Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC VILL BHARAPUR P O DHAULAKUAN TEHSIL PAONTA SAHIB DISTT SIRMAUR H P 173001 | PAONTA SAHIB | SIRMAUR | HIMACHAL PRADESH | 173001 | ₹7.7 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹7.8 LRejected-Finance VILL MEHAT PO KANSAR TEHSIL POANTA SAHIB DISTT SIRMOUR H P | SIRMOUR | HIMACHAL PRADESH | ₹7.8 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹7.8 LRejected-Finance JOGINDER NAGAR | SHAHID BHAGAT SINGH NAGAR | PUNJAB | 144509 | ₹7.8 L | L3 | Rejected-Finance L3 bidder |
Tender Value
Refer Docs
EMD Value
₹7,690
Closing Date
17 Apr 2026, 10:00 amClosed
Dy. Chief Engineer
Generation circle HPSEBL shaktinagar nahan
E-Tender for Operation of Pump House during peak rainy season in Giri Power House for three months.
2026_HPSEB_133915_1
SEGN/DB-Bid-07/2025-26
Open Tender
Electrical Works
92 days
Giri Power House Giri Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹7,690
19 May 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Operation of cooling water pumps (3 Nos.) and vacuum pumps (2 Nos.) in Pump House during monsoon season by opening / closing the inlet & outlet valves, starting / stopping the pumps, cleaning of choked strainer by opening the top lid nut bolts with suitable size of spanners. Extracting out the chocked strainer bucket, taking it at the plate form (made for the purpose) so as to remove the trash, cleaning the strainer bucket with wire brush, flushing with water jet and then refitting the strainer bucket & tightening the top lid as per directions of the Engineer-in-Charge round the clock in Giri Power House including cleaning of Pump House floor i.e. manual carriage of debris, trash, muck outside the periphery of Power House and ensure the complete cleaning of floors regularly. All necessary T&P for opening & closing and cleaning of strainer, insurance charges of deployed persons to be provided by contractor any other work assigned by the Engineer-in-Charge during monsoon season at Pump house in three number shifts per day of eight hours each with four persons i.e 4 Un-skilled labour in each shift round the clock as per the direction and entire satisfaction of Engineer-in-Charge. | 92 | Days | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_197991.xls
BOQ • 0.23 MB
SBD.pdf
Tender Documents • 3.14 MB
Download all tender documents and submit your bid