| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.1 LAccepted-AOC TP 479 KULANGARAYIL THODIYOOR NORTH P O VENGARA KARUNAGAPALLY KOLLAM 690 523 | KARUNAGAPALLY | KOLLAM | KERALA | 690523 | L1 | Accepted-AOC please see summary | |
| 2 | L2₹1.0 Cr+₹1.1 L (1.09%)Rejected-Finance | L2 | Rejected-Finance please see summary | |
| 3 | L3₹1.1 Cr+₹13.5 L (13.6%)Rejected-Finance PB NO 04 KARUNAGAPALLY KOLLAM 690 518 | KARUNAGAPALLY | KOLLAM | KERALA | 690518 | L3 | Rejected-Finance please see summary |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
23 Mar 2021, 6:00 pmClosed
Manager(Commercial)
Travancore Titanium Products Limited Kochuveli Trivandrum 695 021
AMC for Structural repair works in TTP
2021_TTPL_420189_1
TTP/CD/CN/SR-29/RT/AMC Structural/C/20-21
Open Tender
Miscellaneous Works
Item Rate
365 days
Travancore Titanium Products Ltd.
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹50,000
Yes
9 Nov 2021
8 Mar 2021
25 Mar 2021
8 Mar 2021
23 Mar 2021
8 Mar 2021
8 Mar 2021 - 22 Mar 2021
AMC for Structural repair works in TTP
Labour charges for repairing/modifying and replacing the damaged steel structurals such as column, beam, staircase, purlin, trusses, bracing, bracket etc of the building at various levels up to height of 25.3 m including charges for fabricating members to size, conveying it to the site, lifting and fitting in position either by welding or by bolting, painting with iron primer one coat and two over coats with rubber baseed paint after cleaning the surface thoroughly, cost of welding rods, cutting gas , hire of tools and charges for scaffolding also conveying MS materials from store etc and debris to the dumpyard etc complete
Labour charges for strengthening the corroded steel structurals such as columns, beams and other structurals of buildings at various levels upto a height of 25.3 m by continuous welding of two rows with MS plate of various thickness as directed by the officer in charge including charges for fabricating, conveying it to the site, lifting and fitting in position either by welding or by bolting, painting with iron primer one coat and two over coats with rubber based paint after cleaning and scrapping the surface including charges for chipping and removing the cement concrete foundation if necessary and then reconstructing the foundation as it was and also including cost of welding rods, cutting gas, hire of tools and charges for scaffolding etc and also conveying MS materials from store and debris to the dumpyard etc complete as per the directions of engineer in charge.
Labour charges for dismantling, removing and lowering damaged and corroded MS section from the building at various level up to a maximum height of 25 m including charges for conveying and dumping the same in dump yard, hire of tools and cost of cutting gas etc. complete.
Labour charges for fabrication and erection of hand rails in various floors at different levels with MS angle 65 x 65 x 6 mm at about 1.2 m c/c 25 mm dia pipes for horizontals, toe board using MS flat and painting one coat metal primer and two over coats with rubber based paint after scrapping and cleaning the surface including charges for scaffolding, cost of cutting gas and welding rod, hire of tools etc. complete as per the direction of the Engineer in charge
Labour charges for fabricating and erection of 25mm dia MS pipe for horizontaling the damaged portion of the hand rails including cutting the damaged pipe, removing, lowering, conveying & dumping the same in the scrap dump yard, painting the pipe with one coat two over coats with rubber based paint after scrapping , cleaning the surface thoroughly including charges for scaffolding, hire of tools, cost of cutting gas and welding rod etc. complete.
Labour charge for fabrication and erection of staircase steps, platforms, walkways etc with MS chequered plate or MS plate of any thickness/ PVC grating including: a) Dismantling, removing and lowering corroded and damaged plates wherever necessary and debris to the dump yard b) Cutting new plate to required size and shape fixing in position either by welding (full run) or by bolting and fixing the PVC grafting properly in the MS frame work c)painting the same with iron primer one coat and two over coat with rubber based paint after scrapping and cleaning the surface thoroughly etc. complete as per the direction of the Engineer in charge
Labour charges for cutting & removing corroded portion of members of tubular trusses on the roof wherever necessary, conveying and dumping the MS corrored pipe and MS structurals the scrapyard, charges for fabrication of new members of 40mm dia or nearest available size and required length and fixing in position by welding or bolting, painting the same with iron primer one coat and two over coat with rubber based paint after scrapping and cleaning the surface thoroughly including charges for removing purlin if required and refixing the same after repairing work, providing protective covering to prevent rust or dust falling over materials kept in store and cutting gas, charges for scaffolding etc. complete as per the direction of Engineer in charge
Labour charges for fabricating and fixing the tubular purlin on the roof with 50mm dia or nearest available size of MS pipe by welding or by bolting as the case may after dismantling the corroded purlin without causing any damage to remaining structurals including charges for lowering, conveying and dumping the dismantled purlin to the yard and painting the new purlin with iron primer one coat and two over coats with rubber based paint after scrapping and cleaning the surface thoroughly, charges for welding necessary cleats, MS plate on the roof trusses and flats at the end of the purlin providing the protective cover to prevent the rust or dust falling over material kept in store, cost of cutting gas ,welding rod, hire of toots and charges for scaffolding etc. complete as per the direction of the Engineer in charge
Labour charges for dismantling the wooden floor for repairing the steel structurals including charges for refixing the same after completion of the repair work. Cost of all labours, hire of tools, charges for scaffolding, all other connected works etc. complete as per the direction of the Engineer in charge
Labour charges for dismantling & removing the ridges( in pair) barge board/ apron sheet etc. or the roof of building without causing any damage, stacking at nearby site for reuse and refixing the same after repairing work including cost of all labour, hire of tools, charges for scaffolding etc. complete as per the direction of officer in charge.
Labour charges for dismantling & removing the AC roofing sheet and stacking the material for structural repair work without causing any damage to the sheet and refixing the same after repairing works including cost of all labours ,hire of tools, charges for scaffloding etc. complete as per the direction of officer in charge
Providing non- asbestos high impact Polypropylene reinforced cement 6 mm thick corrugated sheets (as per IS: 14871) roofing up to any pitch and fixing with polymer coated J or L hooks, bolts and nuts, 8 mm dia G.I. plain and bitumen washers or with self drilling fastener and EPDM washers etc. complete (excluding the cost of purlins, rafter and trusses), including cutting sheets to size and shape wherever required.
Providing and fixing ridges and hips in non-asbestos fibre cement high impact polypropylene reinforced roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc. complete.Corrugated serrated adjustable ridges
Providing and fixing non- asbestos fibre cement high impact polypropylene reinforced roofing accessories in all colours with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain and bitumen washers or with self drilling fastener and EPDM washer etc. complete:Corrugated apron pieces
Providing and fixing non- asbestos fibre cement high impact polypropylene reinforced roofing accessories in all colours with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain and bitumen washers or with self drilling fastener and EPDM washer etc. complete:Barge boards
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Labour charges for plain cement concrete nominal mix 1:2:4 using 20mm/40mm metal including charges for compacting the concrete while laying, ramming, watering, curing, lifting and conveying the material from store etc complete as per direction of engineer in charge
Centering and shuttering including strutting, etc. and removal of form for concrete
Labour charges for reinforcement for RCC works, bending, tying and placing in position at any level including charges for conveying the material from store etc.complete as per direction of engineer in charge
Labour charges for reinforced cement concrete (above plinth level) nominal mix 1:2:4/ 1:12:3 using 20mm broken stone, inluding charges for mixing, placing, compacting, water curing etc. also charges for conveying the material to the site from store/ TiO2 plant area, etc. complete as per direction of engineer in charge
Labour charges for reinforced cement concrete nominal mix 1:2:4/ 1:12:3 using 20mm broken stone, inluding charges for mixing, placing, compacting, water curing etc. also charges for conveying the material to the site from store/ TiO2 plant area, etc. complete as per direction of engineer in charge
Labour charges for Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete as per direction of engineer in charge.
Labour charges for Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete as per direction of engineer in charge.
Praveen T.T
HIND ERECTORS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .