Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Agreement executed |
Tender Value
₹9.3 L
EMD Value
₹23,303
Closing Date
16 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEEER PWD ROADS SUB DIVISION NEDUMKANDAM
GENERAL-General RM / RC II Phase I 2023 24 /One year RC 2 Zone IV-For various roads under Roads section Santhanpara Idukki District 2 roads stretches for a length of 15.560km.
2023_PWD_632568_2
11/AEE/2023-24
Open Tender
Civil Works - Roads
Item Rate
365 days
NEDUMKANDAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,055
₹23,303
Yes
15 Feb 2024
4 Jan 2024
18 Jan 2024
4 Jan 2024
16 Jan 2024
4 Jan 2024
Amount
APPENDIX A: REACTIVE MAINTENANCE (INITIAL RECTIFICATION WORKS)
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
APPENDIX B: PRE MONSOON WORKS
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD65352/2023-2024:Engaging Small Tipper for Various works in roads as per the directions of Engineer in charge
OD65353/2023-2024:Engaging Backhoe loaders & excavators/Tracked Excavators for various works in roads as per the direction of Engineer in charge
OD65354/2023-2024:Supplying and stacking cold bituminous mix compound 25/50 kg cold mix bags an instant pothole filling mixture for repairs from authorized agencies as per indents, conveying and unloading carefully at stacking yard with out any damages and as per instruction of Engineer in charge including all incidental charges etc... complete
OD65355/2023-2024:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
OD183445/2023-2024:Engaging Wood cutter
OD187607/2023-2024:Providing and fixing Vinyl sticker with 1 years warranty including lettering and Symbols for existing DLP board 0.90*0.61m size including painting all exposed surface with two coat of epoxy painting etc complete.
OD192703/2023-2024:Providing and fixing of non retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
APPENDIX C:PROACTIVE/PREVENTIVE MAINTENANCE
OD65348/2023-2024:Supplying and stacking cold bituminous mix compound 25/50 kg cold mix bags an instant pothole filling mixture for repairs from authorized agencies as per indents, conveying and unloading carefully at stacking yard with out any damages and as per instruction of Engineer in charge including all incidental charges etc... complete
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD65350/2023-2024:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
OD65351/2023-2024:Conducting and Reporting Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period for the Running Contract as directed by Engineer in charge
APPENDIX D:EMERGENCY WORKS
OD65345/2023-2024:Engaging coolie/labour for miscellaneous works
OD65346/2023-2024:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD65347/2023-2024:Engaging JCB for removal of Slipped earth , other obstructions in the PWD road including fuel charges, Bata of driver and other all expenditure including etc. complete
Bidder Name
BABU K S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_974416.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .