| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC AT SAIGHAR P O GHOLER P S RAJKANIKA DIST KENDRAPARA PIN 754227 | KENDRAPARA | ODISHA | 754227 | ₹17.8 L | L1 | Accepted-AOC winner of lottery |
| 2 | L1₹17.8 LRejected-AOC | ₹17.8 L | L1 | Rejected-AOC loser of lottery |
| 3 | L2₹17.9 LRejected-AOC | ₹17.9 L | L2 | Rejected-AOC Not qualify for lottery due to 2rd lowest bidder |
| 4 | L3₹18.1 LRejected-AOC AT SATATIRA PO BHAGANAI PS GHASIPURA DIST KEONJHAR PIN 758043 | GHASIPURA | KEONJHAR | ODISHA | 758043 | ₹18.1 L | L3 | Rejected-AOC Not qualify for lottery due to 3rd lowest bidder |
| 5 | L4₹18.1 LRejected-AOC AT ANDOLA P O SRIDHARPUR PS JAJPUR TOWN DIST JAJPUR ODISHA 755062 | JAJAPUR | ODISHA | 755062 | ₹18.1 L | L4 | Rejected-AOC Not qualify for lottery due to 4th lowest bidder |
Tender Value
₹22.4 L
EMD Value
₹22,435
Closing Date
22 Apr 2026, 5:00 pmClosed
SE Kanupur Reh. C and B Division Basudevpur
O/o SE Kanupur Reh. C and B Division Basudevpur
Construction of boundary wall of Community Centre along with Slab to Existing Drain and Approach road to community centre, anganwadi Centre and post Office at Dhoblabeda (Daduan) R and R Colony for the DPs of village Daduan of KIP
2026_KPRIP_128092_3
SE,KRC AND BD-01(2026-27)
National Competitive Bid
Civil Works - Buildings
120 days
SE Kanupur Reh. C and B Division Basudevpur
Please refer tender documents
3 documents required · 3 mandatory
₹6,000
₹22,435
Yes
11 Jun 2026
13 Apr 2026
23 Apr 2026
13 Apr 2026
22 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil with all leads, lifts delifts, rough dressing, breaking clods and levelling the bed etc complete as per direction of the Engineer-in-Charge | 1 | Cum | - | - | BI01010001010000000000000515BI0100002001 |
| 2 | Filling foundation and plinth with excavated material with well compacted etc. complete as per the direction of the Engineer-in-charge. | - | Cum | - | - | BI01010001010000000000000515BI0100002002 |
| 3 | Supplying & filling foundation & plinth with sand well watered and rammed including all cost, conveyance, royalty of materials, labour charges, T & P etc. complete as per the direction of the Engineer-in -Charge | 1 | Cum | - | - | BI01010001010000000000000515BI0100002003 |
| 4 | Cement concrete ( 1:3:6) in foundation and floors (i.e below the base course of terrace flooring using 4 cm size black hard crusher broken granite stone metal (free from weathered skinned & debris etc.) of approved quality including cost and conveyance royalities of all materials and cost of all labour with T& P required for the work complete and as directed by the Engineer-in-charge . | 1 | Cum | - | - | BI01010001010000000000000515BI0100002004 |
| 5 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying etc complete and as per the Direction of the Engineer-in-charge. | 1 | Cum | - | - | BI01010001010000000000000515BI0100002005 |
| 6 | Rigid & smooth centering and shuttering for R.C.C.works including falseworks and dismentaling then after casting including cost of materials etc.complete.as per direction of the Engineer-in-Charge .a) Foundation footing and column base & plinth beam | - | Sqm | - | - | BI01010001010000000000000515BI0100002006 |
| 7 | b) Column & beam (i) Ground floor | - | Sqm | - | - | BI01010001010000000000000515BI0100002007 |
| 8 | c) Lintel (i) Ground floor | 1 | Sqm | - | - | BI01010001010000000000000515BI0100002008 |
| 9 | d)Slab | - | Sqm | - | - | BI01010001010000000000000515BI0100002009 |
| 10 | Providing F.A. Brick masonry in C.M. (1:6) using well burnt F.A. bricks of approved quality having crushing strength not less than 75 kg/cm2 in including all costs, conveyance, royalty of all materials and cost of all labour with T & P required for the work and with all leads, lifts & delifts including watering, curing & scaffolding etc. all complete as per per drawing & specification and as directed by the Engineer-in-charge. B)Super Structure | 1 | Cum | - | - | BI01010001010000000000000515BI0100002010 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
BWallCommunity.pdf
Tender Documents • 1.32 MB
BOQ_587732.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid