Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BLOCK M PHASE 15TH FLOOR NEW ALIPUR MARKET COMPLEX KOLKATA WEST BENGAL INDIA 700053 | KOLKATA | WEST BENGAL | 700053 | Admitted-Finance |
| 2 | Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
8 Dec 2021, 2:00 pmClosed
As per NIT
As per NIT
Effluent Treatment Plant for LuPech J18 Project IOCL Gujarat Refinery
2021_REFHQ_141815_1
077154C/T/LuPech(J18)/PACKAGE6
Open Tender
Lump Sum TurnKey
Lump-sum
630 days
Vadodara
As per NIT
5 documents required · 5 mandatory
Exempted
Online
4 Feb 2022
6 Oct 2021
9 Dec 2021
6 Oct 2021
8 Dec 2021
5 Nov 2021
6 Oct 2021 - 20 Oct 2021
20 Oct 2021
Amount
Project Management, Consistency Checks, Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, enabling jobs, Topography Survey, Soil Investigation mentioned in the bid and co-ordination for the same with Owner/PMC, Total Procurement (including chemicals, catalysts, first fill of chemicals and lubricants, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including Civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation and refractory works, Painting, Fireproofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific Operating & Maintenance manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel at site, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of Effluent Treatment Plant (ETP) with capacity of 385 m3/hr for Petrochemical and Lube Integration Project “LuPech” (J-18) Project at IOCL Gujarat Refinery, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period and supply of Chemicals, Tool & Tackles, Consumables, Lubricants etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAKUP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ANALYSERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DCS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ESD/PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for BATTERY CHARGER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for AC UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HVAC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFD Panels as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR PACKAGE-06 AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION
Description of Work / Item(s)
Amount
Operation and Maintenance Contract for three years as per the detailed scope of work defined in the bidding document
Supply Portion ( Supply of all materials including Chemical, Oil and Lubricants etc after 6 months operation)
Service Portion
Total Value
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .