| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.1 LAccepted-Finance | ₹72.1 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹72.1 LRejected-Finance | ₹72.1 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹89.3 LRejected-Finance | ₹89.3 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/s DATTAKRUPA CONSTRUCTIONS L2 | jeni associates L1 | M/s Ravalnath Constructions L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, ,silt clay,gravel,moorum of all verieties shingles,pebbles,all types of conglomarets ,laterite rock,soft rock, disintegrated or weathered rock, fissured shattered, decomposed rock, and such materials either in full or parts,as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling,wedging etc. but blasting prohibited in all conditions such as dry, ist,saturated,submerged,foul conditions etc. including pumping or bailing out water/ dewatering including setting out constructed of shoring and bracing, removel of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within a 50m lead and with all lifts etc. as per specification & drawing and directed by Engineer-in -Charge etc. complete : All kinds of soil | 1,343 | Cum | 400 ₹5.4 L | 130.12 ₹1.7 L | 214.5 ₹2.9 L |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 68 | Cum | 1,769 ₹1.2 L | 1,400.44 ₹95,229.92 | 1,658.25 ₹1.1 L |
| 3.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile | 850 | Metre | 580 ₹4.9 L | 117.5 ₹99,875 | 144 ₹1.2 L |
| 4.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) : Upto 2.5 meters long pile | 714 | Metre | 570 ₹4.1 L | 90.01 ₹64,267.14 | 228.75 ₹1.6 L |
| 5.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 894 | Cum | 6,000 ₹53.6 L | 6,000.07 ₹53.6 L | 5,534.56 ₹49.5 L |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete. | 1,496 | Sq.m | 400 ₹6.0 L | 200.09 ₹3.0 L | 305.25 ₹4.6 L |
| 7.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : 75 mm dia | 161 | RM | 300 ₹48,300 | 100.93 ₹16,249.73 | 140.73 ₹22,657.53 |
Tender Value
₹90.2 L
EMD Value
₹1.8 L
Closing Date
24 Nov 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of retaining wall from Rashtroli Mantap to Bus Stop Revora at Ward No. 1 at Tank, Wada in V.P. Revora in Tivim Constituency.
2025_WRD_26246_1
6-9/WDI/WRD/ASW/2025-26/e-30/2
Open Tender
Miscellaneous Works
180 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.8 L
7 Apr 2026
13 Nov 2025
25 Nov 2025
13 Nov 2025
24 Nov 2025
13 Nov 2025
Amount
Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, ,silt clay,gravel,moorum of all verieties shingles,pebbles,all types of conglomarets ,laterite rock,soft rock, disintegrated or weathered rock, fissured shattered, decomposed rock, and such materials either in full or parts,as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling,wedging etc. but blasting prohibited in all conditions such as dry, ist,saturated,submerged,foul conditions etc. including pumping or bailing out water/ dewatering including setting out constructed of shoring and bracing, removel of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within a 50m lead and with all lifts etc. as per specification & drawing and directed by Engineer-in -Charge etc. complete : All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) : Upto 2.5 meters long pile
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level
Centering and shuttering including strutting, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : 75 mm dia
jeni associates (BID ID -56909)
M/s DATTAKRUPA CONSTRUCTIONS (BID ID -56325)
stage.html
html • 0.04 MB
technical_26686.pdf
techsummary_26686.pdf
finance_26686.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_26686.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid