Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹11.3 L
EMD Value
₹11,400
Closing Date
9 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Bargarh Irrigation Division Bargarh
Canal Colony, Bargarh
SHIFTING OF LT AND 11KV LINE AND SUBSTATION FOR CONSTRUCTION OF RIVER EMBANKMENT CUM RING ROAD ON THE LEFT BANK OF RIVER JEERA FROM SAI MANDIR TO RUHUNIA, BARGARH
2026_CEBBU_125223_1
BID-07 of 2025-26 dated 15.01.2026
Open Tender
Electrical Works
Percentage
30 days
Bargarh
2 documents required · 2 mandatory
₹6,000
₹11,400
Yes
10 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
31 Jan 2026 - 7 Feb 2026
Cost of PSC pole supports 300 kg & 9 mtr long including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost of Transformer / Breaker / Joist Pole supports 11 mtr long 150*150 mm Joist Pole including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost of Transformer / Breaker / Joist Pole supports 13 mtr long 150*150 mm Joist Pole including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Construction of D.P mounted 11/4kv s/s with double disc….25 kva transformer. (excluding pole and transformer) (polymer type) common material including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Construction of D.P mounted 11/4kv s/s with double disc….250 kva transformer. (excluding pole and transformer) (polymer type) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost of 100 mm2 alloy aluminium XLPE insulated conductor including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost analysis of 1km of 3-ph 50mm2 AB Cable on 9 mtr*300 kg. PSC pole for LT line(30 mtr. Span)(excluding pole) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
cost of LT stay set including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
11KV single pole cut point(excluding pole)(polymer) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
11kv Intermidiate rsj/psc pole including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost of construction of Boundary wall with Grill Gate For S/S including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost of metal spreading including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Cost of Plinth including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Dismantle Cost of 11 KV Line including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
Dismental Cost Of LT Line including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge.
finance_578374.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_578374.xls
BOQ • 0.27 MB
BiddocumentElectry.pdf
Tender Documents • 2.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .