Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC KEDLA NAGAR 09 P O KEDLA P S MANDU DISTT RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L1 | Accepted-AOC Due to L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
₹3.2 L
EMD Value
₹4,000
Closing Date
14 May 2025, 6:00 pmClosed
Project Engineer (Excavation), Tapin North OCP
Office of Project Engineer (Excavation), Tapin North OCP, Hazaribagh Area
Repairing of 02 Nos. welding transformers 40KVA and repairing of 02 Transformers 63KVA, 3.3KV/220V for EKG Shovel of Tapin North OCP.
2025_CCL_334688_1
PE(X)/Tapin (N) OCP/NIT/25-26/06 Dated 28.04.2025
Open Tender
Excavation Department Work
Item Rate
15 days
Tapin North OCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
21 Jul 2025
29 Apr 2025
16 May 2025
29 Apr 2025
14 May 2025
29 Apr 2025
29 Apr 2025 - 3 May 2025
Amount
A. Repairing welding Transformer: Cost of Copper Wire with DPC covering, size 14 SWG (Value Calculated after subtracting Scrap Value @ 60% of material used)
Cost of Insulation @15% of Wire Cost
Labour cost @ 15% of Wire Cost
Fiber sheet for separator
Repairing of Regulator
Stud with insulator
Railing pipe – 1” for railings
Industrial gas set for straightening of metal sheet, cover, support structure ,platform of welding machine & removing of bulged material from base plate.
Welding electrode for material filling in base plate, support structure & platform of welding machine. [Lomelt 210]
Highly skilled – 01 person per shift X 04 days
skilled – 01 person per shift X 04 days
Welder – 01 person X 02 Days
Semi-skilled – 02 person per shift X 04 days
Contractor profit @10%
B. Transformer 63KVA: Cost of Copper wire with DPC covering, size – 14 SWG (Value Calculated after subtracting Scrap Value @ 60% of material used)
Cost of Insulation @15% of Wire Cost
Labour cost @ 15% of Wire Cost
Brass studs with bushings
Nuts, Bolts and Washers
Highly skilled – 01 person per shift X 08 days
skilled – 02 person per shift X 08 days
Semi-skilled – 03 person per shift X 08 days
Contractor profit@10%
Total impact of GST for the purpose of CTC
SRI SAI ENTERPRISES (BID ID -1151762)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .