Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | ₹3.4 L | L1 | Accepted-AOC Admitted in Tech.evaln. subject to the decision on Fin. Evaln. |
| 2 | L2₹3.5 LRejected-AOC CHITTATTUVADAKKEL THIRUVAMBADY | THIRUVAMBADY | KERALA | ₹3.5 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| 3 | L3₹3.6 LRejected-AOC | ₹3.6 L | L3 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | SARATH SEBASTIAN L2 | NIHAL AHAMMED P L3 | Rasheed L1 |
|---|---|---|---|---|---|---|
| 1.00DRAINAGE | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 48.58 | cum | 170 ₹8,257.75 | 305 ₹14,815.38 | 293.54 ₹14,258.71 |
| 1.00 | OD301091/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and and consolidation by ramming etc complete for improving the CBR value of subgrade | 4.67 | cum | 900 ₹4,207.50 | 1,950 ₹9,116.25 | 781.87 ₹3,655.24 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.67 | cum | 7,700 ₹35,997.50 | 7,890 ₹36,885.75 | 7,000.36 ₹32,726.68 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 165.75 | sqm | 230 ₹38,122.50 | 345 ₹57,183.75 | 314.88 ₹52,191.36 |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 14.88 | cum | 8,000 ₹1.2 L | 6,205 ₹92,299.38 | 7,404.2 ₹1.1 L |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.01 | cum | 7,500 ₹52,597.50 | 9,744 ₹68,334.67 | 8,569.44 ₹60,097.48 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 771.38 | kilogram | 120 ₹92,565 | 104.1 ₹80,300.14 | 91.62 ₹70,673.38 |
Tender Value
₹3.9 L
EMD Value
₹9,670
Closing Date
23 Feb 2026, 6:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF ASSISTANT ENGINEER LID EW SECTION, THIRUVAMBADY GP
THIRUVAMBADY GP 63/26 KONNALATH CHERUKAYIL PADI DRAINAGE NAVEEKARANAM
2026_LSGD_836474_1
11/2025-26/AE/LID EW/TDY
Open Tender
Civil Works - Roads
THIRUVAMBADY GP
Please refer Tender documents.
10 documents required · 10 mandatory
₹855
Yes
₹9,670
Yes
29 Apr 2026
16 Feb 2026
25 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
DRAINAGE
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD301091/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and and consolidation by ramming etc complete for improving the CBR value of subgrade
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1408162.xls
BOQ • 0.30 MB
SBD63.pdf
Tender Documents • 2.16 MB
Download all tender documents and submit your bid