Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.90Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.40+₹2.50 (277.8%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.03+₹3.13 (347.8%)Admitted-Finance 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASIAN GEOTECH RESEARCH SERVICES L1 | IRCLASS SYSTEMS AND SOLUTIONS PRIVATE LIMITED L3 | M/s. CADD CONSULING ENGINEERS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00Fees for Construction Supervision with 3rd Party Quality Control as per TOR.* ( as per RfP document) as % of Estimated Project Cost in INR Expl:- 2.36% = 2.36 | ||||||
| 1.01 | Fees for Construction Supervision with3rd Party Quality Control as per TOR.*
( The consultancy fee shall include all fees, incidental charges and expenses to be delivered as per scope of work including travel & staying, etc. GST shall be paid extra as applicable as per GST Act. TDS shall be deducted as applicable as per Act.) | 1 | Percentage | 0.9 ₹0.9 Lowest | 4.03 ₹4.03 | 3.4 ₹3.4 |
Tender Value
₹10 Cr
EMD Value
₹10,000
Closing Date
3 May 2023, 5:00 pmClosed
CGM(C), OMC Ltd.
Office of the CGM(C), OMC Ltd., Bhubaneswar
Selection of Consultant ForProviding 3rd Party quality control of different infrastructure projects of OMC Ltd of Gandhamardan region and Koira Region
2023_OMC_87822_3
RfP.10/OMC/CIVIL/2023
Open Tender
Miscellaneous Services
Item Rate
1080 days
Gandhamardan and Koira
Empanelled Consultants of OMC under category Supervision of Building including steel structure ,Preparation of DPR for building and Supervision of Road and Bridge Projects, Preparation of DPR for Road and Bridge projects.
2 documents required · 2 mandatory
₹7,080
₹10,000
Yes
18 May 2023
12 Apr 2023
4 May 2023
12 Apr 2023
3 May 2023
12 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Fees for Construction Supervision with 3rd Party Quality Control as per TOR.* ( as per RfP document) as % of Estimated Project Cost in INR Expl:- 2.36% = 2.36 | |||||
| 1.01 | Fees for Construction Supervision with3rd Party Quality Control as per TOR.*
( The consultancy fee shall include all fees, incidental charges and expenses to be delivered as per scope of work including travel & staying, etc. GST shall be paid extra as applicable as per GST Act. TDS shall be deducted as applicable as per Act.) | - | Percentage | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
SBD_3.pdf
Tender Documents • 1.83 MB
BOQ_433923.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .