| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 CrAccepted-Finance 1 1 PUNJABI COLONY VIKASNAGAR | ₹1.4 Cr | L-1 | Accepted-Finance PRICE QUOTED LOW |
| 2 | L-2₹1.4 Cr+₹4.1 L (2.99%)Rejected-Finance K BLOCK 202 AAROGYAM RESIDENTS WALFARE ASSOCIATION OPP CRYSTAL WORLD N H 58 P O PATANJALI YOGPEETH HARIDWAR | ₹1.4 Cr+₹4.1 L (2.99%) | L-2 | Rejected-Finance PRICE QUOTED HIGH |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
29 Oct 2020, 6:55 pmClosed
SE IRRIGATION WORKS CIRCLE HARIDWAR
OFFICE OF SUPERINTENDING ENGINEER IRRIGATION WORKS CIRCLE HARIDWAR
Repairing and strengthening work of existing roads in Har-ki-Pauri area in Bahadrabad block.
2020_IRDCE_26831_1
05/SE/2020-21
Open Tender
Civil Works
Item Rate
60 days
DISTRICT HARIDWAR
AS PER STANDARD BIDDING DOCUMENT
3 documents required · 3 mandatory
₹5,900
EXECUTIVE ENGINEER IRRIGATION DIVISION HARIDWAR
₹3.6 L
IRRIGATION WORKS CIRCLE HARIDWAR
28 Dec 2020
16 Oct 2020
30 Oct 2020
16 Oct 2020
29 Oct 2020
17 Oct 2020
17 Oct 2020
Amount
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately
Plain/ Reinforced Cement Concrete in open foundations complete as per drawing and technical specifications Clause 802, 803, 1202 & 1203: - Nominal mix 1:3:6
Cement Concrete (PCC M-30) Pavement:- Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thickpolythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications.
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on GI pipe 50 mm dia firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 900 mm equilateral triangle
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack coat using VG-10 grade bitumen Over dry and hungry bituminous surfaces @0.40 kg/sqm
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II (bituminous binder @ 5.4 % of mix)
Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
Providing and laying microsurfacing course, comprising of dry fine aggregates conforming to grading of specification as per IRC: SP-81- 2008, polymer /latex modified cationic bitumen emulsion, Ordinary portland cement as filler, chemical additives and water, including proportioning, mixing and laying of microsurfacing coarse using mechanised machine and laying unit all complete as per IRC SP-81 and MORTH specifications and direction of Engineer in charge.Grading -II (Fine aggregate Type II grading @ 9.6 kg/sqm, modified emulsion @ 8.5 % by weight of dry aggregates, Cement @ 1.25 % by weight of dry aggregate and Additive @ 1.25 % by weight of dry aggregate)
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973)
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Gravel/Soil-Aggregate Base (Table 400.2) Grading A Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 For road widening
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Earth filling (For marshy soil)
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Type - A, "W" : Metal Beam Crash Barrier(Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side
SUSHEEL CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .