Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.3 LAdmitted-Finance | -2.44% | ₹23.3 L | L1 | Admitted-Finance |
Tender Value
₹23.9 L
EMD Value
₹47,800
Closing Date
18 Aug 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
Civil Work
2026_UITKo_589476_1
NIT 16/2026-27 (69)
Open Tender
Civil Works
Percentage
60 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
2000 Secrectry KDA, 500 MD RISL
₹47,800
Yes
20 Aug 2026
17 Aug 2026
19 Aug 2026
17 Aug 2026
18 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means | |||||
| 1.1 | Bituminous Courses & Granular Courses | 52.5 | cum | 100 | ₹5,250 |
| 2 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. | 42 | sqm | 500 | ₹21,000 |
| 3Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects | |||||
| 3.1 | for Grading-I ( 19 mm nominal size ) Bitumen (VG-30) | 105 | P.cum | 7,956 | ₹8,35,380 |
| 4Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30) | |||||
| 4.1 | Grading - I (37.50mm (Nominal Size)) | 210 | P. Cum | 6,786 | ₹14,25,060 |
| 5 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 2,100 | Sqm | 9.6 | ₹20,160 |
| 6 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base (Stablised soil baes/Crusher Run Macadam) including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per MoRTH Specification Clause 502. | 2,100 | Sqm | 39 | ₹81,900 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
Special_Condition_69.pdf
Tender Documents • 0.43 MB
BOQ_1046868.xls
BOQ • 0.29 MB
Corrigendum16-69.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].