Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹33.7 L
EMD Value
₹33,655
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
In the existing storm water drainage network in the as per the requirement, new catch pits will be constructed, storm water drainage lines will be laid, broken catch pits/machine holes will be constructed, breakdowns related to storm water drainage lines and other necessary works will be carried out. West Zone Vasna Ward.(ARC)
367243
3/26-27 (T.N. 39)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹33,655
19 Nov 2026
19 Nov 2026
19 Nov 2026
26 Nov 2026
19 Nov 2026
120 days
Name of Work :- In the existing storm water drainage network in the as per the requirement,
new catch pits will be constructed, storm water drainage lines will be laid, broken catch
pits/machine holes will be constructed, breakdowns related to storm water drainage lines and
other necessary works will be carried out. West Zone Vasna Ward. (ARC)
Excavation for pipe line trenches for water supply,
sewerage lne, manhole etc. all with shoring and
struting if required as per required gradient and
line including safety provisions using site rails and
stacking excavated stuff including up to all
required lead cleaning the site etc. complete for
all lifts and strata as specified.
350.00 Upto 1.50 mt depth
35.00 1.5 mt to 3 mt depth
4.00 3.00 mt to 4.50 mt depth
1.00 4.50 mt to 6.00 mt depth
Extra rate over item of excavation of earth for
2 excavation of asphalt pavement/RCC of thickness
up to 0.20 meter including demolishing the -
asphalt carpet,metal,soiling /cutting reinforcement
etc.comp. with stacking the material as directed.
up to 0.20 meter thickness (By Manual)
140.00 Up to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including cost 178.57 Smt
of operator, fuel, & transportation etc complete.
7.00 0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost 312.50 Smt
of operator, fuel, & transportation etc complete.
3 Refilling the pipeline trencheds incl. ramming,
watering, consolodating desposal of surplus stuff -
as directed within a radius of 3 km.
Refilling as directed
4.00 --do-- with selected soil brought from outside 175.00 Cmt
including all lead
Conveyance charge of earth,lime,murrum,
4 275.00 building rubbish,manual garbage,sludge 326.73 Cmt
,excavated rock,fly ash, aggregate of any kind
etc. comp. up to 5Km. lead
Providing and supplying ISI marked only standard
length Stonewate pipes in standard lengths of
5 0.00 following class and diameter including all
taxes,insurance, transportiton, fright charges, -
octroi,inspection charges, loading,unloading,
conveyance to departmental stores, stacking etc.
Lowering, laying and jointing stone ware pipes of
following diameters with cement joints in C.M.1:1
6 0.00 proportion in proper position , grade and
alignment at all level as directed by Engineer-in- -
charge including conveyance from stone to site of
work, Jointing material etc.comp.
Providing and supplying ISI Standard RCC pipes
(of sulphate resisting Cement )in standard lengths
of following class and diameter suitable for rubber
ring joints (socket and spigot) including all -
taxes,insurance, transportation,treight
charges,octroi, inspection charges,
loading,unloading, conveyance to departmental
stores, stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm -
Lowering, laying and jointing R.C.C. pipes in
C.M.1:1 1/2 of following diameters in proper
8 0.00 position , grade and alignment at all level as
directed by Engineer-in- charge including -
conveyance from stone to site of work, labour
giving hydraulic testing as per ISI code.
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm
9 0.00 thick cement plaster inside in CM 1:3, finishing -
with cement slurry, Brick masonary in CM 1:5 &
excluding the cost of chamber seat cover
etc..completed.
10.00 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 2261.60 No
to 0.90meter for pipe dia <=150 mm.
0.00 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 2874.10 No
to 0.90meter for pipe dia <=20 mm. -
10.00 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 3905.35 No
to 1.20 meter for pipe dia <=20 mm
Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness
C.M., finished 15 mm thick cement plaster inside
& outside (Only for shaft) In Cm 1:3, Finishing
With Cement Slurry, P/F 4 Mm Dia M.S.Steel
10 0.00 Hdpe Coated Steps 35 Cm C/C At 35 Cm -
Staggered Masonary In Cm 1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.)But Excluding The Cost
Of Manhole Seat Cover Etc..Completed Of Size
0.75 X 1.00 Meter (Inside Clear, M.H. length
should be parallel to the flow)
15.00 1.00 to 2.00 meter depth, (Slab at Ground level) 5651.78 No
(for pipe dia <=230 mm)
5.00 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. 11395.54 No
From G.L.) (for pipe dia <=300 mm)
Rate reduction over item of Constructing Slab
Type M.H. Chamber of size 1.00 x 0.75 mt for
11 1.00 constructing slab @ depth more than 0.60 mt 460.71 DM
below Ground Level (Max. 3 unit of DM should be
reduced in this item)
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) in CM 1:3, finishing with
12 0.00 cement slurry, P/F 4 mm dia M.S.Steel HDPE
coated steps 35 cm c/c at 35 cm staggered in -
masonary CM 1:5, RCC Slab in CC 1:1.5:3 of
thickness 23 C.M., including Cantering &
reinforcement (double jalli at 15 C.M. c/c bothway
12 mm dia.) but excluding the cost of Manhole
seat cover etc..completed. of Size 1.00 X
meter (Inside Clear, M.H. length should be
parallel to the flow, for pipe dia <= 800 mm)
1.00 to 2.00 meter depth, (Slab at Ground level)
4.00 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. 19258.04 No
1.00 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. 26867.86 No
0.00 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. 44050.00 No
0.00 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. 66632.14 No
Extra rate over item of Constructing Slab Type
13 0.00 M.H. Chamber of following size for constructing
M.H. Chamber, per 1.00 Decimetre of additional -
depth or part thereof. etc. complete. Of size
x 1.40 mt. (inside clear) and Depth from
4.00 to 5.00 meter depth,
6.00 to 7.00 meter Depth
8.00 to 9.00 meter Depth
9.00 to 10.00 meter Depth
Rate reduction over item of Constructing Slab
Type M.H. Chamber of size 1.00 x 1.40 mt for
14 1.00 constructing slab @ depth more than 0.60 mt for ( 586.60 DM
MH 2 to 3 mt depth) and 1.0 mt for (MH above
3.0 mt depth) below Ground Level (Max. 5 unit of
DM should be reduced in this item)
Dismantling of existing Arch type manhole up to
Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in CM
15 0.00 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps
35 cm c/c at 35 cm staggered in masonry CM 1:5,
incl. cost of RCC Slab in CC 1:1.5:3, including
Cantering & reinforcement as directed by
engineer in charge. Rate includes carting of
debris and excavated soil
1.00 x 0.75 mt (inside clear) RCC Slab of
10.00 thickness 15 C.M& reinforcement (Single jali at 5892.85 No
15 CM c/c bothway 10 mm dia.) From 0 to 2 mt
depth (Slab at Ground level)
1.00 x 0.75 mt (inside clear) RCC Slab of
4.00 thickness 15 C.M& reinforcement (Single jalli at 8883.92 No
15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt
depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of
6.00 thickness 23 CM & reinforcement (double jalli at 8080.35 No
15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt
depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of
10.00 thickness 23 CM & reinforcement (double jalli at 17008.93 No
15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt
depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of
3.00 thickness 23 CM & reinforcement (double jalli at 24776.79 No
15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt
depth (Slab at below 1.00 mt. From G.L.)
Provdg. & laying S.W. Gully trap with brick
16 5.00 masonry chamber & water tight G.T.Stone 1279.40 No
including fixing of cover Square mouth trap 100
mm x100 mm size P-Trap
Making connection to the ex. MH in running
17 0.00 sewer incl. dewatering and other required
machinery etc. of following dia pipes at any -
convenient time. All damaged work shall be well
repaired as per instructions. etc.complete.
a. 150 mm to 300 mm dia.
b. 400 mm to 600 mm dia.
Cutting the pipes of following dia coming in the
new M.H.in running sewer including cutting
bars, including removing debris /silt from the
18 0.00 M.H. and carting at a suitable distance -
etc..complete as directed. No payment for M.H.
work will be made until pipe is not cut completely
in all respect.
150 mm to 300 mm dia.
400 mm to 600 mm dia.
Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
19 0.00 repairing by brick masonry in C.M. 1:5 and -
plaster in C.M. 1:3 and fixing C.I. steps and
existing MH sheet cover, removing the debris
from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick
20 34.00 masonry in C.M. 1:5 and plaster in C.M. 1:3 401.78 No
and fixing C.I. steps and existing chamber
sheet cover, removing the debris from chamber
and carting the same as directed.
RCC Precast M.H.Frame & Cover Manufacture
supply & Delivery at store or at side of work
21 0.00 Precast RCC M200 Frame & Cover Suitable to
drainage M.H. and as per type design & Drawing -
including cost of reinforcement M.S. Angles or
Flat , cutting mold work etc.
Frame Suitable for 50 Cm opening of MH
Cover Suitable for 50Cm Opening Of MH
Frame Suitable for 50 Cm opening of MH
Cover Suitable for 50Cm Opening Of MH
House connection Chamber Light Duty -
Carting and Fixing M.H. Chamber or Catchpite
Seat and Cover in line and level to match
22 50.00 exisisting road level in CC 1:2:4 and finishing 750.00 No
smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be
supplied byA.M.C.(from any store)
Providing Kachha of Pakka Dummy in the
23 0.00 following dia pipes and removing the same
after completion of the connection work as -
(A) 100 mm to 300 mm dia.
(B) 350 mm to 600 mm dia
Providing and fixing cast iron manhole frame of
weight 80 to 85 kg suitable for existing EHD-35
FRC MH cover, rate also incl. loading, unloading
24 275.00 and fixing the frame in line and level to match 71.42 Kg
exisisting road level in CC 1:2:4 and finishing
smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
Raising of Existing manhole item includes,cutting
of existing road surround by Manhole by diamond
cutter machine dismantling of road in confined
area by breaker machine and carting of dismantal
material.item also included necessarey brick work
to raise the manhole at road level in CM 1:3 item
also included fixing of Manhole frame at exact
road level by using MaserEmaco S 488 trowable
25 3.00 fibre reinforced thixotropic repair mortal material 6830.35 No
Laying of concrete made form Master Emaco 5
346 flowable micro concrete material in desired
thickness and laying of hot bitumanous material
in Upper layer and compaction of hot bitumanious
material by palte compactor machine .Rate also
included necessary plaster at inside of manhole
in CM 1:3 in 20 MM thickness on raised
Brickwork using common burnt clay building
bricks having crushing strength notless than
26 1.00 35kg./Sq.Cm. in foundation and plinth in Cement 4011.66 Cmt
Mortar 1:5 (1-Cement:5-finesand) (B)
Conventional (upto 10 ton)
Supplying, labour for break down repairing work
27 0.00 for activities like excavation, disliting, removing
debris from trench back filling etc. comp. as -
directed by Eng.in charge.
Mazdoor at day /Night
Makadam/ supervision at day / Night
Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
28 3.00 thickness and size including placing the nece. 312.50 Smt
supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per
standard engg. practice etc. comp. as directed.
Providing 15mm thick cement plaster in single
coat on Rough (Similar)side of single or half brick
walls for interior plastering upto floor two level
29 20.00 and finished even and smooth in (i) Cement 174.83 Smt.
mortar 1:3 (1- cement:3-sand) finishing with a
floating coat of neat cement slurry.
Supplying cutting, bending, binding and placing in
position steel as per plan and design and as per
30 1.00 IS 2502 including cost of steel and binding wire 73208.00 MT
for reservoirs/ structuresonly including lift up to
meter height or depth below GL for all diameters
TMT bars Fe-415 grade for alldiameters
Providing and caste in situ CC in grade M
using granite quadrite tap metal of size 6 mm to
20 mm for RCC work including scaffolding
centreing form work needle vibrator consolidation
31 1.00 curing complete up to 6 m dep or height 5292.00 Cmt
(excluding cost of rangeforcement and need
finishing) with centering and shuttering/d
shuttering etc complete for structure other than
water retaining
Providing and installation of barricading with
retro-reflective paint/ film/ tapes (Minimum 3.0Mt.
height) as specified in the drawing &
specifications for the construction of road work,
along with necessary diversion arrangement for
existing traffic movement in an unobstructed
condition, all relevant markings, sign boards and
illumination as per relevant MORT&H
specification. Precoated galvanised iron profile
sheets shall be of approved make and shade
having 0.50 mm (+0.05 %) total coated thickness
with zinc coating 120 grams per sqm as per IS:
277, in 550 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester top
coat 15-18 microns. Rate to be inclusive of all
materials, fabrication works, paint works for
information (retro reflective paint), foundation
works, transportation, loading, unloading,
installation, dismantling and inclusive of all taxes
and including the same design for providing
openable gates. No extra rental will be given to
the contractor in case of any delays from his part
for construction or due to any valid time limit
extensions. Each barricading sheet is to be
numbered with a unique number. The barricading
provided shall be retained in position at site
continuously i/c shifting of barricading from one
location to another location as many times as
required during the execution of the entire work
till its completion. Rate include its maintenance
for damages, painting, all incidentals, labour
materials, equipments and works required to
execute the job. The barricading shall not be
removed without prior approval of Engineerin-
Charge. (Note :- One time payment shall be
made for providing barricading from start of work
till completion of work i/c shifting. The barricading
provided shall remain to be the property of the
contractor on completion of the work). Blinkers
are to be installed on the barricading and rate for
blinkers will be payable as per relevant item.
Barricading is to be cleaned by means of
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
33 50.00 avoid accident & for smooth traffic diversion & 80.35 Rmt
movement including cautionary board etc. Item
also includes for making temporary sufficient nos
of lighting arrangement through out the work with
necessary required arrangement. ..The same
shall be removed after completion of work. (Only
for break down work from start to complete)
Providing and erecting CI and Ms ventilating
columns under centimetres Dia with CI
ornamental cap and minimum 6 m height (height
maybe very as per site) Bass fix family with
34 0.00 necessary foundation with one court of red lead 33836.00 No
oxide paint and one cot of any approved Colors -
with 15 CM Dia 10 m in length with 0.35x0.35 mt.
M 100 MK Singh stoneware or RCC pipe
connection with image including exclusion and
jointing as required etc completed as per drawing
For 6 mt. Height (6 mt. MS Pipe)
Providing and fixing M.S. grills of required pattern
35 135.00 to wooden frames of windows etc. with M.S. flats 100.17 Kg
at required spacings and frame alround, square
or round bars with round headed bolts and nuts
or by screws (A) Plain Grill. (upto 10 ton)
Providing and operation dewatering Pump
36 5.00 including fuel charges & operator Charges etc. as 600.00 Shift
directed etc. comp. (Shift for Eight Hour) (For
Each Pump Set, No payment should be allowed
for non working condition of machinery)
Hiring and operating Mud Pumps incl. Cost of
fuel and operator including the cost of to and fro
37 3400.00 transportation, laying of the delivery hoses as 18.32 H.P/Hr
required, lowering and lifting the pumps as and
when required etc. complete. Set Do As
Directed. (No payment should be allowed for
non working condition of machinery )
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery,
38 20.00 and lighting and other requirements with 2800.00 Shift
Arranging diesel to run the D.G. Set Do As
Directed. 8 Hrs Shift. (No payment should be
allowed for non working condition of machinery )
Providing & Supplying JCB Machine on rental
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge, rate
39 100.00 includes all nece. shifting, fuel and operating 711.86 Hour
charges and stacking of useful & non-useful
materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and
Providing & Supplying Hitachi Machine -110
capacity on rental basis in case of emergency
situation and break down type work & also during
40 1.00 unavoidable condition as per instruction of 2000.00 hr
engg.incharge , rate includes all nece. shifting,
fuel and operating charges . (No payment should
be allowed for non working condition of
Providing & Supplying Hitachi Machine -200
capacity on rental basis in case of emergency
situation and break down type work & also during
41 1.00 unavoidable condition as per instruction of 2700.00 hr
engg.incharge , rate includes all nece. shifting,
fuel and operating charges. (No payment should
be allowed for non working condition of
Providing & Supplying hydra carne Machine of
tone capacity on rental basis in case of
emergency situation and break down type work &
also during unavoidable condition as per Per
42 1.00 instruction of engg.incharge , rate includes all 3334.49 hr
nece. shifting, fuel and operating charges . (No Shift
payment should be allowed for non working
condition of machinery)
Supplying electric breaker machine for RCC slab
or asphalt demolishing work on site by using
operator, fuel, power supply etc.complete as
43 25.00 directed. (no payment should be allowed for non 1200.00 Shift
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
Supplying Pneumatic Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete
44 6.00 as Directed. (No payment should be allowed for 600.00 Hr
non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for
break down work)
Provide Tractor with Hydraulic trolley, driver with
fuel to carryout different works during day/night
45 20.00 for 8 Hr. shift Work shall be carried out as per the 2104.09 Day
instructions of engineer in charge. No Extra
charged shall be paid for night shift.
Hiring of Three wheeler carrier (Chakado/Rixa)
46 25.00 considering 10 Hrs. as working day hours 1153.24 Day
Levelling or orientation of existing gully trap
chamber incl. Nece. masonry in CM 1:6 and
plaster in CM 1:3 etc. using old G.T.stone and
cover etc. comp.
Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick
maso. wall in the prop. of CM (1:6) with 40 mm
48 50.00 thick IPS flooring in the prop M15 at bottom and 3125.00 No.
15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc. comp.
Dismentaling tiled of stone floors laid in mortar
49 5.00 ncluding stacking of serviceable materilas and 47.25 Smt
disposal of unserviceable materials with all lead
CatchPit Jali Fixing P/F FRC catch pit jali with
frame clear opening opening etc. comp.. As
50 directed directed by engineer in charge. -
F.R.C. Strom Water Grating Set:-Grating(Jali):
740 x 740 x 90 mm square jali, 20:00 MT load
design, 90 x 2 mm MS flat allround, Frame: 600 x
a 10.00 600 mm clear opening, outer size- 900 x 900 x 6105.00 Set
165 mm. On the upper periphery of frame 25 x
3mm wide MS flat should be well embded in
concrete to protect the edges of frame
F.R.C. Strom Water Grating Set:-Grating(Jali):
690 x 690 x 70mm square jali, 20:00 MT load
design, 70 x 2 mm MS flat allround, Frame: 600 x
b 10.00 600 mm clear opening, outer size:- 800 x 800 x 5595.00 Set
120 mm. On the upper periphery offrame 25 x
3mm wide MS flat should be well embed in
concrete to protect the edges of frame.
F.R.C. Strom Water Grating Set:-Grating(Jali):
620 x 620 x 75 mm square jali, 20:00 MT load
design, 75x1.2mm MS flat allround,Frame: 500 x
c 30.00 500mm clear opening, outer size- 770 x 770 x 5587.00 Set
135 mm. On the upper periphery of frame
x1.5mm wide MS flat should be well embed in
concrete to protect the edges of frame.
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
Tender Fee Rs.1500.00
Earnest Money Rs.33,655.00
Contractor’s Name & Address :
MEMORANDUM OF WORK IN BRIEF
In the existing storm water drainage network in the as
per the requirement, new catch pits will be constructed,
1. Name of Work storm water drainage lines will be laid, broken catch
pits/machine holes will be constructed, breakdowns
related to storm water drainage lines and other
necessary works will be carried out. West Zone Vasna
Rs. 33,65,270.93 (exclusive of GST). GST will be paid extra by
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form
3. Earnest Money (D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.1500.00
6. Time-Limit 12 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “E1” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
(i) Last Date of Submission of the Tenders from the AMC website www.amc.nprocure.com &
9 www.nprocure.com shall be down loaded from AS PER TENDER
Tender NOTICE INVITED
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates t shall not be submitted Physically.
10 Date of Opening Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER
Tenders from the AMC website www.amc.nprocure.com &
Place of Submission & Opening of
11. www.nprocure.com shall be down loaded from AS PER TENDER
Tender NOTICE INVITED
Submission of EMD. Tender fee and other Documents at West
Zone, 2nd Floor, A.M. Office, Stadium Sub Zonal Office, Nr. Panchshil
Water Tank, Naranpura Railway Crossing Ahmedabad
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
12 Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
13 Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
14 Time permitted to start parts of
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract fine
of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out he
works without proper precautions/safety measures as equired will
attract a fine of Rs. 5,000/- for each incident.
16 Defect &Liability Period The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards the
expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified
date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall
be 12 months from the certified date of completion which should
include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
17 Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether
work minor or major of part thereof of any amount, the contractor
shall be bound to start the works within 48 hours of intimation
of work. Communication done telephonically via SMS, Via
Whatsapp and through letter / E-mail shall be considered legal
and binding for the same. Failure of comply to start the works
in 48 hours of intimation as above by contractor the contractor
shall be levied penalty of (1) Rs.1000/- per day (for tenders
amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders
amounting above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amounting above 30 Lakhs). Three times
failures by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in writing /
binding within 15 days of last notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The
Tender Document.
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Addl.C.E.(west zone)
AMCFinancedept.circular No –41,Dt.08/02/2022
(A) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDonpermanentbasis.
(1) AllNationalizedBanks
(B) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDfortheperiodu
ptoMarch-31,2022.Thevaliditycut-
offdateintheGRiswithrespecttothedateofissueofBankGuaranteeirrespectiveofthe
dateofterminationofBankGuarantee.GuaranteesissuedorAuthorizedbyAhmedab
(1) CommercialBanks:
(5) KotakMahindraBank
(6) IndudIndbank
(8) TamilnaduMercantileBank
(9) UjjivanSmallFinancebank
(10) AUSmallFinanceBank
(11) FedaralBankBank
(12) EquitasSmallFinancebank
(13) BandhanBank
(14) StandardCharteredBank
(2) Co-Operative&RuralBanksofGujarat
1. TheMehsanaUrbanCo-operativeBankLtd
2. TheAhmedabadMercantileCo-OperativeBankLtd
3. NutannagrikSahakariBankLtd
4. TheKalupurCommericalCo-operativeBankLtd
5. RajkotNagarikSahakariBankLimited
6. TheGujaratStateCo-OperativeBank
8. SaurashtraGraminBank
SealandSignatureoftheBidder
AddlCityEngineer
NOTICE INVITING TENDER (NIT)
TERMS&CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
(B)GENERALTERMS&CONDITIONS
(C)FINACIALTERMS&CONDITIONS
(D)MAINCONDITION/FETURESOFTHEWORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender fee &
EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope
(marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand
Delivery in duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for
the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received for
the package (except those received late) containing the sealed Tender volume and other enclosures then
announce the names of bidders in the presence of bidders or their representatives who choose to attend
on the date and time mentioned in the NIT In the event of specified date of bid opening being declared
as a holiday for the Employer, the Tender will be opened at the appointed time and location on the next
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at
the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of
EMD furnished with each bid, is valid registration and such other details, as the Employer may consider
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation
for Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-
responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid
EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall
be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied by
the requisite certificates, undertaking and other relevant information specified in the bid documents and
is substantially responsive to the requirement of the bidding documents and provides any clarification
for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance
with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria then
bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that
such bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General
Terms and Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms
and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This
letter shall name the sum which the Employer will pay the Contractor in consideration of the execution,
completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving letter
of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his bid.
Such request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison
or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself
on its own responsibility all information that may be necessary for preparing the bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury, loss
of or damage to property and any other loss, damage, costs and expenses incurred as a result of the
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in
the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of contract he
shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required
to provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
The work shall be completed with 12 Months after the order to start the works.
The details of reinforcement of R.C.C. work shall be as per design and instructions of City
Engineer/Addl.City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought by
him on site. This account shall be regularly maintained and kept open for inspection by Municipal Staff.
Watering of all the items shall be as per instructions. Mixing of concrete shall be done by concrete mixer
machine. Arrangements of binding vibrator for R.C.C. works if required shall have to be made by the
The contractor shall be remain responsible for Workmen’s compensation if any when such case occurs. The
contractor shall arrange formed ampersand in night and he shall be responsible for any damage of life and
limb or property if any happen, during the execution of work. In case of dispute for unseen or overlooked
items the decision of the city Engineer/Addl.City Engineer shall be final. The contractor shall have to give
site clean of all rubbish on completion of work and have over the building with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this risk and
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare
through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed to mix
the mortar either on floor or any finished surfaces.
The contractor shall have to make his own arrangement for water required for the work and shall pay the
water charges as per water meter.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by C.E . /Addl. City Engineer as per the rate analysis based on current market
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him and no claim for extra for
subsequent changes may be entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
The R.C.C. or specified work shall not be done on Sunday and holiday excepting emergency or when
technical requirements are such that continuity of work should be maintained and that to will be with prior
permission of the competent authority.
Retention money at the rate of 2% shall be deducted from every running bill of the contractor and which will
be paid at the time of final bill.
Contractor will be fully responsible for compliance of the various prevision under contract Act. 1970 and the
Rules framed for to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications (s) or addition (s) in the terms and conditions
of his tender not acceptable to the Municipal Corporation, the Municipal Corporation shall without prejudice
to any right or remedy be at liberty to forfeit in full the said earnest money absolutely.
As per Circular No. MCR 2176 (96) 2418 (ii) GHH dated 31-03-77 issued by Government of Gujarat
contractors are requested to produce their quarry materials for construction work through legal sources. i.e.
only form the quarry lease holders, permit holder or middle man who satisfies the contractor as to the
legality of the source of purchase by him on these materials.
If the work is not carried out within the specified time limit penalty will be charged applicable as per AMC
Contractor has to make his own arrangement for procurement of steel and cement.
i) Conditional tender will not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
demand draft or in cash.
iv) Condition of form B1 Standard Specification of material & code of practice will be applicable. Form
B1 & B2 can be is available in website. Condition of Form B-1 For Defect liability Clause is not applicable
V) in the Case missing/Dout,Correction or Detail Specification As Per Govt.Speecification Applicable
For this Work & As Per instruction of Engg.inchage & also General Technical Specifications for Building
Works book available from Gujarat Book Stores (Pvt.) Ltd. Sector-21,Gandhinagar,DETAILED
GENERAL TECHNICAL SPECIFICATIONS can be available from Ahmedabad Municipal Corporation
website “www.egovamc.com”.
Contractor’s Signature Add. City Engineer
General information
All individual firms must complete the information in this form. Nationality information shall be provided
for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons
are attributable to the non-performance of the contractor, consistent history of litigation awarded against
the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words)
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words)
only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or
false representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply
with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which
are not substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished by
the bidder may be in another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of interpretation of the bid, the
English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities submitted
online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and
the responses thereto shall be made in writing or by fax. A bidder may refuse the request without
forfeiting his bidder agreeing to the request will not be required or permitted to modify his bid but will
be required to extend the validity of his Bid Security for the period of the extension, and in compliance
with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the person
or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer
will declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract
by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has
engaged in corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by which
they improperly and unlawfully enrich themselves and/or those close to them, or induce others to do
so, by misusing the position in which they are placed, and it includes the offering, giving, receiving,
or soliciting of anything of value to influence the action of any such official in the procurement
process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement process
or the execution of a contract to the detriment of the Borrower, and includes collusive practice
among bidders (prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e.
public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers,
traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic
signs to be provided so that it should be visible at night. During night working hours safety in charge
personnel shall be provided with florescent jackets. This shall be Provided at no extra cost by the
bidder under attaché with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company,
follow up and getting the supply, filling the necessary test reports to the power supply company. All
official fees including security deposits and other expenses shall be of initially paid by the contractor.
AMC may support to get the temporary connection and may at its diseretien get the same
converted to permanent connection at the same of AMC if desired do,and contractor shall as no
extra cost support the same. In this case AMC my be as the remaining cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon
any agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty
shall give the Municipal Commissioner the right to cancel the contract or to take any other measure
as the Municipal Commissioner may deem fit. The warranty does not apply to commissions payable
by the contractor to establish commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or
to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under
this Contract against the contractor the same may be deducted by the Municipal Corporation from any
sum then due or which at any time thereafter may become due to the contractor under this contract and
failing that under any other contract with the Municipal Corporation or from any sum due to the
contractor with the Municipal Corporation (which may be available with Municipal Corporation), or
from his retention money, or he shall pay the claim on demand. The Municipal Corporation reserves
the right to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected not withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of any
work done by the Contractor or alleged to have been done by him under the contract, it shall be
recovered by the Municipal Corporation from the contractor by way of all the means prescribed above
or if any under payment is discovered by the Municipal Corporation, any amount due to the contractor
under this contract or under payment may be adjusted against any amount then due or which may at
any time thereafter become due before payment is made to the contractor from him to the Municipal
Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of any
payment then due or thereafter to become due an amount sufficient to completely indemnify the
owner against such lien or claim or if such lien or claim be valid the owner may be or become due and
payable to the contractor. If any lien or claims remaining, unsettled after all payments are made, the
contractor shall refund or pay to the owner all money that the latter may be compelled to pay in
discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of
the contract documents. The full consideration shall be given to such addendum or corrigendum before
submission of tender duly filled in by the contractor. Therefore, the contractors shall have to kindly refer the
tender for such addendum or corrigendum published by AMC through its website www.amc.nprocure.com
& www.nprocure.com 48 hours prior to the deadline of submission of the tender. Tenderers shall verify the
number of addendum issued and enclose the same with the tender documents , failing which the tenders
shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid
for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly as
Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the
bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the
form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5% (five percent) of the
Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a policy
is framed by Audit department of AMC to charge 4% interest for the balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. & As
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding GST)
etc. on material procurement or any other component for the works from any source shall be borne by the
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be
deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with
any other state Govt. or institutions. Copy of registration should be attached with tender document.
Tenderer who was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English version)
Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean
as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific
mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the
following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant
shall not absolve the contractor from the responsibility of replacing defective materials brought on
site or materials used in the work found defective at a later date. The contractor shall have no claim
to any payment or compensation whatsoever on account of any such materials being rejected by the
Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect
before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed
from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works & all precautionary measures during execution shall
have to be kept in sufficient numbers and in good working condition at the site of the work. All
excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory evidence
that such special mode of construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the course of exaction
or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor
Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian
Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also
of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum
of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant
for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to which
work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned tender
and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall
be issue to contractor and the time limit shall be start from the date of issue of the written work order
to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft / cheque
or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract
paper with AMC. The contractor shall be fined 4% of interest per year for delay in submission of
S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C.
Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification
and the Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the
intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation.
will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the
rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor
must make his own arrangements with the Corporation and Electricity Supply Authorities and with
other contractors to connect and to take a supply from such services, paying all costs in connection
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose
of the work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the
work. No compensation shall be paid for idle labor staff, machineries and for use of diesel operating
sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance
certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby
total amount of work increases/ decreases.
total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will
be rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No
any claim to that effect shall be entertained. The Municipal Commissioner also reserves the right to
reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason (like site
is not available and due to unavoidable circumstances arise), after evaluation of situation the actual
date of starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work
done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should be in
proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and instructions
of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made
to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding
vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor
shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be
responsible for any damage to public. If any incident happen, during the execution of work. In case of
dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor
shall have to give site clean of all rubbish during the work and at the time of completion of work and hand
over the site with final finishing of the work as directed. All the rejected materials shall be removed from
site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed
to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his own
arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the contractor
will have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for
subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (180) days from the date of opening of the tenders
for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during
the period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of
his tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to
any right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start
shall be recovered separately from the immediate bills payable to the contractor. Contractor has to make his
own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable.
Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat
booklets of Building Works & and Road Works Specifications published by Gujarat Book Depot,
Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
1 Excavation for pipe line trenches for water supply, sewerage lne, manhole etc. all with
shoring and struting if required as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,concrete
and asphalt road paving work etc. Root of trees met with during excavation shall bestacked at lead of 4’
away from the trenches as per instruction so that it may not damage
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly leveled. The
excavated earth shall be stacked at any place or places shown within 50mtr. as directed. After completion
of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor lining out
and shall care to preserve the level pegs given. He shall have to arrange forshorting at his own cost if the
soil is found to be loose and sandy. He shall have to arrange forsorting out brickbats or any serviceable
materials found during excavation and shall have tostock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shownwithin 50 mtr. If so ordered by officer in charge of this work.
No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as per
drawing. Contractor should arrange for safely measures so that there is no danger offalling any men or
animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The contractor
should not damage any of the municipal property, water lines, electric cables etc.at the time of excavation.
Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such damages
will be recovered from him. Excavated stuff will be stacked at the siteshown or will be carted by the
contractor immediately as per the other item of this tender.Instructions of C.E. or his representative will be
strictly followed. Measurement shall be given onCmt.basis.
Excavationforfoundationupto(a)Upto0to2.0Mt(b)from2.0to3.0mtdepth(c)from3.0to
5.0mtdepth(d)above5.0mtdepthincludingsortingoutandstackingofusefulmaterialsanddisposalof
theexcavatedstuffupto50mt.lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,concrete
and asphalt road paving work etc. Root of trees met with during excavation shall bestacked at lead of 4’
away from the trenches as per instruction so that it may not damage
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly leveled. The
excavated earth shall be stacked at any place or places shown within 50mtr. as directed. After completion
of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor lining out
and shall care to preserve the level pegs given. He shall have to arrange forshorting at his own cost if the
soil is found to be loose and sandy. He shall have to arrange forsorting out brickbats or any serviceable
materials found during excavation and shall have tostock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shownwithin 50 mtr. If so ordered by officer in charge of this work.
No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as per
drawing. Contractor should arrange for safely measures so that there is no danger offalling any men or
animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The contractor
should not damage any of the municipal property, water lines, electric cables etc.at the time of excavation.
Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such damages
will be recovered from him. Excavated stuff will be stacked at the siteshown or will be carted by the
contractor immediately as per the other item of this tender.Instructionsof C.E.orhisrepresentative
willbestrictlyfollowed.
MeasurementshallbegivenonCmt.basis.
ItemNo.2 (a) Extra rate over item of excavation of earth for excavation of asphalt pavement /
upto0.20meterincludingdemolishingtheasphaltcarpet,metal,soiling/cuttingReinforcemente
tc. comp.withstackingthematerialasdirected.(app.rate)
(b) 0.20meterto0.30meter(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
(c) 0.30meter&above(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing
theasphalt carpet, metal, soiling etc. complete with stacking the materials as directed.
Theroad surface of asphalt shall carefully be opened to full width as directed by the
Engineerin charge Asphalt, popada's spouls, metals etc shall be separately deposited in
suchplaces as may be determined by the Engineer-in-charge. In case above materials
notbeing so deposited or being mixed up with the excavated materials will not be allowed
forrefilling.Thecostofmaterialsshallbechargedfromthecontractor.Thedecisionofthe
C.E.shallbefinalandbindingtothecontractor.
Theratepersq.mt.inthisitemshallbepaidextraadditiontotherateforexcavationMode
ofmeasurement:Therate shallbefora unitofSmtBasis.
ItemNo. Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuff
3 asdirectedwithin aradiusof3km.
Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuffasdirectedwithina
--do--withselectedsoilbroughtfromoutsideincludingalllead
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
ItemNo. Conveyancecharge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavatedrock,flyash,aggregateofanykindetc.comp.Upto5.0Km.lead
Allthe surplusearthetc.shallbecarriedawayimmediatelyfromthesiteofworktoaplacewithin
5km.distanceorasdirectedandorderedbytheEngineer,soasnottocauseanyinconvenience to the public traffic
finding which in view of public safety and traffic convenience.The Corporation shall carry out the work
by any other agency at the contractor’s risk and cost. iftheinstructions arenotcomplied within7daysfrom
thedateoforder tocart the surplusmaterials and clear the site, the said work shall be carried out by the
Municipal Corporation attherisk
andcostofthecontractorandnoclaimordisputeshallbeentertainedinthisrespect.
If the filling in trenches after settlement of the earth filling in trenches is to be done andthe
sameshall becarriedoutby thecontractorwithout asking any extra rate. The contractorshall have to cart the
surplus earth after the trenches we will watered and refilled with the sand.The rate of carting including
carting of brick bats, metal, rubble vegetable and garbage, ifnecessarytoclearthe roadsurface.
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
5-6 Providing and supplying ISI marked only standard length Stonewate pipes in standard
lengths of following class and diameter including all taxes,insurance, transportiton,
fright charges, octroi,inspection charges, loading,unloading, conveyance to
departmental stores, stacking etc. complete
A)…………do…….(b)10 cm dia
lineB)………do ..... (c)15cmdialine,20cmline
C)……………do….(c)23cmdialine
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved qualitymake
and shall be brought on site after approval. (The pipes shall be laid in grade as
perinstruction.)Contractorshall havetoprocurebillsforstandardpipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarndipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to thecontractor for testing pipes
and jointing. No trenches shall be filled without the approval of theengineerincharge.
Therateofthepipeworkareincludingofexcavationandrefilling.Theexcavationetc.
shallbedoneasfollows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on theplan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation.The sewer
excavation shall be commenced at the down stream end of the sewer and
becontinueduptothegradientasdirected.Thetrenchshallnotopenmorethan60mts.inadvanceof the completed
sewer only when directed by the engineer in charge looking to the progress ofthe work in obtaining the
formation of the bottom of the trenches the usual methods of using signrails and boning roads shall be
adopted during the whole of the process. The centre line ofuniform height shall be carried clearly on each
rail. The depth of the excavation and invert of thesewer shall be checked by means of boning road of
approved length and also by straight edge.The bed of the trench shall be well rammed before starting
laying of sewer lines and cementconcreteandmasonarywork.
Where trenches are deep in bad grounds the sides shall be supported by suitabletimbering of
shorting work looking to the nature of the soil near big or important structure, thesides of the trenches
shall be closely and securely timbered, if any settlement of the buildings inanticipated the timbering shall
be left in the ground. The various materials excavated shall beseparately stacked so that in refilling that
may be relayed on the same order as before and leastpossible damage shall be done carpet on the public
roads and private properties. Surfacecovering consisting of asphalt carpet shall be kept on side and
preserved for reinstatement. Theexcavated earth shall not be heaped near the trenches so as to caused
unnecessary obstructionalong the trenches during inspection trenches etc. shall be tunneled under only as
necessary.The side of the trenches shall be nearly vertical and plumb and red light shall be placed at
eachend at intervals and instructions and further protected by rope fence. Necessary caution
boardsshallalsobe createdandasdirectedbytheengineerincharge.
Wherever possible material excavated from the trenches of whatever kind shall not
beplacednearerthanthreemetersfromtheouteredgeoftheexcavatedtrenches.Theutmostshallhave to be taken
in refilling the trenches so that no damage may be done no sewer, no lumpshall be allowed to be put
around the sewer. The ramming of the filling shall be done and wellwatered.
The surplus earth shall be removed directed within 30 meters lead. The measurementsof the work
shall be exact length and width of the trenches as specified or as per City Engineerinstruction and depth
shall be measured vertical as per section up to invert or the pipeline. TheCity Engineer reserves the right
of extra excavation on either side if considers necessary for thesafetyofthework.
The bottom and sides of the trench shall be dressed in level and plumb in all directedbefore any
concrete is in dia. In case the excavation is done deeper than required no filling shallbe allowed to bring
the formation to proper level but contractor shall have to lay cement or
limeconcreteoffilingorotheracceptablematerialsasdirectedbytheCityEngineeratcontractorowncost so as to
come to proper formation. In case bad formations are met with the work shall haveto be done as per
instruction of City Engineer. Necessary arrangements for watering trenchesmust be provided by
contractor and without proper watering trenches will not be allowed to befiled to further Contractor shall
have to make arrangement for access to invert of the sewer andfor inspection of the work as ordered by
the engineer. If it is required to shift or after thealignment section of diameter of the pipe the contractor
shall carry out the altered work at therates quoted by him for the original work for items and contractor
shall not claim any expensesduetothe changesmade.
In no case work shall be done at night or no Sundays & other holidays and during
therecesstimeexceptinandotherholidaythecaseofbadgroundssuchasrunningsandwherethework must be
executed vigorous day night without interruption when so ordered by the engineer.All existing water pipe
storm drains sewer line railway track, electric cables etc. which do not inthe opinion of engineer required
to be changed in location shall be supported and protected frominjury by the contractor. The contractor
shall be liable to pay all damages to water-pipe, drainselectric and telephone cable and to private property
during the execution of this contract and thesame will be recovered from the running bills or the deposit of
work change location of anyexisting sewers drains etc. not otherwise from in these specification the
contractor shall do thework of making such change and the work shall be paid for as extra work. All
places utility etc.shallbekept accessibleforuse.
No extra payment shall be made for land sides and side stops done without prior approval of
theengineerincharge.
The excavation of trenches shall be done foot wider on each side of the pipe than theinside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert,
onefeetwiderexcavatedoneithersidefortheupperdepthabove3metersshallbeallowedandpaidfor. Wherever
natural soil demands winder excavation the mentioned above the same shall begiven after approval of
City Engineer. The rate for excavation for easy jointing and caulkingnothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of
lineandhydraulictestpracticableofthelinesarecheckedandapprovedofandordergivenbythe
Engineerincharge.Therefillingshallbeaccompaniedbythroughwateringforlayersof0.50
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches arecompletely
refilled. Temping and ramming with rammers shall have to be done at all place ofimportant work where
ordered by Engineer in charge. After order to refill the trench is give
thetrenchesshallhavetoberefilledwithin4dayswithcompletewatering.Ifthecontractorfailstodo watering
satisfactory corporation shall get it done at the risk and cost of the contractor with orwithout giving any
notice and the expenses incurred in doing so recovered from the contractoreitherincost
orfromhispaymentthroughbills.
Therateshallbepermeterbasis.
TherateperCmt.inthisitemshallbepaidextraadditiontotherateforexcavation
ItemNo. ProvidingandsupplyingISIStandardRCCpipes(ofsulphateresistingCement)instandardlengt
7-8 hs offollowing class anddiametersuitable for rubber ringjoints (socketand spigot)
including all taxes,insurance, transportation,treight charges,octroi,inspectioncharges,
loading,unloading, conveyance to departmental stores, stacking etc.
completeClassNP3Testpressure0.7Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in
properposition , grade and alignment at all level as directed by Engineer-in- charge
includingconveyancefromstonetositeofwork,labourgivinghydraulictestingasperISIcode.
(a)300mminternaldiameterB)450Mm Internal
Diameter(C)500MmInternalDiameter,(D)60
0MmInternalDiameter
TheRCCpipesshallbeprocuredasperISSforBClasstypespecificationsusingbestmaterials,first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tenderitem. The proportion of
concrete shall be one part of cement to 2 parts sand and 4 parts of blacktrap agg. mix. of suitable size to as
to produce uniform concrete through out thicknessof thepipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458 classspecifications.
RCCspunpipecollarsforthepipesshallbemadeinthesamemanner.Theinternaldiameterofthe collar shall be
sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially preparedformation
or on concrete bed and for the purpose to extra rate shall be given making extraexcavation
forbedandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in thelength. For
each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned
andmoisturedandthecollarshallbekeptinpositionbymeansofwedges.Semidrycementmortarofprop. 1:1 shall
be forced into joints and chaucked completely by means of special cutting toolsuntil the whole space is
full. The mortar shall be sprayed around the collar joints so as tocompletelyencasethejoint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and ifhe has any
doubt as to their soundness be may required the contractors to cut open and clearaway the cement of any
joint that he may select and to make good the same at their expensesprovided that, unless some defect be
found, they shall be required to open more than one jointsin 18mt (60’) of pipe, though if defect be found
the Engineer direct them to open as many jointsas he may deem necessary, the joints made one day will
not as a rule, be inspected until thefollowingdayandthe
cementmayhassufficienttimetosetwellbeforebeingcoveredup.
Trenches shall not be filled until alignment and levels are examined by the Engineer or
hissubordinatesandthepermissionforrefillingisgranted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using bestmaterials first
class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line ofNP3class.
Theproportionofconcreteshallbeonepartofcementto2partsofsandand2partsofblacktrapagg.Mixofsuitablesiz
e soastoproducingfirmconcretethoughtthicknessofthepipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ classspecifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of thecollar shall
be sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on speciallyprepared
formation and for the purpose no extra rate shall be given for claming such hollows
inbendsandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelengthforeachjointdipedisnotasphaltafterthejointhasbeenproperlycleaned&moistureand
collarkeptinpositionbymeansofwedges,semi-drycementmortarprop.1;1shallbefacedinto
it and caulked completely by means of specials caulking tools until the whole space in full.
Themortarshallbesprayedoff intheformof filleraroundthepipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly togradient.
M/SshallbeinRMT.
Trenches shall not be filled in until the line has been tested and alignment and levels
areexaminedbytheEngineerorhissubordinatesandthepermissionforrefillingisgranted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactoryworking of the
same for 12months after it is put into commission, contractor must satisfy
IS458/1971andIS783/1959withreferencetoRCCpipe.
ItemNo.9 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10)
forfoundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM
1:3,finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of
chamberseatcoveretc..completed.
(A) 0.60X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60X0.75mt.sizeInsideClear,Depthfrom0.0to0.90meterforpipedia<=20mm.
(C) 0.75x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.Therateincludesallnecessarymaterualsmixinglayingandremainandwateringtheexposed
facestobefinishedwithneatcementasperinstructionthechannelshallbehalfroundandas
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyenginee
rinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ConstructingSlabTypeM.H.ChamberOfTheFollowingSizeIncludingExcavation,Refilling,
No.10 Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)InCm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 CmC/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
15C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway
mmdia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X
1.00Meter(InsideClear, M.H. lengthshouldbeparalleltotheflow)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
Cementusedshallbegotapprovedbytheenginreinchargebeforestartingtheworkthisshallcomplywithsp
ecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbatstobeusedforconcretemustbethoroughlywellburntandfreefromanyimpuritiesandsizefr
Thepreparationofconcreteshallbeonepartofcement5partofsand&10partbroken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate
includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished
with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300mmabove
thebenching. Themanhole/inspectionchamberframeand covershallbeofcast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They shall be
neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyenginee
rinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item RatereductionoveritemofConstructingSlabTypeM.H.Chamberofsize1.00x0.75mtforconstruc
No.11 [email protected](Max.3unit\ofDM
shouldbereducedinthisitem)(AsPerR.A.BasedonBuildingSOR2015-16)
Item Constructing Slab type M.H. Chamber of the following size including excavation,
No.12 refilling,brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in
CM 1:3,finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
at 35cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
includingCantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but
excludingthecostofManholeseatcoveretc..completed.ofSize1.00X1.40meter(InsideClear,
M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)
2) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)
3) 3.00to4.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
4) 5.00to6.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
5) 7.00to8.00meterdepth,(Slabatbelow1.00mt.FromG.L.)(a)Ex
cavation:ThisbedoneasspecificationinItem No.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasursboxesforsandandcementbagof1.25cft.or1cft.asmeasuredthecasemay
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould be
constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral
specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate
includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished
with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyengineer
inchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ExtrarateoveritemofConstructingSlabTypeM.H.Chamberoffollowingsizeforconstructing
No.13 M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof.
etc.complete.Ofsize1.00x1.40mt.(insideclear)andDepthfrom
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x
No.14 mtfor constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt
for(MHabove3.0mtdepth)belowGroundLevel(Max.5unitof DMshouldbereducedinthis
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
No.15 manholeof following size incl. excavation, refilling and & finished 15 mm thick cement
plasterinside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggeredinmasonryCM1:5,incl.costofRCCSlabinCC1:1.5:3,includingCantering&reinforce
ment as directed by engineer in charge. Rate includes carting of debris andexcavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalliat15C.M. c/cbothway10mmdia.)From0to2mtdepth(SlabatGroundlevel)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slabatbelow
1.00mt.FromG.L.)
3) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth(Slab atGround level)
4) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab atbelow1.00mt.
5) 1.40x 1.00 mt(insideclear) RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab atbelow1.00mt.
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
TheworkshallbeasperP.W.DhandbookspecificationNo.20aspergeneralinstructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe
finished with neat cement as per instruction the channel shall be half round and asper drawing &
instruction of Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkor
asdirectedbyengineerinchargeorAdditionalCityEngineer(southzone)Modeofmeas
Therateshallbeforaunit ofonenumberbasis.
ItemNo. Provdg.&layingS.W.Gullytrapwithbrickmasonry chamber &
16 watertightG.T.StoneincludingfixingofcoverSquaremouthtrap100mmx100mmsizeP-
ConstructingGullyTrapChamberWithMasonryInCementMortar1:5&PlasteringInCementMortar1:3Usin
gG.T.StoneIncl.FixingCoverEtc.CompletedAsDirected.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Making connection to the ex. M.H.in running sewer incl. Dewatering and otherrequired
17 machinery etc. of following dia pipes at any convenient time. All damaged
workshallbewellrepaired asperinstructions. etc..complete.
Rateincludesconnectioninthesewerlineatanyconvenienttimewhentheloadonthedrainageline in less. All
damaged work shall be well repaired as per instruction of officer in charge.Proposed R.C. C. line should
be connected with the existing M.H. as directed. Holes made inthe well of existing M.H. should be
finished smooth and in circular shape as directed. Rate alsoincludes making new channel or repairing
existing damaged channel if instructed. Rate isinclusiveofwateringetc.as directed.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Cutting the pipes of following dia coming in the new M.H.in
18 runningsewerincludingcuttingbars,includingremoving debris /silt from the M.H. and
carting at a suitabledistance etc..complete as directed. No payment for M.H. work will be
made until pipe isnotcutcompletelyinall respect.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is
foundemptyalldamageworkshall bewellrepairinstruetionsetc.comp.
material shallbe cut as pes requirement to Cutting thepipe in existing manhole reinforcementbars shall also
have to be cut in existing manhole as per requirement and making good thesame. the dis mental materials
shall be carried ti placesat all lead as directed by engineer
inchargeIfdirectedtheworkshallhavetobedoneatnightthemeasurementshallbeaspernos
Modeofmeasurement:
herateshall beforaunitofNosBasis
Item Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in
No.19- C.M.1:5andplasterinC.M.1:3andfixingC.I.stepsandM.H.andcartingthesameasdirected.A)…
B) ………………do ......................... Upto0.35mt.(@Fourcoarse)
C)………………do…………………Upto0.65mt.(@Sevencoarse)D)…
RepairingdamagedI.C./Raisinremovingdamagedbrickworkandrepairingbybrickmasonr
y in C.M. 1:5 and plasterinC.M.1:3andfixingC.I. steps and existingchamber sheet
cover,removing the debris from chamber andcartingthesameasdirected.
Required level shall be achieved in brick work as specified including plaster, the thickness ofjoints shall
not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or brokenbrickorasphaltmix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface ofan
asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the
brickworkwithsplayedfillerall around.
Water:Gullyframesbeingontheedgeofroadshallbefixedtothecorrectroadlevelatitsupperendandtheslopeshoul
dbesuchitmustbeabout(12mm)(1/2”)lowerthanwatertable.
A concrete pavement should be case around the frames and covers of man-holes,chambersetc.
incaseof asphlaticroad.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) asspecified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edgeof the circular frame no
pavement will be made of this pavement under the item of cementconcrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) inexternal
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the
longerdimensionbeingalongthedirectionofthemain.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C.No
payment will be made for the pavement should be at least 8 cm (3”) wider than the
outermostedgeoftheframe.
After removing the top portion of the manholes, the proper brick masonry layer with c.m.(1:4)
should be constructed for proper bondage with old masonry and 8 cms thick PCC work(1:2:4) should be
laid on the top of brick layer an up to the bottom of the seat. After fixing
theseatthemanholeshouldbeproperlyleveledwithroadlevel.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall
becleanwithin48hoursofconcretingday.
M/SshallbegivenonNobasis.
ItemNo. RCC Precast M.H.Frame & Cover Manufacture, supply & Delivery at store or at side
21 ofwork Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type
design&DrawingincludingcostofreinforcementM.S. AnglesorFlat,cutting moldworketc.
FrameSuitablefor50CmopeningofMHCo
verSuitablefor50CmOpeningOfMH
FrameSuitablefor50CmopeningofMHCo
verSuitablefor50CmOpeningOfMH
3) HouseconnectionChamberLightDutyFr
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to
22 matchexisisting road level in C.C. 1:2:4andfinishing smooth, watering and protectingfor
7days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from anystore)
Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to matchexisisting
road level in C.C. 1:2:4 and finishing smooth, watering and protectingfor 7 days
etc.completeasdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. ProvidingKachhaOfPakkaDummyIn The Following Dia Pipes And Removing
23 TheSameAfterTheConnectionOfTheWorkAs Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the sameafter the
connecting of the work as per instruction of engineer in charge. If kachcha or pakkadummy is not
removed by the contractor then the penalty shall be laid as per municipal rules orderived
bythemunicipalcorporationofficer'sin-charge.
Measurementsshallbegivenonno.basis.
ItemNo. Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for
24 existingEHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in
line andleveltomatch exisisting road level in CC1:2:4and finishingsmooth,
wateringandprotectingfor7days etc.completeasperinstructionbyengg.incharge.
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-35FRC MH
cover, rate also incl. loading, unloading and fixing the frame in line and level to matchexisisting road level
in CC 1:2:4 and finishing smooth, watering and protecting for 7 days
etc.completeasperinstructionbyengg.incharge.
MeasurementsshallbegivenonKgbasis.
ItemNo. Raising of Existing manhole item includes,cutting of existing road surround by
25 Manholeby diamond cutter machine dismantling of road in confined area by breaker
andcartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanhole
at road level in CM 1:3 item also included fixing of Manhole frame at exact roadlevel by
using MaserEmaco S 488 trowable fibre reinforced thixotropic repair mortalmaterial
Laying of concrete made form Master Emaco 5 346 flowable micro concretematerial in
desired thickness and laying of hot bitumanous material in Upper layer andcompaction of
hot bitumanious material by palte compactor machine .Rate also
includednecessaryplasteratinsideofmanholeinCM1:3in20MMthicknessonraisedbrickwork.
Raising of Existing manhole item includes,cutting of existing road surround by Manholeby
diamond cutter machine dismantling of road in confined area by breaker machine and
cartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanholeatroadlevelinCM1:3it
emalsoincludedfixingofManholeframeatexactroadlevelbyusingMaserEmacoS488 trowable fibre
reinforced thixotropic repair mortal material Laying of concrete made formMaster Emaco 5 346 flowable
micro concrete material in desired thickness and laying of
hotbitumanousmaterialinUpperlayerandcompactionofhotbitumaniousmaterialbypaltecompactor machine
.Rate also included necessary plaster at inside of manhole in CM 1:3 in
20MMthicknessonraisedbrickwork.
Measurementsshallbegivenonno.basis.
ItemNo. Brickworkusingcommonburntclaybuildingbrickshavingcrushingstrengthnotlessthan35kg/
26 Sq.cm.incementmortar1:5(1cement:5finesand)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-
6.Brickshall conformtoM-15Cementmortarshall conformtoM-11.
Theproportionofthecementmortarshallbe1:6(1cement:5finesand)byvolume.
Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean waterfor
about two hours before use or as directed. The cessation of bubbles, when the bricks
arewettedwithwaterisanindicationofthroughwettingof bricks.
BricksshallbelaidinEnglishbondunlessdirectedotherwise.Halforcutbricksshallnotbeusedexcept when
necessary to complete to bond; closer in such case shall be cut to required sizeandusedneartheendsofwalls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brickshall first
be properly bedded and set home by gently tapping with handle of trowel or
woodenmallet.Itsidefaceshallbeflushedwithmortarbeforethenextbrickislaidandpressedagainst
it.Oncopletionofcourse,theverticaljointsshallbefullyfilledformthetopwithmortar.
Thewallsshallbetakenuptrulyinplumb.Allcoursesshallbelaidtrulyhorizontalandallverticaljoint shall be truly
vertical. Vertical joints in alternate course shall generally be directly one overtheother.Thethicknessof
brickcourseshallbekeptuniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges,mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site ofworkforfrequent
checkingduringtheprogressofwork.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
theconnectedbrickworkshallbekeptnotmorethanonemeterovertherestofthework.Wherethisis not possible,
the work shall be raked back according to bond (and not left toothed) at an anglenot steeperthan45degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to
bebuiltinwallshallbeembeddedincement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall notexceed
mm. The face joints shall be raked out as directed by taking tools daily during theprogress of work, when
the mortar is still green so as to provide key for plaster or pointing todone.
The face of brick shall be cleaned the very day on which the brick work is laid and all
mortardroppingremoved.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all thefaces for a
period seven days. The top of masonry work shall be kept well wetted at the close oftheday
Preparationoffoundationbed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared ofall loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid onconcrete footing, the top
of concrete shall be cleaned and moistened. The contractor shall obtainthe engineer'’ approval for the
foundation bed, before foundation masonry is started. Whenpuccas flooring is to be provided flush with
the top to plinth, the inside plinth offset shall be
keptlowerthantheoutsideplinthtopbythethicknessoftheflooring.
Modeofmeasurementsandpayment:
Themeasurementsofthisitemshallbetakenforthebrick masonryfullycompletedinfoundationuptoplinth.
Thelimitingdimensionsnotexceedingthoseshownontheplansorasdirectedshallbefinal.Battered, tapered
andcurvedportionsshallbemeasurednet.
No deduction shall be made from the quantity of brick work nor any extra payment made forembedding in
masonryormakingholesinrespectoffollowing items:
Endsofjoints,beams,posts,girders,rafters,purlins,trusses,corbelstepsetc.wherecrosssectionalareadoesnotexce
Openingnotexceeding1000Sq.cm.
Wallplatesandbedplates,bearingofslabs,chhajasanthelikewhosethicknessdoesnotexceed10Cms.and
thebearingdoesnotextendto thefullthicknessofwall.
Drainageholes,andrecessesforcementconcreteblockstoembedholdfastsfordoors,windowsetc.
Ironfixtures,pipesupto300mmdiaholdfastsanddoorsandwindowsbuiltintomasonryandpipesetc.forconcealed
Formingchasesofsectionnotexceeding350Sq.Cm.inmasonry.
Aperturesforfireplacesshallnotbedeductednorshallextralabourrequiredtomakesplayingofjambs,throatingand
makingArchesovertheaperturebepaidforseparately.
Therateshallbeforaunit ofonecubicmeter.
ItemNo. Supplying,labourforbreakdownrepairingworkforactivitieslikeexcavation,disliting,removing
27 debrisfromtrenchbackfillingetc.comp.asdirectedbyEng.incharge.
1) Mazdooratday/Night
2) Makadam/supervisionatday/NightM
odeofmeasurement:
TherateshallbeforaunitofNoBasis.
ItemNo. ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequiredthickne
28 ss and size including placing the nece. supports of reqd. size, nailing, fixing withmortar,
levelling. All specification for dead centring as per standard engg. practice etc.comp.
ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequired thickness and
size including placing the nece. supports of reqd. size, nailing, fixing withmortar, levelling. All
specification for dead centring as per standard engg. practice etc. comp. asdirected.
Therateshallbefor aunit ofSmtBasis
ItemNo. Providing15mmthickcementplasterinsinglecoatonRough(Similar)sideofsingleorhalfbrickw
29 allsforinteriorplasteringuptofloortwolevelandfinishedevenandsmoothin
(i)Cementmortar1:3(1-cement:3-sand)finishingwithafloatingcoatofneatcementslurry.
WaterM-1.TheCementmortarofproportion1:3shallconformtoM-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound.These shall
be properly examined before erection and use Stage scaffolding shall be providedforceilingplaster,
whichshall beindependent ofthewalls.
Preparationofback-ground:
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescenceand other
foreign matter by water or by brushing. Smooth surface shall be roughened by wirebrushing if it is not
hard and by racking if it is hard. In case of concrete surface, if a chemicalretarder has been applied to the
form work, the surface shall be roughened by wire brushing andall the resulting dust and loose particles
cleaned off and care shall be taken that none of
theretarderisleftonthesurface.Trimmingofprojectionsonbrick/concretesurfacewherenecessaryshallbecarried
outtogetanevensurface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for
sufficientperiodbeforecarryingout theplasterwork.
The work shall not be soaked but only damped evenly before applying the plaster. If the
surfacebecomesdrysuchareashallbemoistenedagain.
Forexternalplaster,theplasteringoperationshallbestartedfromtopfloorandcarrieddownwards. For internal
plaster, the plastering operations may be started wherever the buildingframe and cladding work are ready
and the temporary supporting ceiling resting on the wall
ofthefloorhavebeenremoved,Ceilingplastershallbecompletedbeforestartingplastertowalls.
ApplicationsofPlaster:
Theplasterabout15x15cms.Shallbefirstappliedhorizontallyandverticallyat notmorethan2metre intervals
over the entire surface to serve as gauge. The surfaces of these gauges shall betruly inplane of the finished
plastered surface. The mortar shall then be applied in uniformsurface slightly more than the specified
thickness, then brought to a true surface by working
awoodenstraightedgereachingacrossthegaugeswithsmallupwardandsidewaysmovementata time. Finally,
the surface shall be finished off true with a trowel or wooden float according as asmooth or a sandy
granular texture is required. Excessive trowelling or overworking the floatshall be avoided. All corners,
arrises, angles and junctions be truly vertical or horizontal as thecase may be and shall be carefully
finished. Rounding or chamfering corners, arrises junctionsetc.shallbe
carriedoutwithpropertemplatestothesizerequired.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plasterwhich
ispartiallysetshallberejectedandremovedforthwithfromthe site:
In suspending the work at the end of the day, the plaster shall be left out clean to the line bothhorizontally
and vertically. When recommending the plaster, the edges of the old work shall bescraped clean and
wetted with cement putty before plaster is applied to the adjacent area toenable the two to properly joint
together. Plastering work shall be closed at the end of the day onthe body of the wall and nearer than
cm. To any corners or arrises. Horizontal joints
inplasterworkshallnotalsooccuronparapettopsandcopingsastheseinvariablyleadtoleakage.Noportionofthesu
rfaceshallbeleftoutinitiallytobepackeduplateron.
Eachcoatshallbekeptdamcontinuously tillthenextcoatisappliedorforaminimumperiodof7 days. Moistening
shall commence as soon as plaster is hardened sufficiently. Soaking of wallsshall be avoided and only as
much water as can be readily absorbed shall be used excessiveevaporation onthesunny
orwindwardsideofbuildingin hot airordry weather shall beprevented by handling mattings or gunny bags
on the outside of the plaster and keeping themwet.
Modeofmeasurement&payment:
The rate shall include the cost of all materials, labour and scaffolding etc, involved in
theoperationsdescribedunderworkmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth orheight
shallbemeasuredcorrecttoacentimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open jointsin brick
work, stone work etc. or space between laths. Thickness of plaster shall be averagethicknesswithminimum
10mm.atanypointonthissurface.
Thisitemincludesplasteringuptofloortwolevel.
The measurement of wall plastering shall be taken between the walls or partition (dimensionsbefore
plastering being taken) for length and from the top of floor or skirting to ceiling for height.Depthof
coverof cornicesif anyshallbededucted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measuredseparately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints,beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openingsexceeding 0.5 sq.mt. and
not exceeding 3.0 sq. mt. in each area deductions and additions shallbemadeinthefollowingmanner:
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5sq. mt. each
and no addition shall be madefor reveals, jambs, soffits, sills etc. of these openingforfinishtoplasteraround
endsof joints,beams,postsetc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made
asfollowsandnoadditionshallbemadeforreveals,jambs,soffitsetc.sillsetc.oftheseopenings.
When both faces of all wall are plastered with same plaster,
deductionshallbemadeforonefaceonly.
When two faces of wall are plastered with different types of plasters or ifone
faces is plastered and the other pointed, deductions shall be made from the plaster orpointing on the side
of frame for door, window etc. on which width or reveals is less than that
ontheothersidebutnodeductionsshallbemadeontheotherside.Wherewidthofrevealsonbothfaces of all are
equal, deductions of 50% of area of opening on each face shall be made fromareaof
plasterand/orpointingasthecase maybe.
For openings having door frames equal to projecting beyond the thickness of wall, full
deductionforopeningshallbemadefrom eachplastered faceofthewall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening butjambs,
soffitsandsillsshallbemeasured.
The rate shall be for a unit of one sq.
metre.finishingwithafloatingcoatofnetcementslurr
y.Materials &Workmanship:
Thisworkisonlyofprovidingsmoothcementfinishwithfloatingcoatofneatcementslurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be appliedto the
plastered surface with a trowel to provide uniform texture while the base coast is stillplastic.
In any continuous face of wall the finishing treatment should be carried out continuously and
daytodaybrakedmadetocoincidewitharchitecturalbreaksinordertoavoidunsightlyjunctions.
Curing:Alltheplasterworkshallbekeptdampcontinuouslyforaperiodof7days.
Modeofmeasurements&payment:
Thepaymentshallbemadeforaunit of 1.0sq. mt. ofworkdone overandabovethe finishingofworkof base coat.
Therelevantspecificationsofitemofbasecoatshallbefollowedformeasurements andpayment.
Therateshallbeforaunit ofonesq.metre.
ItemNo. Supplying cutting, bending, binding and placing in position steel as per plan and
30 designand as per IS 2502 including cost of steel and binding wire for reservoirs/
structuresonlyincluding lift up to 6 meter height or depth below GL for all diameters TMT
bars Fe-415gradeforalldiameters
The scope of work consists of providing and laying mild steel reinforcement and TMTCRS Fe-
500 reinforcement for RCC works of various components of the structure. This may
beTiscooranyotherapprovedmanufacturerbranchandcorrosionresistantsteelbarsapprovedbythe Engineer
Incharge. This includes cuttings, bending, binding, placing, with all equipments andlabour required for the
work as directed by the City Engineer, Ahmedabad and all operationscovered
withintheintentandpurposeofthespecification.
BeingofReinforcement
Reinforcingsteel shall conform accurately to the dimensions shown on relevant
drawingsandconformingtotherelevantIScodes(latestrevision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the CityEngineer,
AMC, Ahmedabad using a proper bar bender, operated by hand or power to attainproperradiiofbends.
Barsshallnotbebentorstraightenedinamannerthatwillcauseinjurytothematerial.
Bars bent during transport or handling shall be straightened before being used on
work;theyshallnot beheatedtofacilitatebending.
ThebendingoftheTMTbarsshallbecarriedoutasperthefollowing:
S.No Operation Size TMTCRS-Fe-500
1 Bend Upto22 mmdia 3d
Over22 mmdia 4d
2 Rebend Upto10mmdia 4d
Over10 mmdia 5d
PlacingofReinforcement:
Allreinforcingbarsshallbeaccuratelyplacedintheexactpositionshownonthedrawings, and shall be
securely held in position during placing of concrete by annealed bindingwire not less than 1 mm in size
and conforming to IS:280 and by using stays blocks or metalchairs, spacer, metal hangers, supporting
wires or other approved devices at sufficiently closeintervals. Bars will not be allowed to sag between
supports nor displaced during concreting orany other operation over the work. All devices used for
positioning shall be of non-corrodiblematerial. Wooden and metal supports will not extend to the surface
of concrete, except
whereshownonthedrawings,placingbarsonlayersoffreshlylaidconcreteastheworkprogressesforadjusting bar
spacing will not be allowed. Pieces of broken stone, brick or wooden blocks shallnot be used. Layers of
bars shall be separated by spacer bars, precast mortar blocks or otherapproveddevices.
Reinforcement after being placed in position shall be maintained in a clean
conditionuntilcompletelyembeddedinconcrete.Specialcareshallbeexercisedtopreventanydisplacementof
reinforcementinconcretealreadyplaced.
To protect reinforcement from corrosion, concrete cover shall be provided as indicatedon the
drawings. All bars protruding from concrete to which other bars are to be spliced andwhich are likely to
be exposed for an indefinite period shall be protected by a thick coat of neatcement grout.
In the case of columns and walls, vertical bars shall be kept in normal position
withtimbertemplateshavingslotsaccuratelycutinforbarposition.Suchtemplatesshallberemovedaftertheconcr
eting hasprogresseduptoaleveljustbelowthem.
Barscrossingeachother,whererequired,shallbesecuredbybindingwire(annealed)ofsize not less than
1 mm and conforming to IS;280 in such a manner that they do not slip overeach other at the time of fixing
and concreting. As far as possible, bars of full length shall beused. In case this is not possible, overlapping
of bars shall be done as directed by the CityEngineer, AMC, Ahmedabad. When practicable, overlapping
bars shall not touch each other, butbe kept apart by 25 mm or 1 ¼ times the maximum size of the coarse
aggregates whichever isgreater, by concrete between them. Where this is not feasible, overlapping bars
shall be boundwith annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around
thelappedbars.Theoverlapsshallbestaggeredfordifferentbarsandlocatedatfixedlocationsonlyalongthespanwh
ereneithershearnorbeingmomentismaximum.
WeldingofTMTbarscanbepermittedifspecifiedonthedrawings,jointsofreinforcement bars shall be
butt welded so as to transit their full strength. Welded joints shallpreferably be located at points where
steel will not be subject to more than 75 percent of
themaximumpermissiblestressesandweldssostaggeredthatatanyonesection,notmorethan
33 per cent of the rods are welded. No –pre-warning or post heat treatment is necessary.Interpass
temperature should be limited to 200º C with low heat input and equivalent strength lowhydrogen type
electrode. Suitable means shall be provided for holding the bars securely inposition during welding. It
must be ensured that no voids are left in welding and when welding isdone in 2 or 3 stages, previous
surface shall be cleaned property. Ends of the bars shall becleaned of all loose scale, rust, grease, paint
and other foreign matter before welding. Onlycompetentweldersshallbeemployedonthework.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from theactual site and
their number and frequency of tests shall be as directed by the City Engineer,AMC, Ahmedabad.
TheTMTbarsshallbetestedforanyorallofthefollowingtestsasdirectedbytheEngineerIncharge
Alternate immersion testSalt
testAtmosphericexposuretest
Sulphur dioxide
testPotentiodynamictest.
ItemNo. Providing and caste in situ CC in grade M 20 using granite quadrite tap metal of size 6 mm
31 to 20 mm for RCC work including scaffolding centreing form work needle vibrator
consolidation curing complete up to 6 m dep or height (excluding cost of rangeforcement
and need finishing) with centering and shuttering/d shuttering etc complete for structure
other than water retaining
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4proportion measured by
volume shall conform to relevant specification or ordinary grade1:2:4concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the sitecondition. The
concrete shall be mixed in a mechanical mixer at the work. Hand
mixermayhoweverbeallowedforsmallerquantitiesofworkandincaseoffailureofmachinesor as permitted by
the engineer-in-charge. It shall carried out on a water tight platformand care shall be taken to ensure that
mixing is continued until the mass is uniform incolourand consistency.Howeverin such cases 10% more
cement than otherwiserequiredshallhavetobeusedwithoutanycost.Themechanicalmixingshallbedone
foraperiodof1/to2minutes.Thequantityofwatershallbethussufficientofproducea
dense concrete required workability for the purpose. Flooring of specified thickness
shallbelaidinaccordancewithapprovedpatternorasdirected.Finishingoperationshallstartshortly after
the cessation of beating and shall be spread over a period of one to sixhoursdepending upon the
temperature and atmospheric conditions. The surface shallbe left for some time till moisture
disappears from it. Fresh quantity of cement shall bemixed with water to form a thick slurry and
spread over the surface while the concrete isstill green. Use of dry cement or cement and sand
mixture sprinkled on this surface tostiffen the concrete or absorb excessive moisture shall not be
permitted. The cementslurry shall than be properly paste twice by means of iron flats, once, when
the slurry isapplied and the second time when cement starts setting and finished smooth.
Thesurface shall be marked with string or B.R.C. fabric jali to make the surface non slipperyas
and when directed. The junction of floors with wall plaster dado or skirting shall berounded
where so required upto 25 mm. radius. Flooring in lavatories and bath
roomsshallbelaidafterfixingofwaterclosetandsquattingpansandfloortraps,whichshallbeplugged
while laying the floors and opened after the floors, are completed. Any
damage,donetowatersupplysanitaryfittingsduringtheexecutionofworkshallbemagegood.
Afterthefinalset,theconcreteshallbekeptcontinuouslywet,ifrequiredpondingfora
periodofnotlessthan7daysfromthedateofplacement.
The form work shall be provided if necessary as directed by the engineer in charge.Concreting shall be
done as per alternate bay method with necessary centering witherbymasticorcementmortarasdirected.
Modeofmeasurement&payment:
The rate shall include the cost of all material and labour involved in all the operationsdescribed above.
No deduction shall be made or extra paid for any opening upto
sq.metreinareainthefloor,nothingextrashallbepaidforlayingtheflooratdifferentlevelsinthesameroomor
TherateshallbeforunitofoneCmt
ItemNo. Providing and installation of barricading with retro-reflective paint/ film/ tapes
32 (Minimum3.0Mt. height) as specified in the drawing & specifications for the construction
of roadwork, along with necessary diversion arrangement for existing traffic movement in
anunobstructedcondition,allrelevantmarkings,signboardsandilluminationasperrelevantM
ORT&H specification. Precoatedgalvanisedironprofilesheets shallbe ofapproved make
and shade having 0.50 mm (+0.05 %) total coated thickness with zinccoating 120 grams
per sqm as per IS: 277, in 550 mpa steel grade, 5-7 microns epoxyprimeronbothside ofthe
sheetandpolyestertopcoat 15-18microns.Rate tobeinclusive of all materials, fabrication
works, paint works for information (retro reflectivepaint), foundation works,
transportation, loading, unloading, installation, dismantling andinclusive of all taxes and
including the same design for providing openable gates.
Noextrarentalwillbegiventothecontractorincaseofany delaysfromhispartforconstruction or
due to any valid time limit extensions. Each barricading sheet is to
benumberedwithauniquenumber.Thebarricading providedshallberetainedinpositionat
sitecontinuouslyi/cshiftingofbarricadingfromonelocationtoanotherlocationasmany
times as required during the execution of the entire work till its completion. Rate
includeits maintenance for damages, painting, all incidentals, labour materials,
equipments andworks required to execute the job. The barricading shall not be removed
without priorapproval of Engineerin- Charge. (Note :- One time payment shall be made for
providingbarricadingfromstartofworktillcompletionofworki/cshifting.Thebarricadingprovi
ded shall remain to be the property of the contractor on completion of the work).Blinkers
are to be installed on the barricading and rate for blinkers will be payable as
perrelevantitem. Barricadingisto becleanedbymeansof
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Barricading theentirebreakdownorexcavatedareaon rentalbasisusingwoodenballies
33 / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board
outside to avoid accident & for smooth traffic diversion & movement including
cautionaryboard etc. Item also includes for making temporary sufficient nos of lighting
arrangementthrough out the work with necessary required arrangement. ..The same shall
be removedaftercompletion ofwork.
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Providing and erecting CI and Ms ventilating columns under centimetres Dia with CI
34 ornamental cap and minimum 6 m height (height maybe very as per site) Bass fix family
with necessary foundation with one court of red lead oxide paint and one cot of any
approved Colors with 15 CM Dia 10 m in length with 0.35x0.35 mt. M 100 MK Singh
stoneware or RCC pipe connection with image including exclusion and jointing as
required etc completed as per drawing For 6 mt. Height (6 mt. MS Pipe)
Modeofmeasurements&payment:
Therateshallbefor aunitofNos
ItemNo. Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with
35 M.S. flats at required spacings and frame alround, square or round bars with round
headed bolts and nuts or by screws (A) Plain Grill. (upto 10 ton).
Modeofmeasurements&payment:Therat
e shallbeforaunitofKg
ItemNo. Providing and operation dewatering Pump including fuel charges & operator Charges etc.
36 as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be
allowed for non working condition of machinery)
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost
37 oftoand fro transportation, laying of the delivery hoses as required, lowering and
liftingthe pumps as and when required etc. complete. Set Do As Directed. (No
paymentshouldbeallowedfornonworking conditionofmachinery)
Modeofmeasurements&payment:
TherateshallbeforaunitofHP/Hr.
ItemNo. Hiring and operatingthe 20 KV 3 Phase Electric Generator
38 foroperatingdesiltingmachinery,andlighting and other requirements with Arranging
diesel to run the D.G.SetDoAsDirected.8HrsShift.(Nopaymentshouldbeallowedfornon
workingconditionofmachinery )
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Providing & Supplying JCB Machine on rental basis in case of emergency situation and
39 break down type work & also during unavoidable condition as per instruction of
engg.incharge, rate includes all nece. shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and laying work)
The item is for supplying JCB on rent for various construction activities The rate includes
variousoperational cost such asoperating generater/electricity diesel,petrol, operater's salary, etccomp.
when machine is in working condition all precautions shall be taken by contractor to avoid theaccident.if
any accident occurs contractor shall be fully resonsible for that. the payment shall begiven on hour
basis.No payment shall be given for idle hour and no time shall be counted forcarrying
machinetositeandfromshiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-110capacityonrentalbasisincaseofemergency
40 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesall nece. shifting, fuel and operatingcharges
TheitemisforsupplyingMachinerentforvariousconstructionactivitiesTherateincludes
various operational cost such as operating generater/electricitydiesel,petrol, operater's salary,etc comp.
when machine is in working condition all precautions shall be taken by contractor
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall be given
on hour basis.No payment shall be given for idle hour and no time shall becountedforcarryingmachineto
siteand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-200capacityonrentalbasisincaseofemergency
41 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesall nece. shifting, fuel and operatingcharges.
The item is for supplying Machine rent for various construction activities The rate includesvarious
operational cost such as operating generater/electricitydiesel,petrol, operater's salary,etc comp. when
machine is in working condition all precautions shall be taken by contractor
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall be given
on hour basis.No payment shall be given for idle hour and no time shall becountedforcarryingmachineto
siteand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case
42 ofemergency situation and break down type work & also during unavoidable condition
asper instruction of engg.incharge , rate includesall nece. shifting, fuel and
operatingcharges.
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in caseof
emergency situation and break down type work & also during unavoidable condition as
perinstructionofengg.incharge,rateincludesallnece. shifting,fuelandoperatingcharges.
thepaymentshallbegivenonPer8hrShiftbasis.
ItemNo. SupplyingElectricBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing
43 Operator, fuel, power Supply etc. Complete as Directed. (No payment should beallowed for
non working condition of machinery and for pipe line excavation and M.H.work.Allowed
onlyforbreak downwork)
Modeofmeasurements&payment:Therat
eshallbefor aunitofShift
ItemNo. SupplyingPneumaticBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusin
44 gOperator,fuel,powerSupplyetc.CompleteasDirected.(Nopaymentshouldbeallowed for non
working condition of machinery and for pipe line excavation and M.H.work.Allowed
onlyforbreak downwork)
Mode of measurements & payment:
Therateshallbeforaunit ofHour
ItemNo. Provide Tractor with Hydraulic trolley, driver with fuel to carryout different works during
45 day/night for 8 Hr. shift Work shall be carried out as per the instructions of engineer in
charge. No Extra charged shall be paid for night shift.
Modeofmeasurements&payment:Therat
eshallbefor aunitof Day
ItemNo. Hiring of Three wheeler carrier (Chakado/Rixa) considering 10 Hrs. as working day hours
Modeofmeasurements&payment:
TherateshallbeforaunitofDay
ItemNo. Levellingororientationofexistinggullytrapchamberincl.Nece.masonryinCM1:6andplasterinC
47 M1:3etc.using oldG.T.stoneandcoveretc. comp.
Modeofmeasurements&payment:
Therateshallbefor aunitofNos
ItemNo. Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt
48 including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM
(1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement
plaster inside the catch pit in the proportion of CM (1:3) with out jali etc. comp. as
Catchpit shall be provided at every change of alignment, gradient or diameter
ofstormwaterdrains,Bendsandjunctionsinthesewer/drainshallbegroupedtogetherinchamberas far as
possoble. The maximum distance between inspection chambers shall be about
25meters.Wherethediameterofsewer/drainisincreased,thesoffitofthepipeshallbefixedatthesame level and
necessary slope given to the channel of manhole/inspection chamber. Theminimum internal sizes of
manhole/inspection chamber shall be as per the respective item
ofwork.Themanhole/inspectionchambershallbeconstructedasperthedetaileddrawingsandasdirected by
Engineer. The bed concrete and the brick masonry shall be constructed of suchthickness as shown on
drawing. The brick masonry shall be constructed in C.M. (1:5), plasteredon both faces with 15 mm
cement plaster in C.M. (1:3). The channel shall be semicircular in thebottom half and of diameter equal to
the sewer/drain. Above the horizontal diameter, the sidesshall be extended vertically to the same level as
the crown of the outgoing pipe and the top
edgeshallbesuitableroundedoff.Thebranchchannelsshallalsobesimilarlyconstructedwith
respecttothebenchingoutattheirjunctionwiththemainchannelasappropriatefallsuitable
rounded off in the direction of flow in the main channel shall be given. The channel at the
bottomof manhole/inspection chamber shall be plastered with C.M. (1:3) and finished
smooth. Rungsshall be provided in all manholes/inspection chambers over 0.6 mtr in
depth and shall be of castiron conforming to IS:5455. These rungs shall be fixed staggered
in two vertical runs,
mmaparthorizontallyand300mmc/cvertically.Thetoprungshallbe450mmbelowthemanhole/in
spection chamber cover and the lowest not more than 300 mm above the benching.The
manhole/inspection chamber framing and cover shall be of cast iron of specified weight
andshall conform to the requirements given in IS:1726. The covers and frames shall be
cleanly castand they shall be free from air and sand holes and from clod shuts. They shall
be neatly dressedand carefully trimmed. All castings shall be free from voids whether due
to shrinkage, gasinclusion or other causes.Covers shall have a raised chequered design
on the top surface toprovide an adequered nonslip grip. Cover shall be capable of easy
opening and closing and itshall be fitted in the frame in workmanship like manner. The
cover shall be gas tight and watertight. The size of covers specified shall be considered as
the clear internal dimensions of theframe.Coversand framesshall be coated with a
blackbituminous composition. The coatingshall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmlyembeded to correct alignment and level
in cement concrete on the top of the masonry. The itemshallbeexecutedasperthedetailed
drawingandasdirectedbyEngineer
Modeofmeasurements&payment:Therate shallbeforaunitofNos
ItemNo. Dismentaling tiled of stone floors laid in mortar ncluding stacking of serviceable materilas
49 and disposal of unserviceable materials with all lead and lift.
Modeofmeasurements&payment:
Therateshallbefor aunitofSmt
ItemNo. CatchPit Jali Fixing P/F FRC catch pit jali with frame clear opening opening etc. comp.. As
50 directed directed by engineer in charge.
(a) F.R.C. Strom Water Grating Set:-Grating(Jali): 740 x 740 x 90 mm square jali, 20:00 MT load
design, 90 x 2 mm MS flat allround, Frame: 600 x 600 mm clear opening, outer size- 900 x
900 x 165 mm. On the upper periphery of frame 25 x 3mm wide MS flat should be well
embded in concrete to protect the edges of frame
(b) F.R.C. Strom Water Grating Set:-Grating(Jali): 690 x 690 x 70mm square jali, 20:00 MT load
design, 70 x 2 mm MS flat allround, Frame: 600 x 600 mm clear opening, outer size:- 800 x
800 x 120 mm. On the upper periphery offrame 25 x 3mm wide MS flat should be well embed
in concrete to protect the edges of frame.
(c) F.R.C. Strom Water Grating Set:-Grating(Jali): 620 x 620 x 75 mm square jali, 20:00 MT load
design, 75x1.2mm MS flat allround,Frame: 500 x 500mm clear opening, outer size- 770 x
770 x 135 mm. On the upper periphery of frame 25 x1.5mm wide MS flat should be well
embed in concrete to protect the edges of frame.
Modeofmeasurements&payment:
Therateshallbefor aunitofset
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE
THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE
FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Seal and Signature of the Bidder Add.CityEngineer(West Zone)
Amdavad Municipal Corporation
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court Judgement and
also will be prosecuted by concerned authority. Because of the breach of any provision of child labour prohibition and
regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date
06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining
amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same
shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These
shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly
filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published
by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same
with the tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Clause : 6 "The contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the
prevailing AMC circulars issued from time to time."
SCHEDULE OF MAINTENANCE
Maintenance schedules for municipal drainage systems vary depending on the city and the type of
infrastructure (stormwater vs. sewage).The maintenance shall be of these two basis.: preventive
maintenance (scheduled) and reactive maintenance (complaint-based).
The contractor shall execute maintenance and upgradation works as directed by the client and through
self-inspection under the instructions of the Engineer-in-Charge.
Surveying of lines and manholes for the specified works shall be undertaken as and when required on the
designated roads, as instructed by the Engineer-in-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with priorities
determined by the Engineer-in-Charge:
* CCRS complaints
* Complaints from MLAs/Councilors
* Complaints from officials
The specific lines and machinholes shall be surveyed as per below schedule as specified.
1. Ward Office: Visit Ward s office every week take the road detail on which the schedule
inspection to be done and carry the survey of machineholes ,lines as specified by EIC.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u)
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh
ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNto JJtlt hnuNu. ftuLx[tfxhtuyu
xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e
s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS<
hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS<
hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g
jFJtltu hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu
ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx,
vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm
duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle
mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf:
LED/WRT/e-file/11/2024/0293/M2 Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 39.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .