Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.90Admitted-Finance | ₹0.90 | L1 | Admitted-Finance |
| 2 | L2₹3.40Admitted-Finance | ₹3.40 | L2 | Admitted-Finance |
| 3 | L3₹4.03Admitted-Finance 52 A 6TH FLOOR INDUSTRIAL DIVISION ADI SHANKARACHARYA MARG OPP POWAI LAKE POWAI MUMBAI MUMBAI MAHARASHTRA 400072 MH19E0037546 27AADCI5198M1ZX B M R MSME STATUS AS NOT VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹4.03 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASIAN GEOTECH RESEARCH SERVICES L1 | IRCLASS SYSTEMS AND SOLUTIONS PRIVATE LIMITED L3 | M/s. CADD CONSULING ENGINEERS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00Fees for Construction Supervision with 3rd Party Quality Control as per TOR.* ( as per RfP document) as % of Estimated Project Cost in INR Expl:- 2.36% = 2.36 | ||||||
| 1.01 | Fees for Construction Supervision with3rd Party Quality Control as per TOR.*
( The consultancy fee shall include all fees, incidental charges and expenses to be delivered as per scope of work including travel & staying, etc. GST shall be paid extra as applicable as per GST Act. TDS shall be deducted as applicable as per Act.) | 1 | Percentage | 0.9 ₹0.90 | 4.03 ₹4.03 | 3.4 ₹3.40 |
Tender Value
₹10 Cr
EMD Value
₹10,000
Closing Date
3 May 2023, 5:00 pmClosed
CGM(C), OMC Ltd.
Office of the CGM(C), OMC Ltd., Bhubaneswar
Selection of Consultant ForProviding 3rd Party quality control of different infrastructure projects of OMC Ltd of Gandhamardan region and Koira Region
2023_OMC_87822_3
RfP.10/OMC/CIVIL/2023
Open Tender
Miscellaneous Services
1080 days
Gandhamardan and Koira
Empanelled Consultants of OMC under category Supervision of Building including steel structure ,Preparation of DPR for building and Supervision of Road and Bridge Projects, Preparation of DPR for Road and Bridge projects.
2 documents required · 2 mandatory
₹7,080
₹10,000
Yes
18 May 2023
12 Apr 2023
4 May 2023
12 Apr 2023
3 May 2023
12 Apr 2023
Amount
Fees for Construction Supervision with 3rd Party Quality Control as per TOR.* ( as per RfP document) as % of Estimated Project Cost in INR Expl:- 2.36% = 2.36
Fees for Construction Supervision with3rd Party Quality Control as per TOR.* ( The consultancy fee shall include all fees, incidental charges and expenses to be delivered as per scope of work including travel & staying, etc. GST shall be paid extra as applicable as per GST Act. TDS shall be deducted as applicable as per Act.)
M/s. CADD CONSULING ENGINEERS PRIVATE LIMITED
IRCLASS SYSTEMS AND SOLUTIONS PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
SBD_3.pdf
Tender Documents • 1.83 MB
BOQ_433923.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid