| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC JIBI NIMMISH V B EAJADI P K MALAPPURAM 676102 | MALAPPURAM | MALAPPURAM | KERALA | 676102 | L1 | Accepted-AOC AEE/LIDEW-DIV/MPM/237/23-24 | |
| 2 | L2₹19.1 L+₹61,430.11 (3.33%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
26 Oct 2023, 6:55 pmClosed
EXECUTIVE ENGIEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
Annual Plan-Malappuram DP - (2023-24), Project No 241-24 -Constuction of Kalur Padashekaram Mankuthi Canal - Purathur-General Civil Work
2023_LSGD_614000_10
DB4/TN/17/23-24
Open Tender
Civil Works - Canal
Item Rate
330 days
MALAPPURAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,950
₹50,000
Yes
16 Nov 2023
18 Oct 2023
28 Oct 2023
18 Oct 2023
26 Oct 2023
18 Oct 2023
Amount
Construction of Canal
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
OD124480/2023-2024:Providing and fixing Granite of any colour and shade for Name board, of required size<br>laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all,<br>levels, including lettering & fixing
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
Pullat Assain Haji
Bidder Name
Pullat Assain Haji
SHIBIN KUMAR K S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_918879.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .