, Directors, Bidders
Authorized representative, Name and Contact
8. Acceptance to Tender Terms and Conditions: Letter confirming Submitted/Not
Bidder to Submit stamped/signed copy of this acceptance of terms and submitted
Tender or Undertaking/Confirmation on conditions of the tender
letterhead in token of unconditional acceptance or
to the terms and conditions therein or may Sign and stamp on each
submit exceptions/deviations as allowed under page of tender
the ITB. (As per Exhibit-D).
9. Financial Average Annual Turnover a certificate from the Submitted/Not
Financial Average Annual Turnover of the Chartered Accountant / submitted
bidder for the last three financial years. Cost Accountant (With
Documentary evidence in the form of certified UDIN) indicating the
Audited Balance Sheets of relevant periods or a turnover details for the
certificate from the Chartered Accountant / Cost relevant period
Accountant (With UDIN) indicating the turnover
details for the relevant period shall be uploaded
with the bid. In case the date of constitution /
incorporation of the bidder is less than 3-years-
old, the average turnover in respect of the
completed financial years after the date of
constitution shall be taken into account for this
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 59 of
10. Net Worth of the Bidder should be positive for Submit Chartered Submitted/Not
the last financial year (Submit Chartered Accountant Certificate submitted
Accountant Certificate (With UDIN) for the (With UDIN)
11. The Bidder shall not be on holiday list/ Bidder shall submit self- Submitted/Not
black-listed by GEL or any of the Group declaration certificate submitted
Companies of GEL. Bidder shall submit self- /undertaking confirming
declaration certificate /undertaking in this that The Bidder shall not
regard as per attachment. If found, GEL shall be on holiday list/ black-
have a right to terminate the Contract without listed by GEL or any of
any notice including its right to forfeit the the Group Companies of
Performance Bank Guarantee (PBG). Bidders GEL
who have initiated legal action/litigation
against GEL or any of the Group Companies shall
not be considered.
12. Bidder must submit the quote as per the price Blank Prices schedule Submitted/Not
schedules for all the tendered blocks and submit with “Quoted “to be submitted
the unpriced bid (technical bid) with remarks of submitted on letter head
shall be treated as your confirmation that you
considered all the line items therein for arriving
/quoting of total all-inclusive Price and have
also uploaded/attached in your Financial
Prices as breakup of quoted amount.
13. The Bidder must bid on sole performance basis Confirmation of bidding Submitted/Not
and no agreement/MOU with any other party on sole performance submitted
for joint operation shall be allowed/considered. basis on letter head
14. Experience Criteria Confirmation of Submitted/Not
Documents required to be submitted in the submission of supporting submitted
unpriced bid to substantiate the above- documents
mentioned experience are:
Bidder should submit copies of contract(s)
- Name of Company with complete address
- Duration (start & end) of contract.
- Documentary evidence in respect of
satisfactory execution of those contracts
in the form of copies of any of the
following documents (indicating
respective contract no.), such as:
satisfactory completion
/performance Certificate
Purchase or Work Order Or signed
Return letter of PBG
Any documentary evidence that can
substantiate the satisfactory execution of the
contracts cited above
15. Declaration of no deviations/ exceptions Bidder to submit Submitted/Not
declaration of no submitted
deviations/exceptions as
per Attachment-2.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 60 of
Self- Declaration Cum Undertaking
1. I/We hereby certify that, I/we have read the entire terms and conditions & specifications of
the BID document (including all documents which have been attached in this Bid like Scope of
Work, Model Contract, Payment terms, Liquidated Damages Clause, corrigendum or any other
document) which will form part of the contract agreement and I/we shall abide hereby by the
terms and conditions & specifications/clauses contained therein.
2. The corrigendum(s) issued from time to time by your department/organizations related to
this BID too have also been taken into consideration, while submitting this acceptance letter.
3. I/We hereby unconditionally accept the BID terms and conditions & specifications including
Scope of Work and any other document (which is/are attached in Bid Document) of above-
mentioned BID document/corrigendum(s) in its totality/entirety.
4. I/We certify that all information furnished by our firm/company is true & correct and, in the
event, that the information is found to be incorrect/untrue or found violated, then your
department/organization shall without giving any notice or reason therefore may summarily
reject the bid or terminate the contract, without prejudice to any other rights or remedy
including the forfeiture of the full said earnest money deposit absolutely.
(BIDDER TO USE THE ABOVE FORMAT ONLY, FOR SUBMISSION.
NO OTHER FORMAT SHALL BE ACCEPTED)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 61 of
[ON LETTER HEAD OF THE BIDDER]
Self- Undertaking / Confirmation
a) I/We do not have any criminal case lodged against us within last five (5) years. I/We self-certify
that there is no criminal case/theft recorded, nor involvement of any of the partners/directors
in any such cases while performing the services in last two years. (To this effect, Bidder to
submit undertaking along with copies of respective contracts, and documentary evidence in
respect of satisfactory execution of each of those contracts, in the form of copies of any of the
documents (indicating respective contract number and type of services), such as - (i)
Satisfactory completion/ performance report (OR) mentioning no criminal case lodged against
the bidder for performing the services (ii) proof of release of Performance Security after
completion of the contract (OR) (iii) proof of settlement/release of final payment against the
contract (OR) (iv) any other documentary evidence that can substantiate the satisfactory
execution of each of the contracts cited above failing which the GEL may reject the bid.
b) Bidder to undertakes & confirm to deploy New Vehicle (No older than One 1 month) under the
contract awarded to him and shall submit the vehicle documents to GEL before deployment.
c) Bidder does not have any existing litigation with regard to the business of tender service
d) Bidder is never blacklisted, terminated by any GEL & its Group companies or by any companies
under Government of Gujarat.
e) Bidder to confirm that he has never filed any law suits or requested arbitration with regard to
any Contract within the last five years with PSU or Govt. Companies.
f) No judgment, claim, arbitration proceeding or suit pending or outstanding against the bidder or
g) Bankruptcy was never filed by the bidder, its subsidiaries or its parent companies
h) The bidder was never cited by any regulatory agency for a safety violation in the last five years.
i) Bidder will comply with all the applicable rules and regulation and as amended thereto, from
time to time for payment to its drivers, helps, cleaner deployed for the tendered services as per
the prevailing statutory obligation at his own cost including labour laws.
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 62 of
CUT-OUT SLIP for Bid Bond
Client : Gujarat Energy Limited
TENDER No. : GEL/ADM/Hiring Utility Vehicles/2026-27/639
TENDER Title : Hiring of Utility Vehicles for Production Sites & GEL Warehouse.
Bid Due Date : ___/ ___/2026 (1700 Hrs (IST))
Bidder's Name & Address Durgadatta Rautaray – AM (C&P)/Alpesh Shah – AGM (C&P)
Gujarat Energy Ltd.
05th Floor, South Wing, Gujarat Energy Bhavan,
Behind Udyog Bhavan, Sector-11,
Gandhinagar-382 010, India
(To be pasted on the envelope)
Tender: GEL/ADM/Hiring Utility Vehicles/2026-27/639 Page 63 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender-GEL-ADM-Hiring Utility Vehicles-2026-27-639.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .